LASA Laboratorio Acceleratori Superconduttività Applicata

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Status of CEPC Detector magnet
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
WP10 Task 4 Test Station Kickoff meeting Giovanni Volpini, CERN 11 June 2015 Test Station Kick-off meeting v. 10 June 2015.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
Sextupole Single Coil Test Results Giovanni Volpini on behalf of the LASA Team Giovanni Volpini, CERN, 22 April 2015.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
S A Griffiths CM42 June 2015 Electrical & Control.
Results from the cold test of the first QD0 prototype
Final Design Cryogenic and mechanical configurations
Instrumentation for status monitoring of SST-1 superconducting magnets
Installation of the T600 at Fermilab
Status of the PANDA Solenoid Magnet Production in BINP
CBM magnet overview of the BINP work
Final doublet: future activity plan
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
MQXC Nb-Ti 120mm 120T/m 2m models
HL-LHC IT STRING and Series test of SC link
11T Magnet Test Plan Guram Chlachidze
at STFC Daresbury laboratory
HFM Test Station Main Cryostat
Uppsala Commitment to ESS and FREIA Planning
The CMS magnet superconducting coil
EPFL-SPC, 5232 Villigen PSI, Switzerland
R&D of neutrino beam production for future (Multi-)MW proton facility:
Powering the LHC Magnets
HO Corrector Magnets: decapole test and future plans
Test plan of ESS HB elliptical cavity
Status of the PANDA Solenoid Magnet Production in BINP
TEST PLANS for HL LHC IT STRING
High Magnetic Field Lab, CAS
Updated concept of the CBM dipole magnet
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Thermohydraulic behaviour of the cryogenic system
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
News from the FNAL test facility
Review Bloc 4 and SM18 facilities and upgrade
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

LASA Laboratorio Acceleratori Superconduttività Applicata Francesco Broggi francesco.broggi@mi.infn.it francesco.broggi@cern.ch 1st International WORKSHOP of the Superconducting Magnets Test Stands

Infrastructure and people Founded in 1987 for the Superconducting Cyclotron K800 construction, actually in operation at LNS Catania. People: about 40 persons (3 experienced researchers and 5 experienced technicians directly involved in the magnet activities) Infrastructure: Experimental area 2000 m2, with a 50 t crane. Helium liquefier: 40 l/h LN distribution (10000 l dewar) Installed electrical power: 1.6 MVA 1 Gbit/s LAN Ultra High purity water plant (18 MΩ cm) Machine workshop Class II Radiochemistry Lab. Physical measurements Lab. (a, b, g spectroscopy ) Bunker for RF superconductive cavity tests with 700 mm diameter , 4500 mm height cryostat Low temperature (>2K) Mechanical Measurements Lab

Experimental area Ultra Pure water Production Neutron Test Area Clean room class 100 & HPR High Field Solenoids Control room for high field test Superconducting cavity Test Area Helium gas recovery High current power supply

Control room Power supplies SOLEMI-1 8 T x D535 mm warm bore SOLEMI 2-3 15 T x D100 mm cold bore Power supplies

The long prototypes of the LHC dipoles INFN has collaborated with CERN since 1990, funding and following the construction in the Italian industries of the first two 10-m-long dipole prototypes. Their excellent performances paved the way to the LHC project approval in 1994.

B0 is a shorter (9x5 instead of 25x5 m) working model of one of the eight coils compsing the Barrel Toroid It exploits the same technologies of the final BT magnet Most components, conductor DP winding & impregnation, radiation screen, vacuum vessel, were financed under Italian Govt’s “5%” funding program and followed by LASA CEA-Saclay contributed with design, coil casing, minor components & overall assembly B0 magnet Construction began in 1998 Delivered on Oct 00 at CERN First Cool down started on Jun 01 Nominal operational current, 20.5 kA, achieved on Jul 01

Designed and commissioned at LASA to test B0’s Tie-Rods upto 260 tons ATLAS Tie-Rod test apparatus Designed and commissioned at LASA to test B0’s Tie-Rods upto 260 tons

The superconducting toroidal magnets of the ATLAS detector INFN was co-responsible, together with CEA, of the construction of the Barrel Toroidal Magnet of ATLAS. Full responsibility on 1/4 of the superconducting cable (EM Fornaci di Barga), of the superconducting coils (ASG Genova), of the thermal screens (Ettore Zanon, Schio), of the dump and protection system of the magnet.

The SIS-300 pulsed dipole An Italian collaboration (GE+LASA+LNF) performed the design, development, construction and test of the first model of the FAIR SIS300 superconducting fast-cycled dipoles. 4.5 T x 100 mm bore; (LHC: 8.3 T x 57 mm) 1 T/s; (LHC: 0.007 T/s) @ LASA -> EM design (with GE), loss computation; -> low-loss superconduting cable development ; -> magnet test.

The Magnet Cold Mass

DISCORAP In July 2012 at LASA the test on the first «fast cycled» magnet for FAIR SIS-300 have been performed

Vertical cryostat connected to the bus bar

DISCORAP Vertical cryostat Free ID 697 mm Max operating pressure 4.5 bar Thermal shield cooled by LN or evaporated GHe DUT max lenght 5 m max weight 10 ton

MAGIX In February 2016 the first of the five prototypes of the super-ferric magnet for MAGIX have been succesfully tested. (in the photo an assembly phase)

High Magnetic Field Laboratory The High Magnetic Field Laboratory has the capability to provide magnetic field for research purposes, and to develop and test magnet prototypes Research Magnets SOLEMI 1 solenoid NbTi, 8 T, 535 mm room temperature bore SOLEMI 2+3 solenoid Nb3Sn, 15 T, 100 mm cold bore 75 mm cold bore in gas flow 2-300 K Solenoid NbTi + Nb3Sn, 13.5 T, 50 mm cold bore@ 4.2/2.2 K Cryocooler-operated magnet 8 T, 75 mm cold bore cryogen-free Resistive Dipole 1 T, 120 mm room temperature gap Ancillary equipment & Prototype development tooling Power supply up 30 kA 6V (swicthing) “ 2 kA 4V (low noise, battery based) Winding machine Oven up to 700 °C in vacuum (Nb3Sn reaction) Oven up to 900 °C in atmosphere (HTSC reaction) Next slide the details

High Magnetic Field Laboratory Vertical Test Station Can accomodate magnets up to 700 mm dia x 6500 mm in length Soon to be integrated by a 515 mm dia x 3300 mm vertical cryostat for medium-size magnets/samples 480 mm dia x 1200 mm, and other smaller cryostat Power Supplies 3 x Power supply up to 10 kA, 6 V (series and parallel operation possible) 2 x Power supply up to 1.2 kA, 36 V 1 x Power supply up to 500 A, 125 V 1 x Power supply up to 2 kA, 4V (low noise, battery based) Magnet Protection System including discharge resistor, switch, Quench Detection Electronics

SOLEMI 1 magnet SOLEMI with sample holder into its bore

MAGIX Cryostat D515 x L 3000 mm D515 Maximum LHe level 2300 mm Now being manufacture Hosted within DISCORAP cryostat (which acts as a support) Designed for 4K operation Study for lower temperature operation, 1.9K or 2.2 K in progress D515 3000

Cryo-Mechanical Lab Goal: perform room temperature and cryogenic (down to 2K) mechanical test, both in quasistatic and cyclic conditions. Commercial test machines have been fitted with home-designed cryostats. Tensile and compression tests on INSTRON testing machine, model 6027. max load, tension 100 kN max load, compression 50 kN temperature range 3 – 300 K ( flow of helium gas ) Tests in cyclic conditions on MTS testing machine load +/- 125 kN temp. range 2-300 K

Control & Data Acquisition Architecture 1. QDS (MSS Magnet Safety System) Initiates a fast discharge or switches off the power supply incase some voltage thresholds on the magnet or on its electrical connection are exceeded. Includes a capacitor bank for firing quench heaters. 2. Current Control & Slow Acquisition Two different functions, implemented in the same hardware & software system. Slow acquisition monitors and records most important data (temperatures, current, voltage along critical items) from the cooldown to the operation. Data are avalilable to the operator and recorded at about 1 Hz. 3. Fast Acquisition Records voltages across the magnet under test with 1 kHz sampling frequence, in coincidence with a fast discharge 4. V*I AC losses measurement system A dedicated system which measures the AC losses by numerical integration of V*I product, measured by a couple of synchronized VMM. It is completely independent from other systems, from the voltage taps on. This allows to perform checks, modification on the ground, etc. without affecting other safety-critical systems.

Quench Detection System A system similar to the POTAIM cards. Engineered and built at LASA, it has successfully tested in field conditions during the MAGIX test It includes: 16 channels (may be expanded), each: optoinsulated input, bridge/single end independently configurable Voltage thresholds: ±4V, ±1.25V, ±500mV, ±100mV Time validation ranges: 0-10 ms, 0-100 ms, 0-1 s Input signal made available in copy Memory of channels fired

Fast Acquisition

Slow Acquisition NI Compact Field Point

AC losses measurement system Net work Q performed by the power supply on the magnet between t0 and t1.