SDP Software Presented by Bill Clover and Brad Diggans Bill Clover

Slides:



Advertisements
Similar presentations
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Business Development Suit Presented by Thomas Mathews.
“The Honeywell Web-based Corrective Action Solution”
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Enterprise Content Management Departmental Solutions Enterprisewide Document/Content Management at half the cost of competitive systems ImageSite is:
ITIL: Service Transition
Employee Central Presentation
ORACLE ENTERPRISE ASSET MANAGEMENT
Enterprise Asset Management
Getting started on informaworld™ How do I register my institution with informaworld™? How is my institution’s online access activated? What do I do if.
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Introduction + irastah proposes a cost effective method of tracking a human's mobility using two technologies.
11 Configuration Management Site Configuration Management Case Study.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Westinghouse/Southern/SCANA – New Build Configuration Management
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
ING XBRL Proof of Concept July 19, ©2005 page 2. Utilizing XBRL  ING Objectives  Benefits  Goals  Proof of Concept Plan  Stat  USGAAP  Pain.
Standard Design Process Overview
US Army Corps of Engineers BUILDING STRONG ® Huntington District Floodplain Management Services Dan Bailey, CFM Huntington District August 2012.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
Copyright proFound Mining Ltd Throughout the slide show : Please just click your mouse or simply hit the key to advance the presentation.
Welcome to Greenville County’s Introduction of the new online Permitting System!
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Design Oversight Working Group (DOWG) – Next Steps
Title of presentation Name(s) of author / presenter / co-authors
Systems Analysis and Design in a Changing World, Fifth Edition
Doron Orbach UCMDB Product Manager
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
ITIL: Service Transition
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
InLoox 9 Web App Product Presentation
Chapter 8 Environments, Alternatives, and Decisions.
Software Configuration Management
Software Project Configuration Management
An Introduction to Attendance on Demand
Archiving and Document Transfer Utilities
Training Tracker – Employee Synchronization Overview
Chapter 11: Software Configuration Management
Cisco Data Virtualization
TechStambha PMP Certification Training
Software Configuration Management
Vaccine Code Set Management Services Pilot
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
InLoox 9 Web App Product Presentation
Software Configuration Management
Quality Management Systems – Requirements
Tracking and Traceability for Pipes, Fittings, and Fusions
Engineering Processes
Optimizing Efficiency + Funding
Oracle Sales Cloud Sales campaign
IT INFRASTRUCTURES Business-Driven Technologies
General Services Department
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
ProjectWise Work Management Integration
Project Information Management Jiwei Ma
Chapter 11: Software Configuration Management
Design Oversight Working Group (DOWG) Status Update
Technical Capabilities
Final Design Authorization
Requirements Document
Summary Data Modeling SDLC What is Data Modeling
CAD DESK PRIMAVERA PRESENTATION.
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Executive Project Kickoff
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Concur Travel and Expense Associate Dean and Department Head Meeting
Presentation transcript:

SDP Software Presented by Bill Clover and Brad Diggans Bill Clover Exelon Corporation William.Clover@exeloncorp.com Rolls-Royce Nuclear Engineering Services Brad.Diggans@Rolls-Royce.com

SDP Overview To Deliver the Nuclear Promise, Efficiency Bulletin: 17-06, “Implement Standard Design Change Process” was created. SDP implementation July 2017 Software pilot targeted implementation September 2017 Utility selected software implementation July 2018 Standard Design Process (SDP) IP-ENG-001 delivers a standard and graded approach to the design change process Design Oversight Working Group (DOWG) is responsible for maintaining the process

Software Expectations Promote/implement design sharing mechanism. Cloud based software platform accessibility Engineering Change (EC) abstract listing by utility/site to enable search and promote communication Common format Enable re-use with limited editing Reduce vendor costs in common design change processing Automate/streamline SDP Process Forms Facilitate, automate and streamline the SDP Promote cafeteria data display to reduce unneeded content Flexible solution – Tailor to existing software Enable stitch-in use of SDP base components into existing utility software in use if desired Allow full use and/or replacement if no or poor solution exists Automated final records capture Rollup of EC content to single PDF format Output Key Performance Indicators to measure SDP effectiveness

Software Overview Scope included in Software mirrors SDP scope Automate lifecycle process for the following SDP outputs: Common Design Change Design Change Design Equivalent Change Commercial Change Field Change Request (FCR) Advance Work Authorization (AWA) Comment/Impact Review forms Excluded Scope Document Only Changes Extent of use varies by utility given the existing design change software in use Fully automate the process from cradle to grave. Stand alone software for utilities that choose to replace entire design change software Provide defined portion of EC with remainder captured in existing utility system

Key Features SSO (Single Sign On) for users Seamless to users is the goal Promote use of URL that automatically opens the SDP EC from the SDP software Provides EC cloning capabilities Facilitates industry sharing Automatically creates reviews based upon results of the Design Attribute Review (DAR) Allows Stakeholders (other departments) to provide direct input to EC Sections Interfaces with existing Utility software to feed source data to SDP: EC metadata (Number, Rev, Title, key fields) Components Work Orders Controlled/Uncontrolled Documents (optional)

Key Features (Continued) Complete package generation, including Attachments Attach external forms and documents as needed Capability to mark attachments for utility sharing Electronic Signatures for reviewers of software forms and Attachments Digital transfer of SDP output back to utility Utility can determine end point and further consumption May be continuation of approval in utility base software May be final record ported to utility records system Configuration controls Enables use of existing software Affected Document List (ADL) and Affected Equipment List (AEL) features Enables Affected Document closure tracking Integrated status tracking of EC (i.e. Prepare, Approved, Implemented, Closed)

Utility Software Considerations Cloud Software – New Territory for many Limitations at each company on exposure and extent of exposure Research this FIRST before finalizing scope and budget Interface Design Utility specific based on software currently in use One way or two way interface will dictate complexity and COST EC Package Approval Process What are you approving? Design Package, ADL, AEL, Markups? How – In SDP or in Base software Long term configuration controls Determine use of existing systems for configuration control Consider number of software systems that must be used (e.g. Document Pending Change and Document EC incorporation management)

SDP Software Overview

Engineering Change Matrix

Design Attribute Review (DAR)

Design Attribute Review (DAR)

Design Attribute Review (DAR)

SDP Meetings Completion of DAR initiates Department Impact Reviews and Meetings Responsible Engineer / Responsible Supervisor will determine required meetings/reviews based upon the complexity and risk of the EC Kickoff Meeting Conceptual Impact Review Detailed Impact Review Final Impact Review Plant Review Board Coordinated by Meeting Manager Reviews completed in Engineering Change Reviews

Meeting Manager

Meeting Manager

Engineering Change Reviews Engineering Change Reviews allow for the performance of the following types as needed: Department Impact Reviews Conceptual Impact Review Detailed Impact Review Final Impact Review Interdisciplinary and Interdepartmental Reviews Design Verification / Engineering Review Owner Acceptance Review Approver Review (Vendor and/or Utility) Plant Review Board Plant Manager or Site VP Approval Automates Review workflow The Responsible Engineer / Responsible Supervisor can notify Reviewers/Approvers within the software

Conceptual Impact Review Workflow In Meeting Manager, notify Conceptual Impact Reviewers Manage Departments auto-populates from DAR

Conceptual Impact Review Workflow

Conceptual Impact Review Workflow

Department Impact Reviews Based upon the results of the Design Attribute Review Departments are notified by RE or Meeting Manager Custom Stakeholders can be created Stakeholders can: View Meeting Agenda/Meeting Package Provide Feedback/Comments Identify Affected Documents Provide EC Development Input Input is compiled per EC Section for the RE Include Attachments Sign Final Impact Review SDP Comment/Impact Review form

Interface Overview Required Interfaces User Sign-In Component Implementing Work Order(s) EC Transmittal to Records Optional Interfaces Document Lists and Files Existing Design Process Initiating Documents Action Tracking Database Long Term Asset Management Learning Management System Request for Engineering Assistance

User Sign-In User information and data is required for authentication into the CMISDP software User data will be populated using a single sign-on cloud management system. E.g. Microsoft Azure For contractors that do not have a utility LAN ID, they will have the option to create an account, but they will require an on-site representative to activate them within the software to properly authenticate those accounts

Components and Work Orders Components, Equipment, or Functional Locations will be integrated into the application. Component data will be provided in real time or close to real time format from utility databases Work Orders (WO) or Work Order Tracking numbers will be integrated into the application Components associated to work orders would be provided through cross reference relationships provided by the utility through the data interface. Work order data will be provided in real time or close to real time format from utility databases

Synchronized Tables 1 Rolls-Royce Utility Live Searching 2 (*Requires Utilities to Track Changes) 2 COMP 3 WS Internet WS 1 COMP MEL 4 Trigger Single Comp Group Comp Live Searching 2 (Potential Performance Issues) 1 Criteria 2 Criteria 3 Search WS Internet WS EMS MEL Results 6 Results 5 Results 4 ACK 7

EC Submittal Completed Engineering Changes within the application will be generated as a single PDF file This file along with the associated metadata will be sent from software to the utility Can be provided to either a SFTP location or through a web service API

EC Submittal

Document Lists and Files Document lists will be populated from multiple sources, including but not limited to: Affected Documents List (ADL) Equipment to Document relationship Controlled Document listings (varies by utility) Asset Suite Bentley eB Documentum PDMS Calculation databases Maximo, etc.

Document Lists and Files

Existing Design Process For utilities that currently have software solutions outside of the standard design process, those software solutions may be integrated with the new application Existing design modification data will be provided in real time or close to real time format from utility databases EC Number/Revision Status Safety Class Title