Annual Summary Details

Slides:



Advertisements
Similar presentations
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Advertisements

ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
Welcome to Student News 1:00 – 1:50 (call in 12:45) Please MUTE your microphones! Make sure your K20 contact registers your district for the next month’s.
Earth Disturbance Programs  Chapter 102 –Erosion Control & NPDES Permits  Chapter 105-General Permits  Dirt & Gravel Roads Program.
1 Low Volume Road Traffic Counts Toggle Fullscreen mode with this button above For audio, call conference line: For.
1 Quality Assurance Boards Toggle Fullscreen mode with this button above Audio also available via phone: For assistance,
CSU Kuali Days Welcome to CSU Kuali Days! Overview Session for: Account Create & Maintenance April-May, 2009.
The Greener Side of FDOE: What We’re Doing For You! 62 nd Annual FAPT Summer Conference Naples Beach Hotel and Golf Club, Naples, FL. July 5-9, 2009 Presented.
Welcome to the Learning Community 2015 Roll out webinar Hosted by the Family Institute for Education, Practice & Research The webinar will begin shortly.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
1 If you are reading this, then you are successfully seeing the webinar video. Audio will be through the conference call phone line.
E-Rate Training for TASBO Members October 8, 2008 Presented by Susan Sullivan Director of Technology/Media.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
1 Toggle Fullscreen mode with this button above If you are reading this, then you are successfully seeing the webinar video. Use.
*6=Mute *7=Unmute David P. Weikart Center for Youth Program Quality · OSPI Box Set Ordering Please dial-in: Phone Number: Access Code:
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
1 Audio also available via phone: For assistance, call: If you are reading this, then you are successfully.
Thank You For Joining You have been muted when you joined the call. This webinar will be recorded and the PowerPoint deck is available on request. Please.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
Replenishment and Direct Deposit 4/18/2017 Starts at 9am
California Career Technical Education Incentive Grant Program (CTEIG)
CD Education and Outreach
Delete this slide when finished
Annual Summary Details
July 20, 2017 Carmen Connect Webinar
DSA Administrative Webinar 5/19/16 Starts at 9am
ESSA and the Assessment of Students with Disabilities
Admin Manual Changes 4/13/2017 Starts at 9am
Welcome to the Nevada Test Administration Training and Q&A Session
December 21, 2017 Carmen Connect Webinar
Prep Webinar for KC, DC, & Dallas Roundtables
You should here audio now via either phone or computer.
We will start in 5 minutes.
DGLVR Conservation District
Workshop and Training Overview
6/18/2018 Starts at 9am DGLVR Webinar Quarterly Report
Road-Stream Interface:
Senior Service America, Inc. (SSAI) Webinar “Wish List”
1/23/2018 Starts at 10am DGLVR Webinar
Rotary Foundation District 6880 District Grants
SummingUp Live Ross Grange – Product Manager
Annual Summary Report Refresher 12/12/17 Starts at 10 am
Fulfillment Channel Services
Annual Summary Report Refresher 12/6/16 Starts at 2pm
Operating Budget Overview
6/18/2018 Starts at 9am DGLVR Webinar Payments Overview
Worksite Assessment Overview 1/31/2017 Starts at 9am
Proposed 2018 Budget Truth In Taxation Hearing December 5, 2017
CDGRS Quarterly Report
Annual Summary Report And GIS Q&A 1/7/2016 w Will start at 2 pm.
2/5/2019 Starts at 9am DGLVR Webinar Prevailing Wage
Dirt, Gravel, and Low-Volume Roads
Davidson County FY County Manager’s Proposed Budget
Charter System Principals’ Budget Sharing Guidance
3/7/2019 Starts at 9am DGLVR Webinar GIS Analysis for CDs
CDGRS Annual Summary Report
Session II – data analysis in Excel
Dirt and Gravel Road/Low Volume Road Program
CD Spending and 5-year agreement update
You should here audio now via either phone or computer.
Reporting, and Spending
Stream Crossing Bootcamp
7/1/19 Starts at 9am GIS Changes Update DGLVR Webinar
Stream Crossing Replacement Policy
Reports Welcome to the Finance video on reporting.
2019 Project Sharing Session Summaries
Dirt and Gravel Road/Low Volume Road Program
GIS Updates: Admin & Edu Tracker, Project Completion Date
Presentation transcript:

Annual Summary Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org The Big Picture: Annual Summary Details Toggle Fullscreen mode with this button above 2/14/17 Starts at 9am 2016 Completed Sites Dirt and Gravel (347) Paved LVR (123) Use Chat box to ask Questions http://metrocount.com If you are reading this, then you are successfully seeing the webinar video. In addition to audio on the webinar, we have opened a phone conference line to allow attendees to listen and ask questions directly: 866-823-7699. Please use either the webinar audio or conference line, but not both (will produce feedback). Audio also available via phone: 866-823-7699 For assistance, call: 814-865-5355

Participant phone lines will be muted until after initial presentation PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Toggle Fullscreen mode with this button above Use Chat box to ask Questions Participant phone lines will be muted until after initial presentation http://metrocount.com Audio also available via phone: 866-823-7699 For assistance, call: 814-865-5355

Annual Summary Report Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Purpose: Pause a minute, step back, and look at the big picture of what is being done by the Program. A lot of figures and stats coming up fast: Webinar recording and ppt slides available at www.dirtandgravelroads.org Printed Annual Summary Report available soon.

ESM Trainings Project Spending Project Deliverables Annual Summary Report Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ESM Trainings Project Spending Project Deliverables Audio also available via phone: 866-823-7699 For assistance, call: 814-865-5355

Large bump in attendance in 2014 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details ESM Trainings 1997-2011 annual average ESM Attendees per year Large bump in attendance in 2014 Settling out at a “new normal” of ~625?

Registration currently open at www.dirtandgravelroads.org PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details ESM Trainings ESM Trainings 12 ESMs scheduled for 2017 Registration currently open at www.dirtandgravelroads.org ESM Locations

ESM Revamp for 2017 Major Section Overhauls PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details ESM Trainings ESM Revamp for 2017 Major Section Overhauls Low Volume Roads Base Streams & Stream Crossings Surface Maintenance New “project spotlight” walkthroughs Many new images and projects

ESM Trainings Project Spending Project Deliverables Annual Summary Report Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ESM Trainings Project Spending Project Deliverables Audio also available via phone: 866-823-7699 For assistance, call: 814-865-5355

GIS All Annual Reports done by Jan 31st PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details GIS GIS All Annual Reports done by Jan 31st GIS Training 3/29 in State College Currently in System: $100 million spent/committed $77 Million in completed projects (DnG & LVR combined) $24 Million in contracted projects (DnG & LVR combined) Districts have received more Program funding in the past 3 years, than in the first 17 years of the Program. Audio also available via phone: 866-823-7699 For assistance, call: 814-865-5355

Big Picture: FY 2017-18 Allocations PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Spending Big Picture: FY 2017-18 Allocations 2-year spending requirements: currently only 3-4 counties at risk of not being eligible for FY 2017-18 allocations. FY 17-18 allocation Timeline: May: SCC Approval June: PA Bulletin Publishing July-Sept: CDs receive advances (pending State Budget approval)

New Funding and LVR show up in 2015 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Spending New Funding and LVR show up in 2015 1997-2011 annual average Completed 1997 through 2016 3,637 DnG Contracts 195 LVR Contracts

2015 Completed Sites Dirt and Gravel Paved LVR PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Completed Sites Dirt and Gravel Paved LVR 2015

2016 Completed Sites Dirt and Gravel Paved LVR 2015 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Completed Sites Dirt and Gravel Paved LVR 2016

2015 and 2016 Completed Sites Dirt and Gravel Paved LVR PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org 2016 Completed Sites Dirt and Gravel Paved LVR 2015 and 2016 Nearly 800 contracts completed If you are reading this, then you are successfully seeing the webinar video. In addition to audio on the webinar, we have opened a phone conference line to allow attendees to listen and ask questions directly: 866-823-7699. Please use either the webinar audio or conference line, but not both (will produce feedback).

ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Spending

Should stabilize at ~15-16M DnG, 6-7M LVR PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Spending Should stabilize at ~15-16M DnG, 6-7M LVR Project Spending 1997 through 2016 $72 million DnG $5 million LVR

As expected, larger, more complex projects ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Spending As expected, larger, more complex projects LVR and DnG contract sizes increasing rapidly

As expected, larger, more complex projects. ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Spending As expected, larger, more complex projects. LVR projects cost more per length than DnG.

Currently Contracted (1/31/2017) PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Spending Currently Contracted (1/31/2017) Dirt and Gravel 348 Contracts $17.9 million committed was 280 contracts and $13 million this time last year Low Volume 152 Contracts $5.8 million committed was 79 contracts and $2 million this time last year

9.5% of CD $ spent on Admin and Edu in 2016 (limit 20%) PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Spending Education 9.5% of CD $ spent on Admin and Edu in 2016 (limit 20%) Better utilization of education spending needed (2.7%)?

In-kind Total contributions increasing Percentage match decreasing PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Spending In-kind Total contributions increasing Percentage match decreasing 2016 total averaged $0.36 in-kind for each Program Dollar.

Dirt and Gravel Project Owners Low Volume Project Owners ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Spending Ownership of completed projects, 2015-2016 Townships still dominant grant recipient Boroughs and Cities increasing in LVR projects Dirt and Gravel Project Owners 2015-2016 Low Volume Project Owners 2015-2016

Big Picture: 2016 Completed Sites: Admin / Edu: ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Spending Big Picture: 2016 Completed Sites: 347 DnG contracts complete in 2016, $13.1 million spent 123 LVR contracts complete in 2016, $3.7 million spent Admin / Edu: $1.9 million in DnG Admin and Edu spending $600,000 in LVR Admin and Edu spending Contracted Sites: 1/31/17 348 current DnG contacts for $17.9 million 152 current LVR contracts for $5.8 million Overall: DnG projects and spending “ramping up” well LVR projects and spending increasing, but lagging DnG

ESM Trainings Project Spending Project Deliverables Annual Summary Report Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ESM Trainings Project Spending Project Deliverables Audio also available via phone: 866-823-7699 For assistance, call: 814-865-5355

Project Deliverables: PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Deliverables Project Deliverables: Purpose: To provide a “quick summary” of some of the major deliverables reported by CDs More details will be included in written Annual Report.

Road Fill Added: 206,000 tons in 2015 293,000 tons in 2016 =13,000+ ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Road Fill Added: 206,000 tons in 2015 293,000 tons in 2016 @ ~$10/ton = ~$3 million =13,000+ Triaxle loads

More fill purchased than DSA in 2015 and 2016 ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Road Fill Added: 206,000 tons in 2015 293,000 tons in 2016 Used in: (2015-2016) 54% of DnG contracts 27% of LVR contracts More fill purchased than DSA in 2015 and 2016 @ ~$10/ton = ~$3 million =13,000+ Triaxle loads

Driving Surface Aggregate: 143,000 tons in 2015 227,000 tons in 2016 ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Driving Surface Aggregate: 143,000 tons in 2015 227,000 tons in 2016 @ ~$30/ton = ~$6.8 million

Driving Surface Aggregate: 143,000 tons in 2015 227,000 tons in 2016 ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Driving Surface Aggregate: 143,000 tons in 2015 227,000 tons in 2016 Used in: (2015-2016) 45% of DnG contracts 5% of LVR contracts (5,000 tons total) @ ~$30/ton = ~$6.8 million

Stream Crossings (DnG $ LVR): 55 replaced in 2015 80 replaced in 2016 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Deliverables Stream Crossings (DnG $ LVR): 55 replaced in 2015 80 replaced in 2016

Stream Crossings (DnG $ LVR): 55 replaced in 2015 80 replaced in 2016 ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Stream Crossings (DnG $ LVR): 55 replaced in 2015 80 replaced in 2016 # of projects using structures: (2015-2016) 45 Round pipes 31 Squash pipes 14 Plate Arch spans 11 box culverts 5 bottomless arch 2 GRS-IBS bridges 2 other bridges (45 individual projects reported round pipe used, not necessarily 45 round pipes installed) Too many round pipes?????

Drainage Crosspipes: Pipes Replaced: 352 in 2015 624 replaced in 2016 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Deliverables Drainage Crosspipes: Pipes Replaced: 352 in 2015 624 replaced in 2016 738 on DnG, 238 on LVR (2015-16)

866 @ ~30` each = ~5 miles of new pipe in 2016! ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Drainage Crosspipes: Pipes Replaced: 352 in 2015 624 replaced in 2016 738 on DnG, 238 on LVR (2015-16) Pipes Added: 511 in 2015 866 new pipes in 2016 1182 on DnG, 195 on LVR 866 @ ~30` each = ~5 miles of new pipe in 2016!

13 miles in 2015  19 miles installed in 2016 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Deliverables Underdrains: 13 miles in 2015  19 miles installed in 2016

13 miles in 2015  19 miles installed in 2016 PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org ASR Details Deliverables Underdrains: 13 miles in 2015  19 miles installed in 2016 22 miles on DnG, 10 miles on LVR (2015-16) Used in: (2015-2016) 26% of DnG contracts 31% of LVR contracts

Note some of this was funded as in-kind ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables Paving (LVR Only): 4.5 miles “sealed” in 2015  7.6 miles in 2016 Paving reported in: 28% of 2015 contracts, 37% of 2016 contracts Assuming 18’ road width Note some of this was funded as in-kind

2015 More details in 2016 annual report, available soon ASR Details PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org Deliverables More details in 2016 annual report, available soon Let us know if you have any questions or suggestions for analysis of spending or deliverables. 2015

You can generate excel table for your county and do similar summaries: PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org You can generate excel table for your county and do similar summaries: Remind them of how to get stats for their county from GIS

DGLVR Project Sharing Sessions: PSU Center for Dirt and Gravel Road Studies: www.dirtandgravelroads.org  Webinars: February 14th      2016 Annual Summary Report Review March 17th          Project Sharing Session Highlights March 21st           Overview of Admin Manual Changes April 18th             CD Replenishments and Direct Deposit NEW DATE   DGLVR Project Sharing Sessions: Register: http://www.dirtandgravel.psu.edu/education-and-training/conservation-district-regional-sharing-sessions Schedule: February 21st      Greensburg, Ramada February 22nd      Clarion, Park Inn February 28th      Lancaster, Doubletree Hilton March 1st             Wilkes-Barre, Woodlands Inn March 7th             State College, CDGRS office Admin/GIS/Field Day New-Hire Training: Register: http://www.dirtandgravel.psu.edu/education-and-training/conservation-district-new-hire-training Schedule: March 28, 29, 30 in State College Bankfull / Stream Crossing Trainings: Registration available soon April 26th             Cumberland County May 10th              Elk County May 11th              Indiana County June 6th                Pike County June 8th                Centre County June 27-28th        NAACC Culvert Assessment Training (St College Area):  This is a methodology for assessing and ranking road/stream crossings for aquatic connectivity, used throughout the Northeastern US.  More details to come.  Web Link: https://streamcontinuity.org/ 2/21 canceled in Greensburg may be canceled unless more people register