Huntington Convention Center of Cleveland & Global Center for Health Innovation Presentation to Cuyahoga County Convention Facilities Development Corporation Board APRIL 21, 2017
EXISTING FLOOR PLAN
PROPOSED FLOOR PLAN
PROPOSED FLOOR PLAN –EXTERIOR ENTRY POINTS
PROPOSED FLOOR PLAN –INTERIOR ENTRY POINTS
PROPOSED FLOOR PLAN –FOLDING GLASS WALLS
PROPOSED FLOOR PLAN –OPEN TO ATRIUM
EXISTING CONDITIONS
PROPOSED – GLASS WALL CLOSED
PROPOSED – GLASS WALL OPEN
PROPOSED – EXTERIOR
CURRENT ACTIVITIES Preliminary fixture plan received. Lease negotiations under way. ABP preparing preliminary plans with new street entrance and collapsible storefront. Levy Restaurants finalizing budget. 3rd party site survey to begin. RLBA working with Starbucks to prepare preliminary estimates. Levy Restaurants finalizing budget.
NEXT STEPS RLBA to prepare statement of probable costs. RLBA to prepare construction documents to convert current space to vanilla shell. ABP to produce design development drawings. RLBA to prepare statement of probable costs. RLBA to prepare construction documents for tenant fit out. Starbucks to prepare schematic drawings for approval. (Expected start 5/9.) RLBA to prepare statement of probable costs.