KLOE offline & computing: Status report

Slides:



Advertisements
Similar presentations
Barbara Sciascia – LNF 1 K  semileptonic BR measurement B. Sciascia 4 may 2006 KpmKSL joint meeting.
Advertisements

Status report on EMC simulation... Part 3 The plan is to:  SURVEY the existing situation over the runs - Validation of plots using  and.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s M. Palutan et al.Trigger simulation parameters S. GiovannellaGEANFI.
Status of  b Scan Jianchun Wang Syracuse University Representing L b scanners CLEO Meeting 05/11/02.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
Offline Discussion M. Moulson 22 October 2004 Datarec status Reprocessing plans MC status MC development plans Linux Operational issues Priorities AFS/disk.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina, L.Lueking,
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
CDF Offline Production Farms Stephen Wolbers for the CDF Production Farms Group May 30, 2001.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
Offline/MC status report M. Moulson 6th KLOE Physics Workshop Sabaudia, May 2006.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
Progress on BR(K L  p + p - ) using a double-tag method A. Antonelli, M. Antonelli, M. Dreucci, M. Moulson CP working group meeting, 25 Feb 2003.
EGEE is a project funded by the European Union under contract IST HEP Use Cases for Grid Computing J. A. Templon Undecided (NIKHEF) Grid Tutorial,
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
E. De LuciaNeutral and Charged Kaon Meeting – 7 May 2007 Updates on BR(K +  π + π 0 ) E. De Lucia.
K  group activities K + K - retracking features New vs Old : resolution future planning. Conclusion and outlook K + K - retracking features New vs Old.
V.Patera – KLOE GM – Otranto – 10 June 2002 K  reconstruction status K + K - retracking features New vs Old : resolution New vs Old : efficiencies Conclusion.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
Status of K S   e analysis C. GattiT. Spadaro Selection on data Selection on MC Efficiencies from data, K L   e, K S    ,      , bhabha.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
Progress on F  with the KLOE experiment (untagged) Federico Nguyen Università Roma TRE February 27 th 2006.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
Reliability of KLOE Computing Paolo Santangelo for the KLOE Collaboration INFN LNF Commissione Scientifica Nazionale 1 Roma, 13 Ottobre 2003.
Status of the hadronic cross section (small angle) Federico Nguyen February 22 nd 2005  the 2002 data sample and available MC sets  trigger efficiency.
A more realistic photon simulation in Geanfi Capri , Kloe Phys Workshop III Motivations: A better description of shower simulation for photons and.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
2 nd KLOE Physics Workshop A. Ferrari 1 of the K L  K S regeneration cross section: F. Ceradini, A. Ferrari, A. Passeri Universita’ di Roma Tre & INFN.
MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What.
Offline resource allocation M. Moulson, 11 February 2003 Discussion Outline: Currently mounted disk space Allocation of new disk space CPU resources.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, R. Brock,T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina,
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
Jianming Qian, UM/DØ Software & Computing Where we are now Where we want to go Overview Director’s Review, June 5, 2002.
Progress on Simulation Software Hai-Ping Peng(USTC) Xiao-Shuai Qin(IHEP) Xiao-Rong Zhou(USTC) Yu Hu(IHEP) 2014 STC Workshop (ITP) Hai-Ping Peng.
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Status of the measurement of K L lifetime - Data sample (old): ~ 440 pb -1 ( ) - MC sample: ~125 pb -1 ( mk0 stream ) Selection: standard tag (|
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
1 P. Murat, Mini-review of the CDF Computing Plan 2006, 2005/10/18 An Update to the CDF Offline Plan and FY2006 Budget ● Outline: – CDF computing model.
Biagio Di Micco  mass measurement Systematics on   mass measurement Biagio Di Micco.
MC/OFFLINE meeting  Status  Request by Ke2 group  aob LNF
Biagio Di Micco  mass measurement   mass measurement blessing of the final result Biagio Di Micco.
Update on the false-dead DC wire problem
Status report on   f0  00
MC ’04-’05 objectives                                                       
Studies of prompt photon identification and 0 isolation in first p-p collisions at √s=10 TeV May 20, 2009 Meeting Frascati Raphaëlle Ichou.
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
Commissioning of the ALICE HLT, TPC and PHOS systems
Kloe plans for 500 pb-1 Since now up to mid/end 2003
KLOE Drift Chamber Review L.N.F. – March 9, 2001
ALICE Computing Upgrade Predrag Buncic
G. Venanzoni-LNF KGM Frascati, 19 Dec 2006
Grid Canada Testbed using HEP applications
KLOE General Meeting - LNF March,
Scalar mesons and d0-d2 at KLOE
Special edition: Farewell for Valerie Halyo
p0 life time analysis: general method, updates and preliminary result
Special edition: Farewell for Stephen Bailey
Quarkonium production in ALICE
BESIII EMC electronics
Special edition: Farewell for Eunil Won
Plans for checking hadronic energy
Commissioning of the ALICE-PHOS trigger
Measurement of b-jet Shapes at CDF
Presentation transcript:

KLOE offline & computing: Status report M. Moulson – INFN/Frascati LNF Scientific Committee Frascati, 2 December 2003

Offline perspectives: 2003  2004 With reference to 2001-2002 data: Completion of DST’s for K+K- stream Ambitious program for Monte Carlo production Looking towards the future: Preparation for data taking at 10 pb-1/day in 2004 KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

2003 Monte Carlo production Samples comparable in statistics to 450 pb-1 of data Each run in data set individually simulated s, pf, xf, background, dead wires, trigger thresholds… Comprehensive series of upgrades to simulation Suite of new generators introduced, particular emphasis on radiative processes Geometry carefully revised and response simulation tuned for both EmC and DC Inclusion of accidental activity from machine background Extracted from e+e– gg events in data set Inserted run-by-run to match temporal profile of data MC DST’s to provide convenient user interface KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC production status Production completed to date (~450 pb-1 2001-2002 data) Program Events (106) Time (CPU days) Size (TB) f  all 255 1100 6.9 e+e-  ppg 36 110 0.8 f  KSKL 410 1800 11.0 Running time, entire program: About 3 months elapsed on 60 offline CPU’s CPU time/event (typical): Generation: 200 ms Reconstruction: 175 ms KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC: Upgrades in progress HW efficiency vs. DC layer Data (Run 24973) MC (Run 24973) Simulation of DC hardware inefficiency Tuning of EmC response to p, m p, m deposit 20% more energy in MC than in data Response of fibers adjusted Good MC-data agreement for peak of E/p distribution Ongoing studies of cluster fragmentation in MC New generators for radiative K decays K0  pmng; K±  p±p0g, m±ng (IB); K±  p0±ng Expect these modifications to be available in 2-3 weeks Would like to rerun production already completed KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

New MC production requests All radiative f decays Includes f  r0p0  p0p0g and e+e-  wp0 110M events (450 pb-1 at 5:1 scale) Radiative Bhabha events: Eg > 100 MeV, 20 < q < 160 32M events (450 pb-1 at 1:10 scale) For tracking and cluster efficiency studies All f decays at high statistics for off-peak runs: 39M events with s = 1017 and 1022 MeV (2:1 scale) 18M events with s = 1019 MeV (1:1 scale) For analysis of f  3p Dalitz plot and f cross section About 1 week elapsed for each new program About 3½ months for all MC running, including reruns KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Offline CPU/disk resources for 2003 Available hardware: 23 IBM B80 servers: 92 CPU’s 10 Sun E450 servers: 18 B80 CPU-equivalents 6.5 TB NFS-mounted recall disk cache Easy to reallocate between production and analysis Allocation of resources in 2003: 64 to 76 CPU’s on IBM B80 servers for production 800 GB of disk cache for I/O staging Remainder of resources open to users for analysis KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Analysis environment for 2003 Production of histograms/Ntuples on analysis farm: 4 to 7 IBM B80 servers + 2 Sun E450 servers DST’s latent on 5.7 TB recall disk cache Output to 2.3 TB AFS cell accessed by user PC’s Analysis example: 440M KSKL events, 1.4 TB DST’s 6 days elapsed for 6 simultaneous batch processes Output on order of 10-100 GB Final-stage analysis on user PC/Linux systems KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

CPU power requirements for 2004 Input rate (KHz) B80 CPU’s needed to follow acquisition MC DST recon 76 CPU offline farm Avg L (1030 cm-2s-1) KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

CPU/disk upgrades for 2004 Ordered, expected to be on-line by January Additional servers for offline farm: 10 IBM p630 servers: 10×4 POWER4+ 1.45 GHz Adds more than 80 B80 CPU equivalents to offline farm Additional 20 TB disk space To be added to DST cache and AFS cell More resources already allocated to users 8 IBM B80 servers now available for analysis Can maintain this allocation during 2004 data taking Ordered, expected to be on-line by January KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Installed tape storage capacity IBM 3494 tape library: 12 Magstar 3590 drives, 14 MB/s read/write 60 GB/cartridge (upgraded from 40 GB this year) 5200 cartridges (5400 slots) Dual active accessors Managed by Tivoli Storage Manager Maximum capacity: 312 TB (5200 cartridges) Currently in use: 185 TB KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Tape storage requirements for 2004 Stored vol. by type (GB/pb-1) Tape library usage (TB) raw recon DST MC 118 2002 98 43 16 free 2004 est. Incl. streaming mods 57 49 43 16 Today +780 pb-1 +1210 pb-1 +2000 pb-1 KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Tape storage for 2004 Bando di gara submitted to Gazzetta Ufficiale Additional IBM 3494 tape library 6 Magstar 3592 drives: 300 GB/cartridge, 40 MB/s Initially 1000 cartridges (300 TB) Slots for 3600 cartridges (1080 TB) Remotely accessed via FC/SAN interface Definitive solution for KLOE storage needs Bando di gara submitted to Gazzetta Ufficiale Reasonably expect 6 months to delivery Current space sufficient for a few months of new data KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Machine background filter for 2004 Background filter (FILFO) last tuned on 1999-2000 data 5% inefficiency for ppg events, varies with background level Mainly traceable to cut to eliminate degraded Bhabhas Removal of this cut: Reduces inefficiency to 1% Increases stream volume 5-10% Increases CPU time 10-15% New downscale policy for bias-study sample: Fraction of events not subject to veto, written to streams Need to produce bias-study sample for 2001-2002 data To be implemented as reprocessing of a data subset with new downscale policy Will allow additional studies on FILFO efficiency and cuts KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Other offline modifications for 2004 Modifications to physics streaming: Bhabha stream: keep only subset of radiative events Reduces Bhabha stream volume by 4 Reduces overall stream volume by >40% KSKL stream: clean up choice of tags to retain Reduces KSKL stream volume by 35% K+K- stream: new tag using dE/dx Fully incorporate dE/dx code into reconstruction Eliminate older tags, will reduce stream volume Random trigger as source of MC background for 2004 20 Hz of random triggers synched with beam crossing allows background simulation for L up to 21032 cm-2s-1 KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Conclusions First pass at new MC production finished Culmination of ~1 year of effort! 700M events produced Comprehensive upgrades, background from data, DST’s Continuing effort: new upgrades nearly ready to go Lots of new production requests to fulfill (180M events) Ready to take data at 10 pb-1/day in 2004 CPU situation looking good Tape storage more critical, new library is definitive solution Work in progress for 2004: Modifications to background filter and physics streaming New source of background triggers for MC events KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Additional information KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

KLOE computing resources DB2 server IBM F50 4×PPC604e 166 online farm 7 IBM H50 4×PPC604e 332 1.4 TB SSA disk AFS cell 2 IBM H70 4×RS64-III 340 1.7 TB SSA + 0.5 TB FC disk 100 Mbps 1 Gbps CISCO Catalyst 6000 nfs afs offline farm 19 IBM B80 4×POWER3 375 8 Sun E450 4×UltraSPARC-II 400 analysis farm 4 IBM B80 4×POWER3 375 2 Sun E450 4×UltraSPARC-II 400 nfs file servers 2 IBM H80 6×RS64-III 500 nfs managed disk space 0.8 TB SSA: offline staging 6.5 TB 2.2 TB SSA + 3.5 TB FC: latent disk cache tape library IBM 3494, 5400 60GB slots, 2 robots, TSM 324 TB 12 Magstar E1A drives, 14 MB/sec each KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Offline hardware upgrades in 2003 12 upgrade kits for Magstar drives in tape library 40  60 GB/cartridge Total capacity 208  312 TB (5200 cartridges installed) 3.5 TB FiberChannel disk space for DST-access cache Total capacity 2.2  5.7 TB 0.5 TB FiberChannel disk space for AFS cell (analysis) Total capacity  1.7 2.3 TB 2 GB RAM for DB2 server (run/file database) KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Reconstruction and DST production KSKL rad Bha K+K- rp Reconstruction and streaming 25% MB/CR filter 40% raw EmC recon DC recon event classification 180 GB/pb-1 4 ms 40 ms 100 GB/pb-1 DST production event selection compr specific algorithms Examples: KSKL 20 GB/pb-1 12 ms 3 GB/pb-1 K+K- 12 GB/pb-1 115 ms 4.5 GB/pb-1 KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

As of May, entire data set (450 pb-1) available as DST’s Data-summary tapes As of May, entire data set (450 pb-1) available as DST’s DST type Input size (GB) Output size (GB) CPU time (days) K+K- 5270 2070 50 KSKL 8900 1350 15 Neutral radiative 2920 130 10 Charged radiative 640 rp (80 pb-1) 250 60 1 Total space: 4.3 TB MC DST’s add ~1.6 TB DST disk cache: 5.7 TB Majority of DST’s disk-accessed KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

DST’s for K+K- stream DST’s for K+K- events newly available in early 2003 K+K- events completely re-reconstructed for DST’s Dedicated energy-loss treatment (m = mK) in track fit Contribution from correlated multiple-scattering errors included in evaluation of error matrix for track parameters Improved merging of split kaon tracks Dedicated algorithm for global t0 determination Kaon time-of-flight corrections to drift distances dE/dx reconstruction from DC ADC’s introduced KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC upgrades: event generators New f decay/ISR generator Effective s sampled before f decay channel chosen f BR’s from KLOE cross-section measurements vs. s KL  KS regeneration updated Regeneration on Al in DC wall enabled Nuclear recoil treated, angular distributions modified wp0, hg, f0g, a0g generators updated a0 and f0 mass spectra from fits to KLOE 2000 data New generators for KS/KL  p+p-g and peng No cutoff at low Eg KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC upgrades: detector simulation DC Geometry revised Realistic wire sags from survey implemented New s-t relations from simulated cosmic rays Dead wire simulation (map a function of run number) EmC g’s from p+p-p0 events in data used to calibrate: sampling fraction energy response and resolution time response and resolution position dependence of above Dead zones at module interfaces simulated Fiber attenuation length variations in endcaps simulated Trigger Thresholds (in reconstructed EmC/DC hits) adjusted Thresholds a function of run number KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC upgrades: background simulation Background extracted from e+e-  gg events in data Sampled evenly as a function of integrated luminosity Each background event inserted in fixed number of MC events Inserted background has same temporal profile as in data Complete simulation of background in physical event All DC hits inserted (including tracklets, etc.) All EmC clusters inserted (except gg clusters) Background hits inserted with timing relative to t0 preserved e+e-  gg event selection criteria 2 clusters on barrel with |t - R/c| < 5st, E > 350 MeV Etot > 800 MeV, Df - 180° < 1°, Dz < 10 cm One background file per raw data file: 77,000 files, 8 GB total KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

Isolation of background clusters Background clusters must be > 100 cm from gg clusters Event-weighting technique cleans up residual contamination from cluster fragments and ggg events Purity of in-time background cluster selection: In-time clusters selected as background Out-of-time clusters in data Rates for dN/dE dN/d(cos q) Multiplicity MeV KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC-data comparison: tracking Efficiency: p from KS  p+p- Resolution: M(KS  p+p-) New Old New Data edata/eMC log scale Old pz (MeV) New detail of radiative tail edata/eMC Old pz (MeV) M (MeV) KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

2004 CPU estimate: details Extrapolated from 2002 data with some MC input 2002 L = 36 mb-1/s T3 = 1560 Hz 345 Hz f + Bhabha 680 Hz unvetoed CR 535 Hz bkg 2004 L = 100 mb-1/s (assumed) T3 = 2175 Hz 960 Hz f + Bhabha 535 Hz bkg (assumed constant) From MC: sf = 3.1 mb (assumed) f + Bhabha trigger: s = 9.6 mb f + Bhabha FILFO: s = 8.9 mb CPU(f + Bhabha) = 61 ms avg. CPU time calculation: 4.25 ms to process any event + 13.6 ms for 60% of bkg evts + 61 ms for 93% of f + Bha evts 2002: 19.6 ms/evt overall – OK 2004: 31.3 ms/evt overall (10%) KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

2004 tape space estimate: details 2001: 274 GB/pb-1 2002: 118 GB/pb-1 Highly dependent on luminosity 2004: Estimate a priori Assume: 2175 Hz @ 2.6 KB/evt Raw event size assumed same for all events (has varied very little with background over KLOE history) Assume: L = 100 mb-1/s 1 pb-1 = 104 s: 25.0 GB for 9.6M physics evts 31.7 GB for 12.2M bkg evts (1215 Hz of bkg for 104 s) 56.7 GB/pb-1 total Include effects of streaming changes: raw recon Stream 2001-2002 GB/pb-1 2004 K+K- 11.6 KSKL 19.7 12.8 rp 3.3 radiative 6.4 Bhabha 56.0 14.0 other 0.8 Total 98 49 Assumes 1.7M evt/pb-1 produced f  all (1:5) and f  KSKL (1:1) MC KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003

MC production: known problems Problems concerning generation: s(e+e-  f) vs. s constant for 2001 f  all simulation s(e+e-  wp0) vs. s resonant for 2002 f  all simulation BR(f  a0g) 10 actual value BR(f  f0g, a0g) from resonance shape for KSKL p and n reversed in KS  pen generator Bug in h  p+p-g generator Problems concerning reconstruction: Dead wires dropped after (not before) DC trigger emulation Error in s-t relations used for DC reconstruction Problems concerning DST’s: Used standard (not dedicated) MB filter for rad DST’s KLOE offline & computing: Status report – M. Moulson, LNF Scientific Committee, 2 Dec 2003