Status of PQC Florence, Strasbourg, Vienna

Slides:



Advertisements
Similar presentations
Measurements of the Flat Band Voltage across the wafer PQC FIRENZE.
Advertisements

23 July 2012 Thomas Bergauer (HEPHY Vienna) Belle II SVD Construction Database 12 th B2GM Bad Aibling.
HPK L1 teststructures HPK L1 half moon teststructure corresponding to main chips 6,7 Results on  Diode C-V  Coupling capacitors  polysilicon arrays.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Database entry of irradiation data PROBLEMS New form of DB data One set of data may de-qualify whole batch of sensors  composite of composite action:
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
General Tracker meetingA. Furgeri 1 Irradiation results and Annealing scenarios for HPK IEKP – University of Karlsruhe Alexander Furgeri
Test Results Highlighted Material Batches tested 6WA –263(1) 230(1) 265(2) 272(1) 273(3) (3) 305(1) (6) (2) 6WB –278(1) 279(9) 282.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
Database entry of irradiation data PROBLEMS New form of DB data 1. One set of data may de-qualify whole batch of sensors  composite of composite action:
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
The trkNavigator plugin 22/10/ CERN - DataBase meeting Simone Paoletti INFN - Sez. Firenze.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CERN, 16/9/2003 S. Paoletti: trkNavigator 1 trkNavigator: A Java client for the Tracker DB 16/9/ CERN - mod. Prod meeting Simone Paoletti INFN -
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Studies on n and p-type MCz and FZ structures of the SMART Collaboration irradiated at fluences from 1.0 E+14 to 5.6E+15 p cm -2 RD50 Trento Workshop ITC-IRST.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
INFN and University of Florence Test Beam Meeting Tracker Week
Karlsruhe probe equipment and QA proposals/expertise
Axel König, HEPHY Vienna
Status Report on Bonding at Catania
INFN and University of Florence Test Beam Meeting Tracker Week
Study of radiation damage induced by 26MeV protons and reactor neutrons on heavily irradiated MCz, FZ and Epi silicon detectors N. Manna Dipartimento.
Study of radiation damage induced by 24/c GeV and 26MeV protons on heavily irradiated MCz and FZ silicon detectors N. Manna Dipartimento Interateneo di.
Status Brussels GANTRY
Anna Macchiolo, PQC Firenze
Executive summary from Bonding WG Meeting 21 Oct 2003
GLAST Large Area Telescope:
Results from module testing
IEKP - Universität Karlsruhe (TH)
US Module Production Quality
Module Production Status in Florence
News from CMS Process Quality Control
Module production in Italy
TEC Module Production Overview
The measurement set-up
Module Production in Brussels
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
Metal overhang: an important ingredient against “micro-discharge”
Module Testing in Florence Carlo Civinini INFN-Florence
Full list of devices of May09
TEC module quality overview
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
IEKP - Universität Karlsruhe (TH)
Status of Hamamatsu Silicon Sensors
Presentation transcript:

Status of PQC Florence, Strasbourg, Vienna Carlo Civinini INFN-Firenze Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Introduction Status of hw + sw Status of DataBase Batch qualifications STM HPK Open points rAlu VFB limit Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Status of DB The new version of PCQ acquisition program is able to write an XML file compatible with the last version of BigBrowser. Up to now we have inserted 20 measurements into the Tracker DataBase. Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Status of hw + hs HW is OK, some improvements can be done on the probe cards presently used (cleaning or better HV insulation) SW is OK, production version is working Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Logistic Florence: IB1, IB2, OB1, OB2 (no-longtime IV) from QTC Perugia and Pisa 5% of the wafers = 693 standard moons Strasbourg: W3, W5A, W5b, W6a, W6b from QTC Karlsruhe 271 standard moons Vienna: W1, W2, W4, W7A, W7b from QTC Vienna 235 standard moons Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Batch Qualification Measurements done since last CMS week: STM sets: PG3 PI23 PI25 PI31 PI38 PI26 PI32 KAS2 PI24 PI33 PI49 HPK sets: PG01 PG02 PI42 PI43 KAH1 VI01 VI02 Florence OB1 OB2 Vienna OB2 Strasbourg OB2 W6A Florence IB1 IB2 Vienna W4 W2 Strasbourg W3 Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 HPK IV-diel Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 HPK Cac Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 HPK Vfb Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 HPK Vdepl Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 HPK rAlu Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 STM IV-diel Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 STM Cac Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 STM Vfb Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 STM Vdepl Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 STM rAlu Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Batch evaluation HPK sets: PG01 PG02 PI42 PI43  Measurements OK, accepted beginning of July (rAlu is marginal) STM sets: PG3 PI23 PI25 PI31 PI38 PI26 PI32 KAS2 PI24 PI33 PI49 HPK sets: KAH1 VI01 VI02 Most of the measurements are OK, not yet officially accepted Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002

Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002 Open points rAlu measurements are ‘marginal’ both in HPK and STM. STM says that the metallized strip used to evaluate the aluminum resistivity is 10% narrower than the nominal (9mm instead of 10mm because of underetching). Once verified this leads to a decrease of 10% of rAlu. VFB limits are still to be fixed according to the irradiation results. Detector with VFB=10V seems to be OK after irradiation but we would like to see more data at higher VFB (for example 14V) before setting this limit. Carlo Civinini, Status of PQC, Sensor Meeting, 17th Jul 2002