Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Managing Construction Risks
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
Transportation Curriculum Coordination Council (TCCC) Addressing Challenges in Construction and Maintenance Workforce and Quality.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
AASHTO Subcommittee on Construction
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
Graduate Certificates in Construction Management 2007 ALASKA ASPHALT PAVEMENT SUMMIT Dr. Robert A. Perkins, PE.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Standards of Practice Course
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Update of the National Highway Specifications Web Site Ken Jacoby Federal Highway Administration Office of Asset Management August 4, 2009 Chicago, IL.
Click on Next to continue Introductio n Inputs Tools and Techniques Outputs Next 12.2 Conduct Procurements: Introduction The process of obtaining seller.
Building Design & Construction 2006 Building Design & Construction 2006 David O’Hearn, P.E. Deputy Commissioner.
FHWA Perspective on Risk and Other Highlights. GROW AMERICA Proposal Administration’s Proposal 6 Years in length $317 billion for highways and bridges.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Using the AASHTO Audit Guide for the Development of A/E Consultant Indirect Cost Rates Introduction Target Audience Course Structure Learning Outcomes.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
FHWA Updates WASHTO Committee on Maintenance Cheyenne, Wyoming March 8, 2010 U.S. Department of Transportation Federal Highway Administration.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
New Directions in Auditing Construction and Public Works Projects Part 2 Beth Woodward, CGAP, CIA, CCA Senior Management Auditor Audit Services Division,
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Fermilab Environmental Management System (EMS) Senior Management Training Module FN000378/CR/01.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
PRINCE2 and the PMBoK guide
CONTRACT ADMINISTRATION
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
TechStambha PMP Certification Training
Designers’ Manual Appendix Contents
Environmental Health and Safety (EH&S) Supplier Awareness Training
Quality Assurance: Pay Factors and Dispute Resolution
OHS Staff Introduction Training
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
CIS12-3 IT Project Management
Design-Build Acquisition and Contract Incentives July 19, 2018
Relationship between World Bank and Romanian EA requirements
Cost Containment Working Group Board Update
Design-Build Acquisition and Contract Incentives May 9, 2019
What’s Happening with DCS?
SADC PPP Network PPPs in SADC
SHARE Special Project Enterprise Learning Management Pilot Project Planning/Implementation Certification December 17, 2014 Requesting Agency: Cassandra.
Presentation transcript:

Resident Engineer Training AASHTO Subcommittee on Construction 2010 Annual Meeting Burlington VT Ken Jacoby Federal Highway Administration Office of Asset Management

Background TCCC Study (2003) FHWA “Phase 1” Initiative (2009) 53% of states have no formal training for construction managers Provided information that could help states in developing academies Did not provide a curriculum of formal training FHWA “Phase 1” Initiative (2009) Follow-up to the TCCC Study Provided a recommended curriculum of courses for an academy.

Phase 1 – Curriculum Total of 9 subject areas Total of 38 courses within the 9 subject areas Subject Areas Technical Project Controls Safety & Legal Contract Administration Environmental Quality Assurance Third Party Coordination Considerations during Project Development Interpersonal & Leadership Skills

Subject Areas Technical Considerations during Project Development Grading Drainage Aggregate Inspection Geotechnical Construction New Structure Construction PCC Pavement Field Inspection Hot Mix Asphalt Field Inspection Asphalt Recycling Landscaping Considerations during Project Development Constructability reviews Value Engineering Construction involvement during design process (e.g. specification development) Environmental commitments Post construction meetings “Hand-off” from project development to construction Project review prior to construction Life cycle cost (LCC) analysis and LCC management Alternative technical bids Provide management level information on calculation checks, payment approvals, managing contract changes, reviewing inspection reports, measurements, and test results, and plan/manage next steps for the most common technical areas. Techniques in dealing with common issues that arise in the technical areas Hot topics or current issues that State DOTs are dealing with in the technical areas. (e.g. GPS grading, resilient modulus testing) Impact of technical changes on other dependencies (e.g. Schedule delay occurring due to change in aggregate inspection method) Refresher on technical areas

Subject Areas (continued) Project Controls Scope, Schedule & Budget Earned Value Methods Critical Path Method (CPM) Scheduling Life Cycle Cost Analysis/Life Cycle Management (LCM) Risk Management Change Management Safety and Legal Worker and work zone safety Safety inspection standards, tools and techniques Role of Construction Project Manager in work zone safety OSHA compliance and injury prevention State specific occupational safety and health program Construction Law Statutory lien rights for builders and contractors Bonding requirements Interrelation of project owners, contractors, and other stakeholders Project documentation

Subject Areas (continued) Contract Administration Approaches to Contracting Contractor Payments and Retainage Contractor payment estimates and payment timelines Incentives and disincentives Retainage Liquidated damages Supplemental Agreement Change orders Justification statements for change orders Design/redesign during construction phase Specifications Interpret specifications for change orders Methods of Payment Bid items Agreed price Lump sum price Force account Claims Partnering Alternative Dispute Resolution Types of claims: delay, changed conditions, etc. Project Closeout Need for consistent and regular project documentation Contractor performance measurement/documentation Final acceptance of a project

Subject Areas (continued) Environmental Compliance, Review & Mitigation Stormwater Pollution Prevention NPDES permits Environmental Permits, Certificates and Licenses Hazardous Materials Erosion and Sediment Control Water & Sanitary Sewer Facilities Environmental stipulations regarding pollution (water, air & noise), archeological, paleontological findings Best practices in environmental compliance, review and mitigation Quality Management Project Manager’s use of QA information Elements of a “good” QC plan and QC data analysis Construction and materials acceptance Construction inspection and workmanship Independent Assurance Project Quality considerations: Different acceptance criteria and methods based on procurement methods Scope, location and size of the project(s) Coordination of multiple projects When project work is conducted (day time, night time) Different acceptance criteria and methods based on procurement methods (e.g. D-B-B, D-B, CM@Risk)

Subject Areas (continued) Third Party Coordination Common issues in third party coordination and the role of the PM Permits and Agreements Location, Mapping, Survey Railroads Subsurface Utility Engineering Interpersonal and Leadership Skills Communication Leadership Public Relations Conflict Resolution Ethical Conduct

Available Courses Summary Subject Area Courses Agencies Technical 6 FHWA, NHI Involvement During Project Development Process 8 FHWA, NHI, MnDOT, ODOT, SCDOT, ASCE Project Controls 24 FHWA, NHI, MnDOT, SCDOT, TxDOT, WSDOT, ASCE, Universities Safety and Legal 12 NHI, MnDOT, SCDOT, TxDOT, ASCE, Universities, OSHA, ARTBA Contract Administration 16 FHWA, NHI, MnDOT, SCDOT, TxDOT Environmental 5 NHI, SCDOT, TxDOT, ASCE, Universities Quality Management 13 NHI, MnDOT, SCDOT, TxDOT Third Party Coordination FHWA, MnDOT, SCDOT, TxDOT Interpersonal and Leadership Skills 11 MnDOT, SCDOT, TxDOT, WSDOT, ASCE

Gap Matrix Subject Area Courses Course Availability Project Controls Scope, Schedule, and Budget Project Management (TxDOT - DEV904, DEV912, DEV913, DEV914, DEV915) Project Management Professional (PMP) Certifications (FHWA) Project management (ASCE) Risk Management Risk Management (NHI) Risk Assessment and Allocation for Highway Construction (FHWA) Risk management (MIT) Earned Value Methods Earned Value Management (ASCE) Project Management Academy (WSDOT) Risk Assessment (TxDOT) Critical Path Method (CPM) Scheduling Use of CPM for Estimating, Scheduling, and Timely Completion (NHI) Resident Engineer Academy (SCDOT) - Construction Management Module Contract Time Manual (MnDOT)

Academy Considerations Develop as a “curriculum” rather than a “course”. Utilize training materials and training frameworks available from various states and NHI. Manage scope as courses are developed. Consider all available delivery methods Develop as a “curriculum” rather than a “course”. This will allow participants to take just a few of the courses suitable for their needs. Utilize training materials and training frameworks available from various states and NHI. Manage scope as courses are developed. The Academy’s goal is to focus on management aspects of construction; hence courses should not be too technical in nature. Consider all available delivery methods (web-based training, virtual classrooms, in-class) as applicable.

Next Steps Obtain external input and validation Establish Technical Panel for curriculum and course development Finalize course curriculum and training course outline Refine scope, target audience, and outcomes for proposed course Initiate training course development contract

Thank You! For More Information Contact: Ken Jacoby Telephone: (202) 366-6503 Email: Ken.Jacoby@dot.gov