2016 Cost of Service Rate Application

Slides:



Advertisements
Similar presentations
Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
Advertisements

EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
1 Northeast Public Power Association Electric Utility Basics Electric Rates and Cost of Service Studies.
Understanding Ontario’s Electricity System
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
An Overview of Our Regulatory Proposal
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
September  In 1998 Queensland Electricity customers exceeding 40GWH were given the opportunity to enter the National Electricity Market (NEM).
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Provident Energy Management Inc. Electrical Deregulation Presentation for DEL Property Management Inc. Proud Members: Continental Automated Building Association,
Seattle City Light – AMI Business Case Results
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Provident Energy Management Inc. Electrical Deregulation Presentation for DEL Property Management Inc. Proud Members: Continental Automated Building Association,
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Module 2 Community Energy Planning within the Broader Provincial Energy Planning Framework.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Wholesale Electricity Spot Market (WESM)
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
Business Intelligence Energy, Resources and Utilities.
Entrepreneurship.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
ERCOT MARKET EDUCATION
Standing Up for Small Business 2017 Ontario Budget Recommendations
SHRM Poll: Green Jobs—Are They Here Yet?
EE5900 Cyber-Physical Systems Smart Home CPS
Economic Systems and Structures
Proposed Draft Financial Plan April 10, 2017
APTA Sustainability Workshop 2016
Portugal Cove - St. Philip’s
City of Petersburg Water and Wastewater Rates
JES Electric Price Increases Compel Businesses to Use Modern Purchase and Use Programs Overview 2017.
Irvine Ranch Water District Distributed Energy Storage Case Study
Process Economics Factors that affect profitability
CITY OF NEW SMYRNA BEACH
Power Generation and Distribution
Narragansett Electric Rate Classes
EPCOR White Rock Rate Application
MARKETING REQUIRES MONEY
City of Sisters, OR 2017 Water & Sewer Rate Study
System Control based Renewable Energy Resources in Smart Grid Consumer
Pricing Strategy.
Chapter 36 Financing the Business
Distribution Loss Factors for Cost To Serve study
APTA Sustainability Workshop 2016
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
City of Lebanon, Missouri Electric Department
Iowa Energy and Policy Issue Discussion
Idyllwild Water District
EE362G Smart Grids: Architecture
Regulation for Smart Grids
Mike Mumper & Brian Kick Good afternoon
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
How to Create a Budget.
Retail Rate Design & Administration
PA Supplier Workshop Net Metering September 10, 2019.
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

2016 Cost of Service Rate Application Rideau St. Lawrence Distribution Inc.

Who is RSL? Local employer, with offices in Prescott and Morrisburg 18 local employees Provides electric distribution to Prescott, Morrisburg, Iroquois, Cardinal, Westport, and Williamsburg Provides water and sewer billings for Prescott, South Dundas, Cardinal, and Westport

Why RSL? Local control and management Access to all RSL staff Lower Delivery rates Profits are returned to our communities

The Ontario Electricity Market Generation: Generators are the sellers in the Ontario electricity market. They communicate with the Independent Electricity System Operator (IESO) to make electricity offers. Dispatch and Settlement: The IESO forecasts how much power will be needed at a given time, and constantly monitors changes in demand.

The Ontario Electricity Market At five-minute intervals, the IESO balances supply with demand. As more electricity is demanded, more expensive offers from generators are accepted by the IESO. Each hour, the IESO takes the weighted average of these five-minute interval prices and sets the Ontario hourly spot price.

The Ontario Electricity Market Flow of Electricity: The physical energy is transmitted from generators to high-voltage transmission lines. Distributors like RSL then take the electricity from the transmission lines and deliver it to consumers in accordance with IESO directions.

The Ontario Electricity Market Supply to consumers: The local distributor physically delivers the electricity and passes through the spot market price of the electricity directly to the customer. This is called Standard Supply Service (SSS, or “default service”).

The Ontario Electricity Market Transmission + Distribution = Delivery Charge on your bill

Your Electricity Bill Electricity: Charges related to the energy consumed. Delivery (Distribution and Transmission): The cost of delivering electricity from generators to you. Regulatory: The cost of administering the wholesale electricity system and maintaining the reliability of the provincial grid.

Your Electricity Bill The charge for the electricity commodity, which is roughly half of a customer’s bill, is a price set in the competitive market. In contrast, the charge for electricity distribution and transmission is regulated and approved by the Ontario Energy Board (OEB).

Understanding Your Bill The majority of RSL’s customers receive a bill that contains charges for electricity, water, and sewer utilities. The following graphic provides an example of a typical residential RSL bill.

The Electricity Portion

Why Is RSL Applying For New Rates? Every 4 to 5 years, all utilities must file a “Cost of Service” rate application with the OEB. The application shows the amount of money that has been spent on Capital Projects and Operations over the past 4 years. The utility estimates the money required for the upcoming years Capital and Operations costs.

How Much Will The Monthly Bill Increase?

Rates Calculation We provide an estimate of electricity expected to be used by each customer class. Costs are allocated to each customer class. Based on the costs and the consumption, rates are calculated for each customer class.

Fixed Versus Variable Rates For past rates, part of the charges were fixed amounts, and the other part was based on the amount of electricity used. The OEB has mandated that all utilities shift the rates to be 100% fixed. The change in the rate structure will be phased in over the next few years. The change will have a larger impact on low-usage customers.

Operations Our Operating costs include the following: Distribution System Maintenance Billing and Collecting Customer Service Administration

Capital Costs New customers (subdivisions, businesses) Replace aging poles, wires, transformers, and meters Substation improvements and replacements Vehicles Computer Hardware and Software

Cost History

Reasons For Cost Increases Inflation (cost increases from suppliers, negotiated wage increases) New mandated costs: Smart meters and electronic meter reading Customer Satisfaction Surveys Safety Awareness Surveys Monthly Billing Increased Capital Spending: Replacement of Digger Truck Backup transformer for the substation in Iroquois Aging pole and wire replacements

2016 – 2020 Rideau St. Lawrence Distribution System Plan

Background New regulations require that RSL file a Distribution System Plan (DSP) with the Regulator - Ontario Energy Board every 5 years Consultation will help inform our plan Continuous Municipal coordination of projects Customer consultation Cost of Service Rate Application Distribution System Plan describes the 5-year Capital and Maintenance plan Why are we here: The Energy Board requires us to file a Distribution System Plan – the DSP combines our Asset Management (Condition assessment, replacement) + Our Green Energy Plan – which identifies connections to renewable generation, + regional Planning items - when all inter connected produce a capital and maintenance activities. The theory is that the plan should be well informed and not duplicate efforts by other distributors, transmitters for regional efforts. 16-02-15

Overview RSL operates 6 disconnected urban communities RSL maintains and operates older assets The DSP provides for systematic replacement of those assets RSL operates 6 disconnected urban communities – in many ways, this is like operating 6 smaller utilities – each community has it’s requirements as a result of history RSL is an embedded utility – all areas are supplied by Hydro One. In general – the system that we operate tends to be older. 16-02-15

Main Capital Priorities Safety along with sustained reliability along with environmental regulations are identified as the main project priorities. Safety Electrical Safety Authority (ESA) recommends replacement of small conductor wire (approximately 10 km of wire), live front and poletrans type transformers Environmental Ministry of the Environment requires removal of equipment in-service containing PCBs by December 31, 2025 RSL has about 100 transformers containing PCBs, of which approximately 50 will be replaced in the proposed 5-year plan Reliability RSL replaces assets based on age and condition to maintain reliability Safety and Reliability are the main drivers for the plan for the next 5 years. As it happens – the items that affect safety – tend to be the older type construction that is at or near end of life. 16-02-15

5-year Plan Summary System Access focuses on modifications to provide customers with access to electrical services System Renewal is our main focus – replace & refurbish system assets to maintain safety and continuity of service to customers System Service focuses on improving operational objectives and future customer requirements General Plant refers to non-distribution system assets – mainly vehicles and software/hardware systems to support operations This slide represents the 4 categories that we have been asked to use for our capital expenses. Looking forward the yearly average over the 5 years is $474,000 including the Digger replacement. Without the Digger replacement398,000. 16-02-15

System Renewal / Service Projects small conductor removal (on right of way & rear lot) transformer replacements PCB live-front PoleTran pole replacements substation projects SERVICE new feeder construction Renewal of the system to ensure continued reliability remains a priority. The renewal projects as mentioned contain an element of safety along with reliability. Small conductor that is mentioned is now considered dangerous for staff to work on or around – as there is a risk of it breaking and thus is a priority. Live front transformers – shown here in the middle picture – are nearing end of life and pose a danger to workers and thus will be replaced. Service: The project identified here – is part of redundancy in the system – similar to looping water lines. 16-02-15

2016 Capital Plan For the purposes of the presentation we have focused ion the items that are more visible to the community. In 2016 our largest single item is the purchase of a new digger truck at $370,000 to replace the 1999 unit that is currently in service. Delivery is expected late in the year. For the purposes of presentation – we have only shown projects that have an estimated value of at least $5,000. Individual poles that are replaced in any given year – number about 10 and are grouped together. 16-02-15

2017 Capital Plan 16-02-15

2018 Capital Plan 16-02-15

2019 Capital Plan 16-02-15

2020 Capital Plan 16-02-15

Sample Project Sheet 16-02-15

Expected Outcomes Maintain employee and public safety Maintain high level of reliability Maintain customer service levels Replace assets through an organized approach based on technical assessment, recognizing financial and operating constraints 16-02-15