R. Denz, A. Gomez Alonso, AT-MEL-PM

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
TE-MPE-EP, RD, 26-Aug Workshop on QPS Software Layer Hardware / Agents R. Denz, TE-MPE-EP.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
CV Industrial Control SystemsJCOV Meeting October 23, 2003 ST/CV ACTIVITY Industrial Automation ST/CV is responsible for the design and implementation.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
MPE LS1 workshop Summary Session 4 – Quench Detection R. Denz, D. E. Rasmussen.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
V4.
(Access system for HWC)
Data providers Volume & Type of Analysis Kickers
Putting it all together
Minimum Hardware Commissioning – Disclaimer
Markus, Mathieu, Enrique, Rudiger, Serge
CV PVSS project architecture
Document Plan & Milestones WP7
Configuration Management and Layout Database ELENA Project
How do we tackle the extended requirements?
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
Powering from short circuit tests up to nominal
Commissioning and Testing the LHC Beam Interlock System
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Detailed global view on protection and detection of the circuits
Engineering Processes
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Interlocking of CNGS (and other high intensity beams) at the SPS
M. Zerlauth, I. Romera 0v1.
Noor Vergeer, Wojtek Kalocinski Border management and Schengen
Welcome to the CS-Workshop February 2nd/3rd 2006 Holger Brand
Commissioning the European XFEL cryogenic system and best practice
Configuration of BLETC Module System Parameters Validation
Review of hardware commissioning
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Close-out.
Presentation transcript:

R. Denz, A. Gomez Alonso, AT-MEL-PM Quench Protection System AB-CO services required from now to colliding beams … R. Denz, A. Gomez Alonso, AT-MEL-PM

Interfaces between QPS and AB-CO Databases Configuration databases Storage of data generated by the various QPS systems Fieldbus Network, gateways, drivers, consultancy QPS supervision Software interface between QPS controllers and gateways Supervision application Logging, alarms and timing Post mortem Automatic procedures Powering interlocks (see 2nd presentation)

QPS controls layout Equipment per sector: 4 x gateways controlling 6 fieldbus segments with up to 60 clients 201/205 DQAMC type controllers ~29 DQAMS type controllers ~30 DQAMG type controllers

Databases Maintenance and update of the existing databases QPS signal names Required for QPS supervision, post mortem, logging etc. QPS equipment LHC functional layout database Configuration tools for controls software Fieldbus definition (bus arbiter), variable generation … Links to other LHC databases (MTF, cablothèque, etc.) Storage of QPS data Post mortem database Logging & alarm databases

Fieldbus Network qualification in LHC to be completed To be done prior to installation of QPS equipment Successfully done for sector 8/1, where QPS installation will start Support (soft & hardware) during QPS individual system tests (from 10/2005 onwards) Network, gateways, timing (LHC slow timing with 1 ms precision), drivers, diagnostic tools Gateways & drivers also required for QPS test benches until end of 2006 (surface tests) Sector 8/1 will be the 1st occasion to test the QPS fieldbus under realistic conditions (60/120 controllers per bus / gateway) Surprises, which may require additional support, cannot be excluded Fieldbus support of course to be continued during LHC hardware commissioning and beyond

QPS supervision I Software interface between QPS controllers and gateways Task shared between QPS (controller level) & AB-CO (gateway level) Includes development of the QPS expert console Development of the gateway interface application “sub-contracted” to AB-OP Results are excellent but availability may be not sufficient for the next 6 months, when several milestones have to be completed Task completed for 1 out of 3 basic QPS controller types Interface for next controller type (DQAMG) must be available and tested by the end of November 2005, the last one (DQAMS) by January 2006 Additional support required for Maintenance & update of the gateway software (long term support) Debugging during individual system tests & LHC hardware commissioning (until 2007)

QPS supervision II Supervision application (PVSS) Application for LSSL8 must be tested and operational beginning of January 2006 In general QPS supervision applications must be fully available prior to the testing & commissioning of the interlocks The supervision application for the main circuits should be available for the final phase of the QPS individual system test Handling of the QPS POWER PERMIT signal to be integrated into the supervision application (see also 2nd talk) Once commissioned, long term support, maintenance and update required throughout the LHC lifetime

QPS supervision III Logging, alarms and timing Scope and content defined Services must be available prior to the testing of the interlocks and the subsequent cool-down of the machine LSSL8: beginning of January 2006 Post mortem data base Unfortunately not available yet as it would be helpful for the QPS surface tests Required from end of November 2005 onwards Superconducting circuits cannot be powered without a running post mortem system Post mortem – data retrieval and analysis (see also Felix’s presentation) Data viewers & browsers Analysis tools These applications can be validated within the QPS surface tests

QPS supervision IV Automatic procedures for QPS Procedures for QPS individual system test Batch processing of commands to be sent to QPS equipment Prior to LHC commissioning but as well during LHC exploitation (monthly test of QPS) Procedures for LHC hardware commissioning Sequencer application Interlock testing and commissioning Battery tests and commissioning of corrector circuits Definition of the procedures by AT-MEL, implementation by AB-CO Definitions for QPS individual system test currently in preparation LSSL8 can be commissioned without automatic procedures Procedures must be available for the hardware commissioning of sector 8/1

Conclusions QPS functionality depends essentially on the services provided by AB-CO There will be no powering etc. without these services properly running Collaboration between QPS and AB-CO so far smooth and effective Delays and problems have been handled in a flexible way There will be less flexibility once QPS individual system test and LHC hardware commissioning has been started QPS controls requirements have been defined in a long term process involving all concerned parties No new requirements and/or service requests so far but individual system tests and hardware commissioning may lead to additional requirements A few potential future bottlenecks (not yet showstoppers) have been identified