SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/2017 + results from the visits and new requirements.

Slides:



Advertisements
Similar presentations
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Advertisements

Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
1 Upper Basin Snowpack as of 3/26/2014
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
CMS CB, 22 June CMS Centre Status Lucas Taylor CMS Centre Project Manager CMS Collaboration Board CMS Week, June CMS Centre Status 2.New offices.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Power of Choice (PoC) Program Overview
The Next Generation of a Gamma Irradiation Facility GIF++
CMS Centre Project - Green Light Meeting
Demineralised water cooling system
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
SR1 extension follow up 11-Sep-17 Marco Ciapetti.
SR1 extension follow up 08-May-17 Marco Ciapetti.
Cabling for LHCb Upgrade
SR1 cleanroom extension
VENTILATION OF AD TARGET Kick off meeting
EHN1 Extension planning
SR1 extension follow up 14-Aug-17 Marco Ciapetti.
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
SR1 extension follow up 03-Jul-17 Marco Ciapetti.
CMS Area Working Group Meeting
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
SR1 extension follow up 09-Oct-17 Marco Ciapetti.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Japan proposal on schedule
RWTCS Steering Commitee
PROGRAM CONSULTATIVE FORUM Meeting pack
SR1 cleanroom extension
RWTCS Steering Commitee
LHCb & EYETS
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Extension SR1 WP3 Electrical installations
SR1 extension follow up 18-Dec-17 Marco Ciapetti.
Status with crucial LSS5 kicker transmission line cables
East Hall under construction
GIS Portal Racks Project
Japan proposal on schedule

2016 FIT FOR PERFORMANCE Weight Control Program
ctclink Steering Committee

FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Report on HIE-ISOLDE Status


Power of Choice (PoC) Program Overview
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Capacity Methodologies Review 2019

LS3 Study & Readiness Meetings
Aziz AMAMOU EACM – 21th May 2019
East Hall under construction
East Area Renovation Supply of control rooms b.157
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/2017 + results from the visits and new requirements 13-Mar-17 Marco Ciapetti

Current status – taken decisions A Bi-weekly meeting about SR1 status will be held from today every two Mondays at 14:30 in this room. People invited to this meeting: TC:         Marco Ciapetti and/or Ludovico Pontecorvo, Siegfried Wenig and/or Laetitia Bardo (always) SMB:     Pierre Cardon  (always) EN-CV:  Alexandre Joel Broche (always) EN-EL:   Thierry Charvet and/or Thierry Octave and/or Bruno Saint Sulpice (always) HSE:       Valentin Algoet  (always) BE-ICS:  Denis Raffourt  (only when needed) IT-CS:    Leszek Borakiewicz (only when needed) Users of the clean room will be invited when needed but are always welcome to join

Current status – taken decisions Last meeting on 27/02/2017 (Marco, Pierre, Alexandre, Ludovico) Civil Engineering works starting date has been anticipated because no MS nor Tender are needed: June 2017 instead of July 2017. Target ending date for SMB works is end of December 2017 (tbc). At the latest January 2018 for SMB works and July 2018 for the global. SMB will take care only of the external building (SR1) extension and flooring. TC will take care of the clean room extension and the internal partition walls. SMB will start with the external building extension before removing the present wall. Once the building is extended, SMB will install a temporary partition wall at around 1m from the present wall (all along).

Current status – taken decisions Once the temporary partition wall is installed, CV will switch off the air conditioning. The ventilation will be off for at least 6 months. CV needs at least 2 months to get the new Air Handling Unit (for the delivery to CERN, without taking into account the installation). EL and IT must remove all cables between the current SR1 wall and clean room wall before dismounting the walls. Due to the bad results of the air leakage test, the overpressure is reduced from 30 Pa to 15 Pa  no overpressure between clean room and radiation lab A new Air Handling Unit might be needed (depending on the price)

Current status – taken decisions The clean room will be ISO 8 according to ISO 14644-1 All cable trays shall be covered  clean room extension firm shall schedule other interventions after the installation

Current status The construction permit should arrive soon. Status? Waiting for cost estimation for new Air Handling Unit from EN-CV. Status? Two firms (ER2i and STIC) have been contacted for an offer for sealing the current clean room: Visit with ER2i was done on 08/03/2017. Waiting for the offer Visit with STIC is planned for 14/08/2017. Work on Clean Room Technical Description for MS is on going. It should be completed this week. Technical Specification will be prepared right after

Current status The Users have been contacted on 02/03/2017. Following are the answers from Didier: Total expected power consumption (Pixel/Strip integration, testing, standard activities): Unknown (waiting for Ingrid’s and Paolo’s reply) Amount of lux needed: same as it is now Number and position and type of sockets and switches: power socket distribution at every pillars and one at about every 3-4 meter against the wall 4-6 sockets (16 A each) per distribution terminal with a local differential switch for the group of 6 3 phase socket with 380V with 32 A max power at each power distribution terminal Number and position of Ethernet inputs / wireless: Number of Wi-Fi terminals: Unknown One Ethernet socket per each electrical terminal Path for cables (along pillars or cable trays etc.): Unknown (waiting for Ingrid’s and Paolo’s reply)

Current status Visit with EN-EL was done on 08/03/2017. A rough estimation of 100 kCHF was done for: Removal of the cables and equipment Grounding Replacement of the existing EBD6 / 1R board with a larger model Creation of 2 new starters (160A + 125A) on the EBD5 / 1R board for new HVAC installation and external chiller Cabling activities (HVAC power supplies, chiller, existing + new outlet boxes, lighting for the extension, safety lights for extension, AUG in extension) Supply of new equipment (outlet boxes, lighting, safety lighting, AUG, lighting controls) Luminosity will be 400 lux (to be verified after the test)

Requirements The ITK Pixel system needs to run a Pixel system test using FEI-4 chips which can use some existing infrastructure within SR1 (cables, power supplies, cooling plant (CO2)).  For this to work it is needed: The barrack/container where there is the plant needs to move to the back side of SR1 The system test schedule should be made compatible with the power cuts (if possible) If the interruptions are short and scheduled, this is likely not a problem, If they are weeks/months, this is incompatible with locating the system test in SR1 Lack of cooling (HVAC) for extended durations is OK A preliminary schedule for this activity is the following: Jun – Sep 2017: Setting up of system test stand (power needed even if few days of outage can be discussed, CO2 optional with movable smaller system) Oct – Nov 2017: Preparation of larger structure (power and C02 needed, days of outage can be discussed) Dec 2017 – Summer 2018 evaluation of larger structure (power and C02 needed)

Things to be decided The extension of the changing room might present problems concerning the present cable trays. The proposal is to extend it by ≈1m To be removed ≈1 m ≈1 m

Schedule preliminary DRAFT From TC (TBC): Jun 2017: SMB should start civil engineering works Ago 2017: EL should remove all cables close to 1m from the SR1 roof (if any) Sep 2017: EL-IT should remove the cables running on the wall to be dismounted (in between the wall and the building wall) Oct 2017: SMB should install the temporary partition wall (1m from existing wall) Nov 2017: CV will stop the ventilation for 6 months Sure? Why so early? Dec 2017: target for ending civil engineering works (end of the month) Jan 2018: TC should start installing the internal clean room extension and EN-CV should start working on the HVAC system Mar 2018: target for ending clean room extension installation walls and ceiling Apr 2018: EN-EL, IT-CS should start working Jul 2018: target for commissioning the SR1 clean room extension

Schedule preliminary DRAFT From SMB (TBC):

Priorities Get unknown information from ITK people Visit with IT-CS to be scheduled Global schedule of the entire work (all WPs) is not yet done. This is needed quickly! Technical description and specification for the clean room extension are urgent For the IPP update, all WPs shall prepare a short summary with technical info, costs, schedule, etc. …

Questions What kind of internal floor SMB will provide? (Concrete?) What kind of internal floor is required? (Antistatic resin flooring?) Exact dimensions of the doors to access the extension? Are the external doors provided from SMB? Can the door to R-C04-A be moved on the new portion of the wall?