Hand Signals for Crane Operations.

Slides:



Advertisements
Similar presentations
35 FOOT LADDER 3 PERSON.
Advertisements

Working Around/Under Loads
Tower Crane Safety Regulations
My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
2 Star Field Craft Lesson 5
Strength Training Circuit (Station Slides) To assist with the conduct of the Strength Training Circuit, print off these slides and place them in page protectors.
Introduction to Anatomy
Hand and Arm Signals All signals used on the patrol must be planned and rehearsed Signals may include: lift or shift supporting fire, to start an assault,
EXERCISE 1: Lift and Carry
Thanks to the staff and team of highly motivated young men at the Iowa State Training School for demonstrating this drill and making a great instructional.
EXERCISE 1: High Jumper STARTING POSITION: Regular stance, knees slightly bent, body bent forward at waist, arms pointing to rear. Fingers and thumbs extended.
Use Visual Signaling Techniques
Stretches for the Back Expected Results: Reduce fatigue and improve back comfort. Reverse the Curve: (for back and hips) While standing upright with feet.
Cast A Fly... Catch A Student. 11 STEPS TO THE BASIC FLY CAST Cast Setup 1.Stance 2.3 rod lengths 3.Grip 4.Line on finger 5.Elbow set 6.Wrist in line.
Welcome to Swinburne Online! You are an integral part of our team and we want to ensure that whilst working from home your safety is our Number 1 priority.
By: Mr. Knapp. Posture  Posture includes 3 categories: upper body alignment ○ head, shoulders, chest, back, and hips lower body ○ hips, legs and feet.
EQUIPMENT SPOTTER TRAINING
Crane Operations Objective
Crane Safety, Subpart N
Cranes, Hoists and Truck Hoists
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Stretches for the Back Expected Results Reduce fatigue and improve back comfort. Reverse the Curve (for back and hips) While standing upright with feet.
Basic maneuvers.
Elkhorn Construction Inc.
Traffic Control Officer for Civilians 15.0
EXERCISES By: Fabio Pawlus. Pull-ups Grab the pull-up bar with the palms facing forward using the prescribed grip. Note on grips: For a wide grip, your.
Special Event Traffic Control Presented by Moraga Police Department.
Mn/DOT District 3 Presents… Flexibility Exercises
NFHS – NCAA – USAV Signal Comparison. NFHS drawings & descriptions © 2008 are used with permission of Becky Oakes, NFHS Volleyball Rules Editor. NFHS.
Used with permission of NFHS. Copyright All drawings and descriptions are copyrighted property of the National Federation of State High School Associations,
Safety on Call STRETCHING. Safety on Call 1.Poor posture 2.Poor physical condition 3.Improper body mechanics 4.Incorrect lifting 5.Extra abdominal weight.
NFHS – NCAA – USAV Signal Comparison NFHS drawings & descriptions © 2011 are used with permission of Becky Oakes, NFHS Volleyball Rules Editor.
SJ YESTERDAY: The thumb of the Y-hand shape starts at the chin and moves back along the cheek YESTERDAY: The thumb of the Y-hand shape starts at the chin.
SIGNAL PRESENTATION.
10 steps to Safe Lifting.
RIGGING COMMUNICATION Industry Fundamentals and Occupational Safety Unit 6.
TAKEOFF OBJECTIVES l Create a high takeoff angle with as little speed loss as possible. l Takeoff from a point which is most efficient for the individual.
The following activities utilize basic skills in a variety of easy to manage lead up games. The emphasis is on participation and having fun.
Outline of Crane Operator Training For BMRC Labournet.
Intro to Material Handling
Terms and Definitions • Abduction – away from the center (midline) of the body • Active-assistive ROM – The nurse assistant assists the resident in performing.
Stretch your back Ing. Lenka Slezáková.
Presented by HealthLinks
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Topic 1.7 Aircraft Salvage Procedures
Automotive Engines Theory and Servicing
Workplace Stretching Program
AIRCRAFT MAINTENANCE TOWING OF AIRCRAFT.
Working Around/Under Loads
1. Warmup: Active Warmup Description: Stretches while moving up and down the basketball court. Time intensity: Slow, just to get the blood flowing. Rest:
Team Handball Cue Cards.
PASSING LANE CHANGING MERGING SHARING THE ROAD
Lifting & Rigging Continuing Education Fourth Quarter 2016
BEST WORKOUT PLANS FOR MEN
By: Ryan Ayres And Tony Nguyen
VEHICLE LIFTING AND HOISTING
SAFE WORK INSTRUCTIONS
Limit Switches What are some different types of limit switches?
Evacuation Chair Safety Training
Ground Guide Procedures. Ground Guide Procedures.
PASSING LANE CHANGING MERGING SHARING THE ROAD
Pictured: Imagine Young Marines
Station Ideas Print and laminate these stations or create your own based on your school’s equipment and students’ needs.
SAFE WORK INSTRUCTIONS
Cast A Fly Catch A Student
The following slide show presentation is copied from the book
Texas Association of Sports Officials
Automotive Engines Theory and Servicing
Crane Signalperson Hand Signals
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

Hand Signals for Crane Operations

Hand Signals

Mobile Crane Communications ANSI B30.5 Hand Signals Standard Hand Signals Who ever is in charge of any crane or hoist operations using any crane or hoist must ensure that a competent, qualified signal person is assigned to work with the crane for as long as it is working within their area of responsibility.

Standard Hand Signals The code of federal regulations OSHA CFR Part 1926.550 and the American National Standards Institute (ANSI B30.5) Mobile Crane, Crawler And Locomotive Crane Standards requires that a signalperson be present at all times whenever: The crane is working within a boom’s length of power lines. The operator cannot clearly see the load block/hook and the load at all times. The crane is being backed up or moved and the operator cannot see all parts of the crane and its intended path of travel.

Signal Person Requirements The signalperson assigned to the crane shall: Be positioned in full view of the operator and if using hand signals close enough for the signals to be seen clearly. The signal persons position must give him/her a full view of the load and equipment at all times without creating a hazard of being struck by the crane and/or load. The signalperson must be qualified with the crane and lifting operation. Responsible for the public and all (unauthorized personnel outside of the crane’s operating radius). Direct the load so that it never passes over anyone.

Signal Person Requirements Be in constant communication with the operator at all times with either the standard hand signals as required in accordance with ANSI B30.5 or by direct radio communication. Hand signals should only be used when the distance between the operator and the signalperson is not great and atmospheric conditions allow for clear visibility.

Crane Operation Procedures Crane operator practices: The crane operator Shall Not engage in any practices that will divert attention while actually engaged in operating the crane. The operator Shall Not engage in the operation of the equipment when physically or mentally unfit. The operator Shall respond to signals given by a designated signalperson only. The operator Shall obey a stop/emergency stop signal at any time, no matter who gives it,

Crane Operation Procedures Crane operator practices: The crane operator Shall be responsible for those operations under the operator’s direct control. Whenever there is any doubt as to the safety, the operator Shall have the authority to stop and refuse to handle loads until safety has been assured. If it is desired to give instructions to the operator, other than those provided by the established signal system, the crane operator Shall Stop all crane motions.

ANSI B30.5 - Hand Signals ANSI B30.5 Standard Hand Signals: Standard hand signals to the operator shall be in accordance with the standards that are prescribed in ANSI B30.5-3.3.2, unless voice communication equipment (telephone, radio, or equivalent) are utilized. Signals shall be Discernible or audible at all times. No response shall be made unless signals are clearly understood.

Two-Way Radio Communication It is strongly recommended that 2-way radios be used on all craning operations where the signaling is required. There are far too many accidents that result from misunderstood or misinterpreted hand signals and all could have been avoided by using voice communication. The signalperson must constantly talk to the operator at all times during loading operations. If for any reason the signalperson stops talking the operator must stop the operation. Adequate lighting arrangements and radio communications must be provided for all night operations.

ANSI B30.5 – Hand Signal Chart Hand signals shall be post on the equipment or conspicuously at the jobsite.

Hand Signals Signalperson: Signals shall be Discernible or audible at all times. No response shall be made unless signals are clearly understood.

Hand Signals - Hoist Hoist/Raise the Load: With the forearm vertical, forefinger pointing up, move hand in small horizontal circle.

Hand Signals - Lower Lower: With the arm extended downward, forefinger pointing down move hand in small horizontal circle

Hand Signals – Main Hoist Use Main Hoist: Tap fist on top of head then use regular signals.

Hand Signals – Whip-line Use Whip-Line: (Auxiliary Hoist) Tap elbow with one hand, then use regular signals.

Hand Signals – Raise Boom Raise Boom: Arm extended fingers closed with thumb pointing upward.

Hand Signals – Lower Boom Lower Boom: Arm extended fingers closed with thumb pointing downward.

Hand Signals – Move Slowly Move Slowly: Use one hand to give any motion signal and place the other hand motionless in front of hand giving the motion signal (Hoist slowly shown as example).

Hand Signals – Raise Boom & Lower the Load Raise the Boom & Lower the Load: With arm extended, thumb pointing up, flex fingers in and out as long as load movement is desired.

Hand Signals – Lower the Boom & Raise the Load Lower the Boom & Raise the Load: With arm extended, thumb pointing down, flex fingers in and out as long as load movement is desired.

Hand Signals - Swing Swing: Arm extended, point with finger in direction of swing of boom.

Safety Consulting, SOP Hand Signals - Stop Stop: Arm extended, palm down, move arm back and forth horizontally.

Hand Signals – Emergency Stop Safety Consulting, SOP Hand Signals – Emergency Stop Emergency Stop: Both arms extended, palms down, move arms back and forth horizontally.

Safety Consulting, SOP Hand Signals - Travel Travel: Arm extended forward hand open and slightly raised make a pushing motion in direction of travel

Hand Signals Dog Everything Safety Consulting, SOP Hand Signals Dog Everything Dog Everything: Clasp hands in front of body.

Hand Signals – Travel Both Tracks Safety Consulting, SOP Hand Signals – Travel Both Tracks Travel Both Tracks: Use both fists in front of body, making a circular motion about each other, indicating direction of travel, forward or backward. (For land cranes only)

Hand Signals – Travel One Track Safety Consulting, SOP Hand Signals – Travel One Track Travel One Track: Lock the track on side indicated by raising fist. Travel opposite direction indicated by circular motion of other fist, rotated vertically in front of body. (For land cranes only)

Hand Signals – Extend Boom Safety Consulting, SOP Hand Signals – Extend Boom Extend Boom: (Hydraulic cranes) Both fists in front of body with thumbs pointing outward.

Hand Signals – Retract Boom Safety Consulting, SOP Hand Signals – Retract Boom Retract Boom: (Hydraulic cranes) Both fists in front of body with thumbs pointing towards each other.

Hand Signals – Extend Boom One Hand Safety Consulting, SOP Extend Boom – One Hand Signal: (Hydraulic cranes) One fist in front of chest with thumb tapping on chest.

Hand Signals – Retract Boom One Hand Safety Consulting, SOP Retract Boom – One Hand Signal: (Hydraulic cranes) One fist in front of chest with thumb pointing outward and heel of fist tapping on chest.

Hand Signals – Special Hand Signals ANSI B30.5-3.3.3 Special Signals: Safety Consulting, SOP ANSI B30.5-3.3.3 Special Signals: For operations not covered by ANSI B30.5-3.3.2, or for special conditions that occur from time to time, additions to or modifications of the standard signals may be required. In all such cases, these special signals shall be agreed upon in advance by both the operator and the signalperson, and should not be in conflict with the standard signals.

Audible Travel Signals Safety Consulting, SOP Audible Travel Signals ANSI B30.5-3.3.4 Audible Travel Signals: When moving the vehicle, the following signals shall be used; STOP One Audible Signal GO AHEAD Two Audible Signals BACK-UP Three Audible Signals

Hand Signals – Special Hand Signals ANSI B30.5-3.3.5 Instructions: Safety Consulting, SOP ANSI B30.5-3.3.5 Instructions: If it is desired to give instructions to the crane operator, other than those provided by the established signal system, the crane motions shall be stopped.

Hand Signals - Test 1. Identify this hand signal? Travel One Track Safety Consulting, SOP Hand Signals - Test 1. Identify this hand signal? Travel One Track Travel Both Tracks Dog Everything Stop

Hand Signals - Test 2. Identify this hand signal? Stop Move Slowly Safety Consulting, SOP Hand Signals - Test 2. Identify this hand signal? Stop Move Slowly Dog Everything Emergency Stop

Hand Signals - Test 3. Identify this hand signal? Extend Boom Safety Consulting, SOP Hand Signals - Test 3. Identify this hand signal? Extend Boom Raise Boom Retract Boom Travel To Me

Hand Signals - Test 4. Identify this hand signal? Safety Consulting, SOP Hand Signals - Test 4. Identify this hand signal? Raise Boom Lower Load Raise Boom Slowly Lower The Boom And Raise The Load None Of The Above

Hand Signals - Test 5. Identify this hand signal? Travel Forward Safety Consulting, SOP Hand Signals - Test 5. Identify this hand signal? Travel Forward Travel One Track Travel Both Tracks None Of The Above

Hand Signals - Test 6. Identify this hand signal? Raise Boom Safety Consulting, SOP Hand Signals - Test 6. Identify this hand signal? Raise Boom Extend Boom Retract Boom None Of The Above

Hand Signals - Test 7. Identify this hand signal? Raise Boom Slowly Safety Consulting, SOP Hand Signals - Test 7. Identify this hand signal? Raise Boom Slowly Hoist Slowly Swing Slowly None Of The Above

Hand Signals - Test 9. Identify this hand signal? Raise Boom Slowly Safety Consulting, SOP Hand Signals - Test 9. Identify this hand signal? Raise Boom Slowly Use Main Hoist Use Auxiliary Hoist Dog Everything

Hand Signals - Test 10. Identify this hand signal? Use Auxiliary Hoist Safety Consulting, SOP Hand Signals - Test 10. Identify this hand signal? Use Auxiliary Hoist Swing Left Travel One Track Dog Everything

Safety Consulting, SOP Hand Signals - Test 11. The operator will only respond to signals only from:? Designated Signalperson Qualified Signalperson Experienced Signalperson All Of The Above

Safety Consulting, SOP Hand Signals - Test 12. All mobile cranes must meet or exceed what ANSI crane standard for personnel lifting? ANSI B30.2 ANSI B30.8 ANSI B30.5 None Of The Above

Questions? Test Time!! Construction Safety & Risk Consulting