YETS & LS2 Works EN-El on LHC / Power distribution

Slides:



Advertisements
Similar presentations
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Advertisements

Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
112/06/2012. Summary  Network infrastructure consolidation & upgrade 66 kV et 18 kV  UPS SILCON replacement project  Projects and maintenance work.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Preliminary Studies of the Electric Power Distribution for CLIC
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
LHC-YETS Coordination meeting #9 24 th November, 2015.
ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Electrial Safety LS2 days November 2016 AP
Magnet activities in SPS during EYETS
V4.
EN-CV activities for LHC during LS2
YETS & LS2 Works EN-EL / Power distribution
Session 1: Major Events in 2006
ABT-EC EYETS Activities 2nd reports
Situation of the Static Var Compensators at CERN.
SUB-STATIONS.
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
EYETS Works EN-EL [ FC excluded ]
Equipment simplified model SMR UR safety
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Injector De-cabling Project
Budget specification EHN1 Extension: Infrastructure (WG2)
YETS & LS2 Reminder G. Girardot 20 juin 2017.
EN 4946 – Refurbishment of Electrical Substations
the high-voltage network of CERN ToMORROW
LV Safe Powering from UPS to Clients
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
the CERN Electrical network protection system
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
F Duval, on behalf of EN/EL
Business opportunities related to CERN electrical network
Power cut 18kV cable for EMD404/E9 is heating
Electrical Distribution System Basics
F Duval, on behalf of EN/EL
Experimental Areas – LS2 planning
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

YETS 2017-2018 & LS2 Works EN-El on LHC / Power distribution On behalf on EN-EL

EN-EL IMPACTS for the YETS 2017-2018 & LS2 Summary The whole site LHC Maintenance Projects and maintenance works on substation 400 kV & 66 kV

EN-EL IMPACTS for the YETS 2017-2018 & LS2 The whole CERN Projects New main substation for secured network (ME91) (YETS + before LS2) Underground access prohibited at LHC1, BA6 & BA7 during transfert of loads Connection of new 400 kV substation BE2 to main 66kV substation (before LS2) Renovation of the 400 kV protection and control system (BE) (LS2) Consolidation 400 kV et 66kV substation (LS2) Refurbishment ME9 substation (LS2) Lots of power cut on SG Meyrin Replacement of the AutoTransfer automatism (PLC) Maintenance Maintenance UPS, 48V, transformers, HV & LV switchboard Tests Annual test for secured network 10’ power cut of « General Services » & « Secured » networks at 6:00 am in a working day (YETS + LS2) Prohibited access in underground Auto-transfer test (YETS + LS2) Prohibited access in underground + limited power PS – Booster impacted only a week-end on the Meyrin site Meyrin - LHC1 - LHC18 - BA6 - BA7 Secured network not available only Saturday in working hours ! All other sites (SPS – LHC – 513 – MEY without PS – Prevessin – ZN…) repowered without power cut on degraded configuration during the week-end BE2 YETS 2017-2018 – Works EN-EL / Power distribution On behalf on EN-EL

EN-EL IMPACTS for the YETS 2017-2018 & LS2 LHC Projects Refurbishment LHC18 substation (UPS & 48V) (YETS) 2 days of power cut during AUG LHC DIESEL consolidation (LHC2, LHC3, LHC3Z, LHC6 & LHC8) (TS + YETS + LS2 ) Safety network unavailable 3 weeks with many cuts Refurbishment LHC18 substation (18 kV & 3.3 kV) (LS2) 2 months of power cuts (April - May 2019) HL - LHC (LHC1, LHC4 et LHC5) (end of LS2) HL-LHC works Deviation cables for creation UPR (during YETS) Works on 3.3 kV in LHC4 (during LS2) Works for connection of new HL-LHC galleries (end of LS2) Maintenance Power transformers 66kV maintenance works (LS2) réseau machine en puissance réduite Maintenance UPS, 48V, transformers, HV & LV switchboard Tests Annual test for secured network 10’ power cut of « General Services » & « Safety » networks at 6:00 am in a working day (YETS + LS2) Prohibited access in underground Auto-transfer test (YETS + LS2) Prohibited access in underground + limited power AUG 9 days, 1 day by site on working days – Arcs affected (YETS + LS2) Prohibited access in underground Test redundancy UPS (end of LS2) YETS 2017-2018 – Works EN-EL / Power distribution On behalf on EN-EL

EN-EL IMPACTS for the EYETS 2016-2017 Maintenance works on 18 kV, 3.3 kV and LV networks 1/3 of the equipment 18 kV et 3.3kV : 400 cubicles General services LV switchgears Safety network LV switchgears Planning - requirements Slots of 5 to 6 days for each LHC points (including the AUG tests on the last day) and limited access on site (as done during LS1) No underground access for 2 to 3 days (secured network not available) No handling operations for 5 days (distribution off  cranes off) No 18 KV maintenance during 400/66 kV maintenance operations No secured network maintenance while AUTOTRANSFERT is off Necessary coordination with CRG & CV YETS 2017-2018 – Works EN-EL / Power distribution On behalf on EN-EL

EN-EL IMPACTS for the YETS 2017-2018 & LS2 Projects and maintenance work on substation 400 kV & 66 kV Projects Replacement bushings on the 3 transformers 400kV/18kV (LS2) Replacement 18 CTs 400kV (LS2) + 3 CTs 66kV (before LS2) Installation new incomer 400kV EHD6/BE (LS2) Installation of fire walls (LS2) Consolidation 400 kV protection and control system + auxiliaries (LS2) Fire protection system consolidation on transformers and 400 kV substation (LS2) Maintenance Power transformers 400 kV and 66kV maintenance works Maintenance of the 400kV and 66kV circuit breakers works Tests on RTE interface protections and various signals YETS 2017-2018 – Works EN-EL / Power distribution On behalf on EN-EL

Thank you for your attention !