CIVIL AVIATION AUTHORITY May 2006

Slides:



Advertisements
Similar presentations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Advertisements

Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
AERODROME CERTIFICATION IN JAMAICA JAMAICA CIVIL AVIATION AUTHORITY.
The Schengen Convention and its relevance to cross-border Microlight Flying The situation in Malta.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Collecting Quantitative Data
Chapter 10 Collecting Quantitative Data. SURVEY QUESTIONNAIRES Establishing Procedures to Collect Survey Data Recording Survey Data Establishing the Reliability.
Aerodrome Certification Exercise The Process
International Civil Aviation Organization Unmanned Aircraft Systems International Standards Progress Leslie Cary Secretary UAS Study Group Technical Officer,
Rules, Regulations, Air Law Trends impacting on Stiffies and Floppies By Ulf Arndt, 2004.
International Civil Aviation Organization Remotely-Piloted Aircraft Systems Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
Air Law 1.03 Licensing References: Aeronautical Information Manual
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
13. Airworthiness of Aircraft-1 Certificate of Type Approval Certificate of Type Approval A Certificate of Type Approval approves the basic design and.
47 th Annual QLS Vincent’s Symposium 27/03/09 Negligence Claims against Pilots in Light Aircraft Accidents Peter Carter, Carter Capner Law.
This presentation contains notes in the notes sections for use by instructors when presenting to students.
Downloaded from Global Positioning System What Flight Instructors need to teach! What your pilot/student needs to know!
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 Aerodrome Certification Requirements in Pakistan Module - 4 AERODROME CERTIFICATION COURSE September 15.
Airspace Infringements Iain McDermott-Paine, Southampton Airport AOA Representative – Airspace Infringement Working Group.
3 Air Navigation Services Air Traffic Services (Control, Information, Alert) Aeronautical Information Service, NOTAM Aeronautical Meteorology Service.
The Project for Capacity Development for Transition to the New CNS/ATM Systems in Cambodia, Lao PDR, and Vietnam 1 The Basic Training on Management of.
International Training: Area Navigation Pre-flight
International Aircraft Systems Fire Protection Working Group CABIN CREW FIRE TRAININGNEEDS ANALYSIS CABIN CREW FIRE TRAININGNEEDS ANALYSIS A study carried.
EATS 2009 Evolving European Regulatory Environment Prague November 2009 Jean-Marc Cluzeau EASA Rulemaking Directorate.
PERSONNEL LICENCING REGULATIONS  Afiland adapts ICAO Annex 1 SARPS  Except  Flight Navigator,  Flight Engineers  Flight Radio telephony Operators.
The FPP Test What you (or your students) need to know Flight Training Division Presentation AIA Aviation Week Conference July 2011.
Aircraft Maintenance Standards Department Mitigating Maintenance Errors in Aviation Royal Aeronautical Society, London, 15 October 2003 David Hall Mitigating.
Functional Check Flight Symposium ANAC Presentation Homero Montandon – Test Pilot Airworthiness Branch Vancouver – Canada, 7 and 8 Feb
Operation Specifications VFR. W ESTWIND A IR S ERVICE.
 ARRANGEMENT OF REGULATIONS  PART I- PRELIMINARY 1. Citation 2. Interpretation 3. Application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
GNSS use ATM PLANNING CGSIC Australia 17 July 2006 Jorge Woods.
ACCEPTABLE METHODOLOGY AND STANDARDS Carey Edwards CRM Advisory Panel.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
Topics for Remote Pilot Certification Exam Alexus Garcia Unmanned Aircraft System Safety Center of Excellence University of California.
SET Commercial Transport Training - Oysterair
UK Performance-based Navigation (PBN) Implementation Status
Global Positioning System
Performance Based Communication and Surveillance (PBCS)
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
PlaneWrong AGM Thursday 13th October
Remotely-Piloted Aircraft Systems
Air Law 1.03 Licensing References: Aeronautical Information Manual
Global Positioning System
Certificate of Waiver or Authority
What the US can learn from international UAS law
Unit-3 FLIGHT INFORMATION SYSTEMS
Regional RAIM Prediction System – Progress Report
Air Law 1.03 Licensing References: Aeronautical Information Manual
AIRWORTHINESS OF AIRCRAFT
Oceanic and International Operations
Best professional Pilot Training in India Airwing Aviation Academy Address: First Floor, Rachit Complex, Near Guru Nanak Girls.
THE AFILAND CIVIL AVIATION (AIR NAVIGATION SERVICES) REGULATIONS, 2009
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
Session – 4: Existing ICAO Standards relating to Air Traffic Control
AFILAND FEDERAL CIVIL AVIATION REGULATIONS
Aerodrome Certification Exercise The Process
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Remotely-Piloted Aircraft Systems
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
GNSS Approach for General Aviation
Global Positioning System
USOAP AIG EFFECTIVE IMPLEMENTATION(EI) AAIB MALAYSIAN EXPERIENCE
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Independent Trial of Design Process Procedure Approval ATM Operational Use CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Six Trial Aerodromes Blackpool Durham Tees Valley Exeter Gloucester Inverness Shoreham CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Trial Procedures are to be flown in VMC From 11th May ’06 to 25th Oct ’06 UK Licensed Pilots with IMC or IR UK Registered Aircraft (inc. Helicopters) By Prior Permission Only Correct GPS Equipment & Installation Only CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Correct GPS Equipment & Installation E/TSO C129 (A) or E/TSO C146A Permanent Installation (No Hand-Held’s) RAIM Enabled (inc BARO Aided) Linked to HSI / CDI Clear Indication of Navigation Source Integrity & RAIM Warning CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Valid Aeronautical Database Containing RNAV Approach Procedure Unalterable by the Pilot Checked by the Pilot User Defined Approaches Prohibited Overlay Approaches as Secondary Reference Only CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Trial Website: https://www.gpstrials.leeds.ac.uk Pilots’ Guide Instructors’ Guide Terms of Participation Pilots’ Declaration & PTR Number Pilots’ Reporting Questionnaire CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Obtain Prior Permission Carry a Competent Observer Make Notes in Flight (Observer’s Job!) Complete Pilots Report On-Line, After Flight CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006 RNAV APPROACHES Data Collection and Analysis by Imperial College London. No Personal Data to CAA at Any Time CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006

CIVIL AVIATION AUTHORITY May 2006