Step 4: Sketch the stakeholder-network

Slides:



Advertisements
Similar presentations
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Advertisements

Buying Better Outcomes Workshop 4 Equalities and Contract Management If you do not take it seriously, why should the supplier?
Coordinate implementation of customer service strategies Lecture 2 Payman Shafiee.
Supply Chain Operations: Planning and Sourcing
IMS1805 Systems Analysis Topic 3 (revisited and continued): Doing analysis – a ‘soft’ systems perspective.
Logic Modeling for Success Dr Kathryn Wehrmann Illinois State University.
Chapter 1 Accounting Information Systems: An Overview Copyright © 2012 Pearson Education 1-1.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
The Information Systems Planning Process
Accounting Information Systems: An Overview
Buying Better Outcomes Workshop 3 Equalities, Procurement and Corporate aims.
The BIM Project Execution Planning Procedure
What is Business Analysis Planning & Monitoring?
1 Next Generation ISO Susan LK Briggs Presented to EFCOG/DOE EMS Implementation, Lessons Learned & Best Practices Training Workshop, 3/05.
Topics → Business strategy must set goals → Partners selection → Criteria for selecting partners → Structure must maximize cooperation → Incentives for.
2011 PK Mwangi Global Consulting Forming a Strategy for your Business. Strategy refers to the plan that needs to be put in place to assist the business.
Chapter 1 Accounting Information Systems: An Overview Copyright © 2012 Pearson Education 1-1.
Chapter 1 Accounting Information Systems: An Overview Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 1-1.
Chapter 1 Accounting Information Systems: An Overview Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 1-1.
Revising priorities in the statistical programme Management Group on Statistical Cooperation * 24 & 25 March 2011 * Carina Fransen.
The 7 th CIRP IPSS Conference May 2015 Saint-Etienne, France by Daniela C. A. Pigosso and Tim C. McAloone Presenting Author: Daniela C. A. Pigosso.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
1Meeting, location, date Implementation of EC Good Practice Guidance for Billing ERGEG Status Review Ulrike Zeilinger, Project Leader ERGEG Customer Empowerment.
DEVELOPING THE WORK PLAN
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Famosa S.A. Full Speed Supply Chain Jorge León Bello__Master GEPS.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
INTRODUCTION: The objective of this lesson is to acquaint learners with the roles of the ‘STAKEHOLDERS’ in the business environment. The typical high street.
Teaching material by: Tim McAloone, DTU Niki Bey, IPU Environmental improvement through product development Step 1: Describe the use context.
Teaching material by: Tim McAloone, DTU Niki Bey, IPU Environmental improvement through product development Ensuring implementation in the company.
Teaching material by: Tim McAloone, DTU Niki Bey, IPU Environmental improvement through product development Step 5: Quantify the environmental impacts.
Teaching material by: Tim McAloone, DTU Niki Bey, IPU Environmental improvement through product development Step 7: Develop an environmental strategy.
IW:LEARN TDA/SAP Training Course Module 3: Developing the SAP.
LEARNINGS FROM PASC WORK SHOP 2015 “SERVICE STANDARDIZATION ”
Information Technology Planning
The Human Side of Project Management
Chapter 3 ORGANIZATIONAL CULTURE AND ENVIRONMENT: THE CONSTRAINTS
Country, Date, Presenter
ENVIRONMENTALLY RESPONSIBILITY
Forming a Strategy for your Business.
BUSINESS PLUG-IN B15 Project Management.
Just What Are Processes, Anyway?
Chapter 3 Supply Chain Drivers and Obstacles
GENDER TOOLS FOR ENERGY PROJECTS Module 2 Unit 2
Environmental improvement through product development Introduction
Chapter 3 Supply Chain Drivers and Obstacles
Step 6: Create environmental concepts
The Systems Engineering Context
IEMA Workshop - Application of Life-Cycle Thinking in ISO 14001
Outline What is Literature Review? Purpose of Literature Review
Module 1 Assemble the WSP team
Business Environment Dr. Aravind Banakar –
Business Environment Dr. Aravind Banakar –
Business Environment
Business Environment
Business Environment
Business Environment
THE BUSINESS ANALYSIS PROCESS MODEL
ISO 14001:2015 Revision Explaining the Key Changes
Environmental improvement through product development Step 2: Create an overview of the environmental impacts.
Production The Purpose of Manufacturing and
Evaluation of the marketing standards framework for fishery and aquaculture products Presentation to the Market Advisory Council 23 May 2018 Brussels.
D-Lab Fall 2004.
Project Management Process Groups
Product Stewardship Policy
Purchasing and Supply Chain Management
Why should the public sector want to innovate?
Chapter 3 Supply Chain Drivers and Obstacles
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
Steps for Ethical Analysis
Presentation transcript:

Environmental improvement through product development Step 4: Sketch the stakeholder-network

Step 4: Sketch the stakeholder-network BACKGROUND Most environmental efforts in companies focus only on the product or technology aspects But these efforts are based on a large series of assumptions about the product’s use, users and other stakeholders Therefore we identify the various stakeholders who are significant for the product’s environmental effects in its lifetime Classic environmental efforts in companies take their point of departure in a product or a technology, directing special attention towards the improvement of the product’s life cycle performance. A weakness of this approach, is that it is built on a large series of assumptions, because there would otherwise be too many uncertainties to be able to make plausible assessment of the product’s environmental ‘goodness’. It is therefore important to identify the various stakeholders who are connected to a particular set of activities within which the product plays a role.

Step 4: Sketch the stakeholder-network BACKGROUND Environmental impacts often occur in the exchanges between stakeholders – the so-called “stakeholder-network” Consists of several types of stakeholder: manufacturing company component supplier external designer freight forwarder authorities etc. In this exercise we sketch the stakeholder-network for the product, to give insight into which stakeholders influence certain environmental impacts. We will map information exchanges, material flows and the resulting environmental impacts. Environmental impacts often occur in the exchanges between stakeholders, e.g. in negotiations along the supply chain and/or as a result of lack of overview of the roles and responsibilities in the product’s so-called stakeholder-network. A stakeholder-network consists of several types of stakeholder, for example, the manufacturing company, a component supplier, an external designer, a freight forwarder, the authorities, customers, users, a disposal company, and so on. To supplement our understanding of the product's environmental impacts, it is important to sketch the stakeholder-network for the product. Sketching the stakeholder-network gives an insight into which stakeholders influence certain environmental impacts. To clarify the relationship between stakeholders and the impacts that occur, one can outline information exchanges, material flows and the resulting environmental impacts.

Step 4: Sketch the stakeholder-network STEP-BY-STEP APPROACH

Step 4: Sketch the stakeholder-network STEP-BY-STEP APPROACH Choose 5 environmental ‘*’ priorities!

Case example Identification of environmental impacts through the stakeholder-network exercise at Coloplast A/S Coloplast places a large emphasis on the environment throughout the product life cycle. Since Coloplast’s products are medical devices, environmental considerations must share first place with safety and hygiene. Furthermore Coloplast’s products are not very environmentally burdening in the actual use stage, seen in relation to the rest of the product life cycle. Coloplast benefitted greatly from the stakeholder-network game, gaining new insights into environmental prioritisation during the development, use and disposal of an ostomy bag. Example of stakeholder-network at Coloplast, where important environmental impacts have been prioritised, using ‘*’.

Step 4: Sketch the stakeholder-network

Step 4: Sketch the stakeholder-network WHY CARRY OUT THIS EXERCISE? To create an overview of environmental problems’ root causes and improvement potentials To identify, which stakeholders should be considered in connection with environmental improvements …or alternatively, which stakeholders should by no means be involved in the environmental task! “The stakeholder-network exercise gave a good overview of the many stakeholders that we are dealing with. The graphical exercise was good for us to identify not only environmental impacts, but also their initiators. The exercise could not, however, have been carried out in isolation; it was a natural consequence of the previous exercises, which were necessary for us to create an overview of the product's actual environmental impacts.” [Helle Nystrup, Grundfos Management A/S] The point of the stakeholder-network exercise is to create an overview of environmental problems’ root causes and improvement potentials. By creating an overview of which stakeholders are connected to the product throughout its life cycle it becomes apparent, which stakeholders should be considered in connection with environmental improvements – or alternatively, which stakeholders should by no means be involved in the environmental task, thus ensuring relevant and likely environmental improvements.

For further information Tim McAloone DTU Management Engineering Engineering Design and Product Development Building 426, Produktionstorvet, DK-2800 Kgs. Lyngby Denmark Telephone (+45) 4525 6270 Homepage www.kp.man.dtu.dk/english/research/areas/ecodesign/guide Email tmca@man.dtu.dk