MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018

Slides:



Advertisements
Similar presentations
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Advertisements

EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.

Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
PLC NANO MANAGING SAFETY FUNCTIONS acting on electrical power for MEY/NA Experiments/Barracks.
TS, Length of YETS EYETS LIU & CONS Project
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
School Ethics Commission Electronic reporting of Personal/Relative and Financial Disclosure Statements Board Secretary Review of the Online List of School.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
How to request access for users to be added or removed from distribution lists.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
SMB Service Status 113th ACCU Meeting
YETS & LS2 Works EN-EL / Power distribution
CC LLRF SM18 test plan and BA6 infrastructure
Status, Schedule and EVM for the test facility project
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
Identification of the unused cables
Supplier Self-Service Registration
P. Charrue on behalf of AB/CO/IN
LIU Wire Scanner Milestones June 2017
Naming convention and layout database for the East Area
Safety Documentation EHN1
EYETS LHC 2016/2017 Works EN/EL/CF
Injector De-cabling Project
TE-MPE LS1 review Vision from EN-EL(CF)
EC Activities Status for the LIU
Unifying for all accelerators and projects
East Area Renovation Project team #6 Launch safety agreement
YETS & LS2 Reminder G. Girardot 20 juin 2017.
prepared by R.A.Barlow 13/09/2016
De-cabling strategy during YETS
prepared by R.A.Barlow 30/056/2016
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
GIS Portal Racks Project
Business opportunities related to CERN electrical network
BLM planning 03/02/2014.
LIU-SPS review for BI (no BWS)
HL-LHC - WP15 modifications Coffrets Prise C4L8
ILO Industrial Opportunities Days, 6-7 June 2019
Open Points and More… Giulia / Michael / Sebastien / Maria.
Rack and Interconnect Design in E-plan
Work and Service Supervisor
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018 Antonio GONZALEZ (EN-EL-FC) in behalf of EN-EL group

Antonio GONZALEZ (Fibre Optics and Cabling section) Memorandum* Cabling activities (DC, signal and fibre) and electrical installation works to be scheduled during YETS 2017-2018 EN-EL requests that users to submit on 15/07/2017 at the latest: 1st version of the DIC/DIR/DIF/DFP Requests for electrical installation works 15/09/2017 at the latest: Final version of the DIC/DIR/DIF/DFP *MEMO sent to CERN users, EDMS Link: https://edms.cern.ch/document/1817523/1 18 JUL 2017 Antonio GONZALEZ (Fibre Optics and Cabling section)

Files ready for EL contractor Memorandum Timeline Today (18/07/2017) Preliminary studies Material Provision Preparation of Technical Files 21-06-17 15-07-17 23-08-17 15-09-17 15-11-17 01-12-17 01-10-17  15-10-17 MEMO t Pre-DIC/DIF & requests for electrical distribution Final DIC/DIF Activities Schedule & IMPACT creation Technical Files ready for EL contractor Presentations of YETS 2017/2018 Users Activities Presentation of YETS 2017/2018 EN-EL activities in coordination meetings SPS, PS and LHC complexes Antonio GONZALEZ (Fibre Optics and Cabling section) 18 JUL 2017

EN/EL Requests at Service Portal A new service catalogue using the CERN Service Portal has been developed, see address below: https://cern.service-now.com/service-portal/customer- service.do?name=ElectricalFibre All requests related to cabling (DIC, DIF, DIR, DFP), electrical installation works, and the necessary instructions are available via this application. DIC : Demandes d’Installation de Câbles. DIF: Demandes d’Installation de Fibres. DIR : Demande d’Installation de Racks. DFP : Demande Fourniture Patch Cords. 18 JUL 2017 Antonio GONZALEZ (Fibre Optics and Cabling section)

Antonio GONZALEZ (Fibre Optics and Cabling section) Contact Persons Marcin SZEWCZYK 16 98 43 marcin.szewczyk@cern.ch 18 JUL 2017 Antonio GONZALEZ (Fibre Optics and Cabling section)

Thank you for your attention! 18 JUL 2017 Antonio GONZALEZ (Fibre Optics and Cabling section)