Water Services Trust Fund

Slides:



Advertisements
Similar presentations
CODE OF PRACTICE FOR BUILDINGS
Advertisements

Steel Construction.
Comparison of Concrete Reinforced Building System and Light Steel Building System.
East Carolina University Compressed Gas Safety Training Program
Pipe Supports and Hangers
Subpart R Steel Erection
Intermediate SFFMA Objectives: – hrs received.
What is safe building? Life of a reinforced building lasts 50 to 100 years or longer; Safe building means it will not collapse during span of life; A.
CE REPAIRS AND REHABILITATION OF STRUCTURES
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
IFSQN CODEX and Good Manufacturing Practice Training Guide.
TECHNICAL SECTION 2000 TRAINING LIQUID WASTE LAND USE SOLID WASTE BIOSOLIDS HOUSING VECTOR WATER INDIVIDUAL PUBLIC.
Civil engineering branches & scopes
PRESENTATION ON OPEN TOILETS 1. This presentation serves to provide background and report on progress regarding the construction of toilet top structures.
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
Health & Social Care Apprenticeships & Diploma
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Quality of Works 1.
Environmental Toolbox. 2 General Awareness Training Module For Soldiers, Sailors, Airmen, Marines, and everyone in a base camp.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
An An IBEW ® Program of Job Responsibility The IBEW Local 38 Code of Excellence.
Safe Operation of Storage Tanks: Decommissioning and Repair
Preventing Slips & Trips at Work
July 2011 Improving the image of construction. July 2011 PROJECT MATRIX July 2011 Update.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Planning & Presence Operation of water supply schemes for the urban.
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
ACTIVE LEAKAGE CONTROL SHARING ON PIPE FAILURE IN NEW DEVELOPMENT AREA.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
 Final Inspection Reminders  and  Recurring Corrective Work Items.
5. FERROCEMENT.
Technician’s Guide & Workbook for Duct Diagnostics and Repair.
Maintenance.
Facility Environment 1.
Engineering Technical English
Concrete Repair.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Water Services Trust Fund Field Monitors Training Workshop
Chejja.
Environmental Assessment
EARTHQUAKE RESISTANT DESIGN An Over View of the Subject
Mold Awareness Training
DURABILITY OF CONCRETE STRUCTURES RURAL POLYTECHNIC TARIHAL
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
Top Tips for a Safe Room 13th May 2017
WELCOME.
Flood: Build a Stronger Plinth
DO’s and DON’Ts of toilet construction
Food Safety Grain Storage Eugene Rossouw.
Building Construction I Sofia Sebastian 1
CONCRETE FORMWORK Formwork.
East Carolina University Compressed Gas Safety Training Program
CIVIL WORKS CONSTRUCTION TECHNOLOGY 2017/18
WASH Objective 1: Affected people have safe and equitable access to a sufficient quantity of water for domestic needs, per sector's standards Indicator.
DTF implementation Roles and responsibilities
Building Frame (Column & Beam)
STRUCTURAL TIMBER FRAMING
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
The UBSUP/SafiSan Programme
Water Sector Trust Fund
Prevention through planning, control and monitoring Harold Chinogurei
Carleton College Facilities Management
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
Non-Structural Safety
Water Services Trust Fund Training Workshop for Field Monitors Role of Field Monitors within the Project Task Team Sheillah Karimi (2009, updated in.
M-Learning 4 Those Who Care
Fiber Reinforced Polymer Systems
Presentation transcript:

Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Quality of Works

Why Emphasise Quality? To promote use of water in a hygienic environment For sustainability and durability For returns on investment Image of the WSP among the public

Lessons from the WSTF Pilot Projects Quality of construction works was largely affected by: Weak supervision Lack of adherence to technical specifications Sloppy and incompetent Contractors Theft of materials Varying site conditions

Quality of works: Examples of “Don'ts” Poor finishing Evidence of poor concrete mix Neglect of the water kiosk Evidence that drawings were not followed No angle bars

Examples of “Don'ts” (cont’d) Incomplete work Poorly done soak pit Gulley trap is uncovered Accumulation of solid waste Unkempt surroundings Uncovered; posing a hazard

Examples of “Don'ts” (cont’d) Poor concreting (ELDOWASS) Short kicker bars (NZOWASCO)

Examples of “Don'ts” (cont’d) Unacceptable poor quality of columns (NZOWASCO) Unacceptable result of using poor materials (NZOWASCO)

Examples of “Don'ts” (cont’d) Leakage Wrong material usage Poor quality improvising

Examples of “Don'ts (cont’d) Poor plumbing Prone to rain water Lack of repair works

Examples of “Don'ts” (cont’d) Poor drainage around kiosk Effect of leaking tank on roof slab

How Do We Ensure Quality? Following construction guidelines and the Toolkit Drawings and specifications Routine inspections Testing and approval of materials Ensuring safe and healthy environment

Technical Specifications Materials Rejection of substandard materials Examination of all materials arriving on site- should fit the specifications Handling and storing materials with care Codes of practice Reference to be made to relevant codes of practice: (BS 8110, BS 5950, BS 6399, BS 4466 etc.)

Technical Specifications (cont’d) Drawings All technical drawings to be accurately adhered to A set of the drawings must be provided on site at all times Setting Out Works shall be set out accurately WSP to establish and locate all benchmarks, lines, boundaries and/ or levels on the ground The Site Accessible; with secure storage for materials and plant The works should not adversely interfere with the environment

Technical Specifications (cont’d) Concrete Mix concrete in specified ratios at the site Approved mechanical means of handling concrete are encouraged Concrete should be placed in single operation to the full thickness of slabs and beams and similar members Concrete in columns should be carefully placed and well vibrated Work cube tests recommended

Technical Specifications (cont’d) Curing of Concrete Protect concrete from premature drying by protection from wind, sun or rain by sheeting, or other approved means Wet the concrete continuously for 14 days Reinforcement Fabrication, bending and fixing of reinforcement should be in accordance with standards Shall be free from rust, grease or any substance likely to reduce the bond between steel and concrete

Technical Specifications…cont’d Finishes Painting and other finishes to be carried out on clean surfaces According to specifications Fittings High quality plumbing parts required; especially gate valves, bends and taps Right class of pipes should be used

Supervision of Labour Competence Workers on site should be experienced Removal of incompetent labour encouraged Approval Work done shall be subject to approval by Engineer Engineer to ensure that works are complete before payment

Supervision of Labour (cont’d) Drawings Workers should be able to interpret all drawings Safety & Health Safety and health needs of workers should be addressed

Thank you!