Communication for Transit Technology: Arlington County Experience

Slides:



Advertisements
Similar presentations
Chapter 3: Planning a Network Upgrade
Advertisements

Overview What is the National ITS Architecture? User Services
WMATA Bus ITS Project Update Transit Signal Priority Briefing to the Traffic Signals and Operations Working Group April 21, 2005.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
A Better & Safer US Highway 90 along the Mississippi Gulf Coast By Mike Stokes Intelligent Transportation Systems Manager MDOT – Traffic Engineering.
Presented by: SAGE KAMIYA, P.E., PTOE
Lawrence-Douglas County Regional ITS Architecture Update.
Downtown Seattle Transit Tunnel (DSTT)
Gainesville Area Traffic Management System. Traffic Management System  In 1984, the original Traffic Signal Master Plan was developed for the Gainesville.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Center for Urban Transportation Research | University of South Florida Technology Session: 21 st Annual Transportation Disadvantaged Best Practices and.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 MAP Value Proposition.
Envisioned Role for NTI Concerning ITS Deployment in Egypt by Dr. Mahmoud EL-HADIDI Professor of Telecommunications at Cairo U & Consultant at NTI 3 rd.
Version 4.0. Objectives Describe how networks impact our daily lives. Describe the role of data networking in the human network. Identify the key components.
1. 1. Overview: Telecommunications Project  Planning and implementation (2007-today) 2. Discussion: Proposal to Improve Infrastructure  Upgrade horizontal.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Infrastructure Security Leveraging the ITS Experience Base Presented at ITS America Commercial Vehicle and Mobility Forum K.K Saxena, CCP Principal Kimley-Horn.
INTELLIGENT TRANSPORT SYSTEMS
Geneva, 7-9 March 2007 Brian Droessler Business Development, Continental Automotive Systems.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Chapter2 Networking Fundamentals
Adoption and Use of Electronic Medical Records (in Federally Qualified Health Centers) and Supporting an ASP Community Care Network of Virginia, Inc.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Camden County Travel Management Coordination Center Project Update Camden County WIB Board Meeting – March 26, 2008.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Data Enabled Railway July 2015 Railway Suppliers Summer Conference 2015 Steve Warner, EMEAR Head of Data & Analytics.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Colfax Corridor Connections (Denver) & 15/15L Transit Priority Study (RTD) RTD Board - Planning & Development Committee August 6, 2013.
Unified Communications Survey Summary Results
SPaT Challenge Overview and Execution
Transportation for special Education
Multi Agency Exchange May 16, 2017.
Computing Fundamentals Module Lesson 1 — Introducing Computers
Project Overview – Phase 1
Local Government Roundtable Session Arlington, Virginia
Managing the Delivery of Information Services
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Intelligent Transportation Systems
Design and realization of Payload Operation and Application system of China’s Space Station Wang HongFei 首页.
A New Era in Critical Communications
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
and Transportation Impacts
Draft Transportation Element September 6, 2017
focus areas – what we want to achieve…
CORPORATE PROFILE JUNE 2016
D Line Station Plan Overview
GPRS GPRS stands for General Packet Radio System. GPRS provides packet radio access for mobile Global System for Mobile Communications (GSM) and time-division.
D Line Station Plan Overview
D Line Station Plan Overview
Karen Bartleson, President, IEEE Standards Association
D Line Station Plan Overview
D Line Station Plan Overview
COMMUNICATION SOLUTIONS
Big Data and IoT FTG-07.
Maintaining order and safety in a city is no small task
Computing Fundamentals Module Lesson 1 — Introducing Computers
Basics of Telecommunications and Networks
Welcome to the New Smart City by TrafficCast…
Chicago to Council Bluffs-Omaha
VDOT Broadband Expansion
IoT and Supply Chain Risk Management
Presentation transcript:

Communication for Transit Technology: Arlington County Experience Presented by: Nick Mazzenga Kimley-Horn & Associates, Inc. What I am going to talk to you today about is the marrying of two projects in Arlington county Virginia: These two projects are: Connecting Arlington which is the County-wide fiber optic communication network Columbia Pike Super Stop Project which is the plan for enhanced amenity bus stops to be installed along the Columbia Pike corridor. The end result of the combination of these two projects is the project which I am involved with and that is the Arlington County Super Stop Communication Design project. I will touch on the lessons learned and benefits that came out of this in addition to some of the challenges and opportunities experienced when IT and ITS partners work together for a common goal.

Presentation Overview Project Background Systems Engineering Challenges & Opportunities Super Stops, part of the Pike Ride service, are larger, more easily accessible bus shelters that offer riders amenities such as seating, lighting, wind screens, enhanced weather protection and electronic schedule information. Arlington County’s Department of Environmental Services worked side-by-side with the community since 2004 to determine the design and locations for these bus stops. The stops were selected because of the corridors high ridership. These stops will support the existing Pike Ride bus service and are also designed to function as future streetcar stations along the corridor.

Project Background In the beginning... ConnectArlington 46 miles of fiber optics and conduit installed throughout the County Started with a ITS communication master plan to transit from copper based signal communications to fiber optics that evolved into a long-term investment to address future telecommunications needs and bandwidth requirements for the entire County. It will resulted in creation of a broadband fiber-optic network for education, public safety, transportation, and government use.  ConnectArlington will Reduce County expenses for commercial telecommunications services. Improve management of traffic and public transportation Enhance communications access for public safety response to emergencies Network will be managed by DTS (will discuss more on this later) End result: completely redundant enterprise network for public use

Project Background Columbia Pike Corridor Super Stops Columbia Pike is a vibrant, mixed-use community with a diverse population and access to a wide variety of employment, retail and commercial centers. As one of Arlington’s urban villages, Columbia Pike has a significant amount of pedestrian activity and features transit service provided by Metrobus and Arlington Transit (ART). Columbia Pike extends from Fairfax County through Arlington County and terminates at the Pentagon. Personal Vehicle: 33,000 vehicles per day  Transit: 15,000 daily transit riders (2010), in 2016 (between 18,000 and 24,000) for without and with streetcar alternatives Super Stops project will enhance the Pike Ride service. Super Stops are larger, more easily accessible bus shelters that offer riders amenities such as seating, lighting, wind screens, enhanced weather protection and electronic schedule information. Arlington County’s Department of Environmental Services worked side-by-side with the community since 2004 to determine the design and locations for these bus stops. These super stops will also feature heated platforms and seats. 24 planned super stops along corridor Six initial stops were selected for integration with ConnectArlington because of their high ridership. These stops will support the existing Pike Ride bus service and are also designed to function as future streetcar stations along the corridor.

Project Background County Transit Vision: “...to better accommodate pedestrian movements and bring out high-quality, frequent, and reliable transit service by enhancing the ability to move and promoting transit-oriented development in the corridor.” County Transit Vision: Provide network connectivity to super stops to facilitate integration of traveler information systems, CCTV cameras and future passenger amenities. Project purpose: A new streetcar system is being installed on Columbia Pike in Arlington. As part of that project, several “super stops” will be constructed that will include computers and display monitors that will provide traveler information. In addition, the County desires CCTV cameras at these locations to help manage its streetcar operations. For this project communications at six Super stop locations will be designed. In a separate effort, Arlington is constructing its next generation fiber optic network, dubbed ConnectArlington, that will connect all traffic signal cabinets and ITS components, in addition to county buildings and schools, in a single network that will be managed by the Department of Technology Services (DTS).

Super Stop Communication Design Project Project Integration Super Stop Communication Design Project Super Stop Project Connect Arlington This is where our project comes into play, the marrying of the ConnectArlington network and the Super Stops project is the super stop communication design project.

Evaluated network architecture for Super Stop integration Systems Engineering Evaluated network architecture for Super Stop integration Evaluated network architecture to determine how super stops would fit into the County-wide communication infrastructure. Eventually the County plans to integrate each super stop as an individual edge site on the ConnectArlington network. The design will leverage existing infrastructure and utilize expanded ruggedized Ethernet switches in nearby traffic cabinets to provide communications necessary for CCTV cameras. Future connectivity is dependent on coordinated efforts between DTS (County IT department) who is the manager of the ConnectArlington Network.

Project Deliverables We developed design plans that took into account the existing infrastructure and leveraged existing CCTV systems provided by the County’s traffic engineering department.

Supported Technologies Expanded CCTV monitoring Real time bus schedule information Off vehicle fare collection Sensys enabled bus detection Transit Signal Priority Off vehicle far collection is a future supported technology given the potential for upgrades to the transit system through a streetcar addition. The Sensys enabled bus detection is a separate system that is being designed currently on another corridor in Arlington. The ConnectArlington network will facilitate communications for this detection project which will utilize sensys detectors to toggle on or off passenger turn restriction signs when there is a vehicle bus conflict.

Challenges & Opportunities Redundant network architecture Ethernet connectivity available in traffic signal cabinets Standard spec CCTV equipment Climate controlled technology enclosures at super stops Network security concerns As this project moves forward and more technologies are introduced the ConnectArlington network will be there to facilitate communication. Leveraged existing Ethernet connectivity at traffic signal cabinets and existing traffic operations CCTV monitoring system which is a big opportunity. Off vehicle fare collection systems require increased network connectivity and high up times so the redundant network architecture is an excellent opportunity to be leveraged. The traveler information system consists of a standalone PC and monitor contained within a climate controlled technology enclosure at each super stop. It requires Internet connectivity to obtain information for display. Current Network Security Concerns require that the Internet connection for Passenger Information System be isolated from the ConnectArlington fiber network since the PC is managed by a third party and DTS cannot ensure security settings, patches, etc.

IT and ITS coordination Transition of ITS communications to IP/Ethernet networks ITS networks move from segregated to merged networks where IT professionals play larger role Integrated ITS and IT network Early intelligent transportation systems (ITS) were integrated exclusive of standing information technology (IT) departments. The closed, isolated nature of these systems enabled the ITS network to avoid existing IT security issues and policies. Typically, these systems were dominated by low bandwidth, serial communication technology in concert with analog signal transmission for closed circuit television cameras (CCTVs). With the emergence of Ethernet/Internet Protocol (IP) networks, cost efficient high quality digitized video, and a desire to share data with partner agencies, ITS networks transitioned from segregated networks to merged networks where IT professionals, ITS engineers, and transportation managers find themselves working hand in hand toward similar objectives.

IT and ITS coordination Transportation Managers Information Technology Professionals ITS Engineers All of these partners must work together and come to consensus on how systems shall be operated and how equipment shall be integrated, only with cooperation between all of these entities will successful deployments occur. What was experienced in Arlington was the transition from segregated IT and ITS networks into one universal network managed by the county not relying on individual internet connectivity to communicate to devices. The IT and Transportation departments have worked in concert together and will need to continue to coordinate their efforts.

IT and ITS coordination Benefits of IT & ITS Coordination Effective resource utilization within agency Shared use of staff resources and leveraging specialists Shared use of equipment procurement vehicles and service agreements Leverage grants and funding opportunities across an entire enterprise Access to high bandwidth networks The transition of ITS communications to IP/Ethernet based networks and the mainstreaming of ITS central hardware and software into the agency IT programs has brought its share of challenges. However, this convergence also affords ITS deployment operators and maintainers the opportunity to leverage the skills, expertise, and standardized maintenance and equipment replacement cycles typical of IT departments. Likewise, this convergence provides IT departments access to high bandwidth communications networks and shared mission software platforms. Additionally, ITS operators and maintainers often bring decades of physical infrastructure construction and maintenance experience. While developing common operating, security, and maintenance policies can be challenging, benefits of collaboration include: Effective resource utilization within agency (shared ConnectArlington network for communication to super stops) Shared use of staff resources and leveraging specialists (Transit department gets the benefit of using DTS engineers to facilitate communications to the super stops) Shared use of equipment procurement vehicles and service agreements (Transit was able to procure additional CCTV cameras and use current CCTV network architecture to provide video monitoring of super stops) Leverage grants and funding opportunities across an entire enterprise (Multiple departments within the County are able to pool money together to fill in the gaps of the ConnectArlington network) Access to high bandwidth networks (overall benefit with ConnectArlington network and the super stops that will be connected to them)

Questions & Comments Contact Information: Tom Scherer Arlington County Public Transit Technology Manager tscherer@arlingtonva.us Contact Information: Nick Mazzenga, EIT (703) 674-1315 Nick.Mazzenga@Kimley-Horn.com