LHC Status Tue Morning 22-Aug

Slides:



Advertisements
Similar presentations
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
LHC Status Sat Morning 9-June Bernhard Holzer, Joerg Wenninger Status Friday Morning: 09:00h end of fill “studies” rf coupler fine tuning ADT gain reduced.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC Status Fri Morning 3-June
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wednesday September 14th
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Saturday 30th June - Sunday: Rocky !
Week 32 Started with luminosity production…
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Saturday 12:00 Fill 1992 in stable beams.
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Bernhard Holzer, Joerg Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Wednesday 8th August & night
LHC Status Sun Morning 20-Mai
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Mon Access for switching temperature probe DFB L7.
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Saturday :42 stable beams fill 3541
Friday morning 08:00 Stable beams with 840b.
LHC Morning Meeting - G. Arduini
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Another Immortal Fill….
Wednesday morning / afternoon
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC Status Tue Morning 22-Aug Bernhard Holzer, Joerg Wenninger 29/06/2012 LHC 8:30 meeting

Tue Morning 08:24h beam dump: Access needed for LHCb water leak emittances at fill end ... access for ATLAS / CMS / RP ... in the shadow 11:20h LHC closed, restart 11:51h injection probe beam

Tue Morning 12:07h beam dump: SIS problem, “See glitches on SIS, on squeeze factors, currents and states of PCs in different sectors etc etc.” Also the squeeze factor interlock came back - it'd have dumped, had we had beam.Example of exceptions:12:43:26 - 2012-08-21 12:43:25,706 [JapcExecutor-thread-11] ERROR JapcDispatcherImpl +==> Exception occured for parameter id [RPHGA.RR13.RQ8.L1B1_DATA] name [RPHGA.RR13.RQ8.L1B1/SUB_51]asynchronous operation on RPHGA.RR13.RQ8.L1B1/SUB_51@ failedcern.japc.ParameterException: Lost-Updates: Server overloaded and not able to handle all new updates ==> it will loose updates.         at cern.japc.ext.cmwrda.DataTranslator.createParameterException(DataTranslator.java:275)      at cern.japc.ext.cmwrda.RDAReplyHandler.handleError(RDAReplyHandler.java:115)         at cern.cmw.rda.client.ReplyAdapter.handleException(ReplyAdapter.java:103)         at cern.cmw.rda.client.ServerConnection.dispatchLostUpdates(ServerConnection.jav a:2566)         at cern.cmw.rda.client.ServerConnection.handleReply(ServerConnection.java:2349)         at cern.cmw.corba.rda.ReplyHandlerPOA._invoke(ReplyHandlerPOA.java:45)         at org.jacorb.poa.RequestProcessor.invokeOperation(RequestProcessor.java:297)         at org.jacorb.poa.RequestProcessor.process(RequestProcessor.java:591)         at org.jacorb.poa.RequestProcessor.run(RequestProcessor.java:734)Caused by: cern.cmw.LostUpdates: Lost-Updates: Server overloaded and not able to handle all new updates ==> it will loose updates.         at cern.cmw.rda.client.ServerConnection.dispatchLostUpdates(ServerConnection.java:2562)        ... 5 more my translation: programs running in parasitically were blocking the operation servers some users caused delays and data packet losses. -> users identified, processes stopped, SIS reset by the experts ... and ok 29/06/2012 LHC 8:30 meeting

Tue Morning 14:14h injection physics beam ... CMS solenoid ramping down ... temperature problem nice clean injection 15:16h ramp, squeeze, adjust without (?) problems Emittances B2H = 1.86 B2V = 1.97 B1H = 1.94 B1V = 1.76 29/06/2012

Tue Late 15:35h OFSU crashed before launching the squeeze. Need to fetch optics and re-calculate it. 16:10h luminosity optimisation: again beams offset in ATLAS, initial lumi: 2*10^33 lifetime down to 0.5h, considerable intensity losses recovering after decent tuning of luminosity

Tue Late luminosity optimisation: not the easiest part this time cured by: head on in ATLAS, reducing chroma (trim of -3 H and -5 V), octupoles at -1.7, slight global orbit correction beam losses tunes lifetime bunch intensities

Tue Late 22:52h beam dump due to thunderstorm lost sector 12 ... et al first bilan: * lost sector 12, 23, 34, 45 ,67 and 81, lost RD34LR7 and RD1LR5 * trip of ALICE and LHCb dipole * lost 2 RF modules M2B1 and M2B2 * several collimators not going to parking

Tue Night 04:07h injection probes 04:28h injection physics 05:03h ramp, squeeze, adjust, lumi 4 % 4 %

Tue Night 04:07h Luminosity