EN-Handling Engineering Group

Slides:



Advertisements
Similar presentations
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
CMS and Atlas cranes characteristics In the framework of WP8 TAS/Q1 region Gilles Roche & B. Feral – EN-HE-HM 02/06/2015.
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
Collimation Remote Handling Highlights from work for collimation remote handling and remote survey. Plans Keith Kershaw EN-HE 14 June 2011.
FCC layout: lifts & cranes Ingo Rühl / EN-HE FCC Infrastructure & Operation Meeting 17 December 2014.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
Transport and handling at CERN for FAIR
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
LS1 – EN-HE Transport and Handling related issues 12 th June 2012 I. Rühl / EN-HE.
Transport and Handling (T&H) considerations for HL-LHC
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
Transport & Handling of Detectors TAN Workshop S. Prodon –
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
BUDGET 2012 EN-HE 29/03/ EN-HE CONTRACT LIST - OPERATION7’190 KCHF - PROJECT1’738 KCHF - CONSOLIDATION 4’239 KCHF JMS.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
TE-CRG Activities D. Delikaris, TE-CRG.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
I. Bergevoet - Training preparation
YETS & LS2 Works EN-EL / Power distribution
Doing business with CERN Anders Unnervik
Some arrangements for personnel safety 1- Procedures for access
Asset & Maintenance EN-HE group
CLIC Handling Engineering Update
RF-SRF Infrastructure: Operation,Maintenance&Upgrades
Equipment simplified model SMR UR safety
Space Management and Logistics during LS2
FCC Cryo-magnet Logistics
EN-HE group meeting
Cryostat procurement, status and plan, QA/QC
SPS cryogenic proximity equipment and SM18 validation
EN-HE Group meeting 4th December 2015
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
EN-HE SPS works during EYETS
Industrial trucks Cern fleet Family list
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
IT-4328: Technical Specification
DS Collimators TE-MSC-CI
Infor EAM in the Handling Engineering Group at CERN
Experimental Areas – LS2 planning
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
Review Bloc 4 and SM18 facilities and upgrade
Presentation transcript:

EN-Handling Engineering Group Ingo RUEHL / EN-HE

EN-HE Organization Chart 2017 Handling Engineering Group I. Rühl EN-HE Organization Chart 2017 Deputy Group Leader C. Bertone   Group Administrator – JM. Soudan Secretariat (50%) – M. Morer-Olafsen   MANDATE provide transport and handling services for the technical infrastructure of CERN, accelerators and experiments this includes the design, the tendering/procurement, the installation, the commissioning, the operation, the maintenance and decommissioning of standard industrial and custom built transport and handling equipment Handling Maintenance H. Lourenco Lift Management D. Lafarge Heavy Handling C. Bertone Cranes G. Roche J.-P. Granchelli R. Rinaldesi O. Böttcher P. Bachmann (TTE)   Industrial trucks J.-M. Chevalley B. Feral Maintenance Methods C. Bal   J. Brun J-P. Lappe N. Perez Team ‘Handling’ S. Pelletier P. Brunero F. Daclin E. Dugue S. Fumey Y. Seraphin P. Vallet   Team ‘Projects’ J.-L. Grenard J.-B. Bonnamy (VIA) M. Czech (F) F. Delsaux (IS – KA) Team ‘Transport’ T. Mazzarino R. Brun 17.01.2017 CERN - ITER workshop

EN-HE-Heavy Handling Section Mandate prepares, organizes and executes all transport and handling operations for accelerators and experiments and CERN users in general manages several supply, service and rental contracts During the standard CERN operation phase ~55 FTE are provided via an industrial support contract for transport and handling activities. 17.01.2017 CERN - ITER workshop

Main contracts S172 Altéad (CH) : 55 (up to 100 FTE) for transport and handling operations C002 Frederici (CH) : Mobile crane and exceptional transport operations B1257 L2S (FR) : Mobile crane operations 17.01.2017 CERN - ITER workshop

Transport & handling requests All requests are created via EDH (ELECTRONIC DOCUMENT HANDLING SYSTEM). Standard fields such as height, width, weight, place of loading and unloading,… but also Specific fields to define the nature of the material (fragile, radioactive, chemical, …) By default all transport and handling activities are covered up to CHF 500,000 by the contractor. This amount can be increased upon request (invoiced to requestor). 17.01.2017 CERN - ITER workshop

EDH home page 17.01.2017 CERN - ITER workshop

Internal transport and handling request 17.01.2017 CERN - ITER workshop

17.01.2017 CERN - ITER workshop

EDH Request Radioactive RP Unit Chemical HE responsible ADR Conventional Conventional Dispatcher (QUALIAC) Radioactive, chemical > 500000 CHF Accord for the transport of Dangerous goods on the Road Accord pour le transport de materiel Dangereuse pour la Route MEYRIN SPS LHC PL SPL CRANES 17.01.2017 CERN - ITER workshop

Example – Procedure for the replacement of a SPS ‘Quadropole’ 17.01.2017 CERN - ITER workshop

17.01.2017 CERN - ITER workshop

17.01.2017 CERN - ITER workshop

Examples - Very special transports via contract C002 17.01.2017 CERN - ITER workshop

Contractor’s workforce curve – Values and weights of materials transported. 17.01.2017 CERN - ITER workshop

Statistics of T&H operations Activity 2016 2015 2014 2013 2012 Mobile crane operations 1’718 1’933 Handling operations 2’728 2’574 Transports* 11’604 11’890 TOTAL n° of operations 16’050 16’397 25’477 22’389 18’565 TOTAL mass [kT] 113 80 203 173 84 TOTAL value [MCHF] 652 596 947 801 588 *1 Radioactive 1’334 1’468 *2 Dangerous goods (ADR 7) 679 387 17.01.2017 CERN - ITER workshop

T&H operations SM18 : rotation and insertion of the vacuum cryostat and cryo-buffer in the new pit SM18 ICARUS : 1st cryostat rotation for welding. 2nd rotation already foreseen LINAC4: target installation inside steel dump 17.01.2017 CERN - ITER workshop

T&H operations FAIR : unloading and installation of 2 skids in building 279 SPS : transfer of the “hot” spare dump from build 954 to build 867 for repair ELENA : All dipoles and quadrupoles installed 17.01.2017 CERN - ITER workshop

Handling studies Design, integration and installation PSB passage through the hopper with new magnets SPS : handling of the new cold box in BA06 HL-LHC: Passage and opening of the RUX 45 roof for new QRL for RF cryo- module 11-tesla-dypoles, CC and cryo-collimators: transport and installation to help design of the cryostat 17.01.2017 CERN - ITER workshop

Handling studies HL-LHC: Study of transport area in the new layout Crab cavities Build 107: installation of degreasing machine 17.01.2017 CERN - ITER workshop

Main equipment families DESCRIPTION CH FORKLIFTS (2 MOBILE CRANES 220t, 55t) 214 CS MAFI 65 RTH HEAVY ELECTRIC TRACTORS 36 RTL LIGHT ELECTRIC TRACTORS 119 RH TRAILERS (RTL, RTH) 185 LV LIFTING PLATFORMS 144 PR OVERHEAD TRAVELING CRANES 358 PA HOISTS 1221 HR LIFTING BEAMS 2623 PL TRUCKS 11 TR ROAD TRACTORS 9 ROAD TRAILERS 17.01.2017 CERN - ITER workshop

EN-HE – Industrial support and rental contracts Altead Transport & Handling services on the CERN site E119 Manutention & Chariot Maintenance services on industrial trucks on the CERN site E121 Reel + Altead Specialized EOT crane maintenance services on the CERN site E111 As Ascenseurs Maintenance service for lifts on the CERN site E080 Ascenseurs Schindler Maintenance service for lifts (LHC) C002 Friderici Special Rental of heavy vehicles for the transport of goods B1419 Grunderco Sa Maintenance and repair activities on CERN heavy road vehicules B1257 L2S Truck crane rental with driver B1389 Loxam (FR) Lifting platforms rental (France) B1390 Loxam (CH) Lifting platforms rental (Suisse) 17.01.2017 CERN - ITER workshop

EN-HE – Supply contracts B1455 Schindler Replacement of LHC lifts B1493 AS Ascenseurs Replacement of lifts in tertiary buildings B1421 Bonfanti Replacement and supply of EOT cranes up to 10 tonnes capacity B1422 Dismantling, refurbishment, replacement and supply of EOT cranes over 10 tonnes capacity B1458 Bemorail Crane rail consolidation 17.01.2017 CERN - ITER workshop

Handling is considered as high risk activity ‘SAFETY FIRST’ Summary Handling is considered as high risk activity ‘SAFETY FIRST’ INPUT Quality Timely PREPARATION Design, Integration Installation / operation manuals EXECUTION Authorized, qualified and experienced operators 17.01.2017 CERN - ITER workshop