Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.

Slides:



Advertisements
Similar presentations
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
Advertisements

Research Proposal Requirements and Networking Workshop ESTEC, Noordwijk, 13 September 2004.
WMO Competency Standards: Development and Implementation Status
GENIUS kick-off - November 2013 GENIUS kick-off meeting The Gaia context: DPAC & CU9 X. Luri.
VENUS (Vegetation and Environment New µ-Spacecraft) A demonstration space mission dedicated to land surface environment (Vegetation and Environment New.
GEOGLAM Phase-1 Analysis by the CEOS SEO Brian Killough CEOS SDCG-3 Meeting February 7-9, 2013 Sydney, Australia.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-5 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Slide: 1EUM/PPS/08/VWG/ October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo.
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
T SPP1788 “DynamicEarth“ Workshop, GFZ Potsdam, 3 July 2014 No. 1 Calibration/Validation of Swarm Data Products: German activities Hermann Lühr and Cal/Val.
Potentially Hazardous Asteroids: Characterization, Atmospheric Entry and Risk Assessment 9 July 2015 Ames Research Center Moffett Field, California IAWN.
An Overview of the ESA Storm Surge Demonstration Projects (eSurge and eSurge-Venice) Craig Donlon European Space Agency ESTEC, The Netherlands Maeslant.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
CAPACITY Composition of the Atmosphere: Progress to Applications in the user CommunITY STUDY OVERVIEW AND LOGIC Michiel van Weele, KNMI Kick Off/ Negotiation.
CEOS-CGMS Working Group on Climate John Bates NOAA/NESDIS/NCEI SIT Workshop Agenda Item 7 CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
LISA News from ESA O. Jennrich LISA Project Scientist.
Committee on Earth Observation Satellites Mexican Space Agency Plenary Agenda Item # 3 29 th CEOS Plenary Kyoto International Conference Center Kyoto,
Galileo Mission Consolidation & Maritime Needs December 18 th GISS, Brussels Status of Galileo Mission High Level Documents.
Second GOES Users Conference, Boulder October 1-3, Issue B Page 1 ACTIVITIES TOWARDS USER REQUIREMENTS FOR POST-MSG by R. Stuhlmann GOES Users.
The ESA call for the 9 th Earth Explorer mission (EE9)
Committee on Earth Observation Satellites John Bates, NOAA Plenary Agenda Item 8 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Agency, version?, Date 2014? [update filed in the slide master] Coordination Group for Meteorological Satellites - CGMS Update on Regional Retransmission.
Bow Basin Watershed Management Plan Revised Terms of Reference
Status Report – CEOS-CGMS Working Group on Climate Presented to CGMS-43 Plenary session, agenda item G.1.
ESA Iris Programme: status
Preliminary Recommendations to the Tribal/Interior Budget Council
CEOS Carbon Strategy – WGClimate Actions
Review of Candidate GEO Initiative “Geohazard Supersites and Natural Laboratories 2.0” Prepared by: Review Team Lead: Jonathon Ross – CEOS Delegation (Alternate)
Oct 22 Group Leaders Planning meeting
Project Management (x470)
Testing Process Roman Yagodka ISS Test Leader.
Overview of The Access for All Advisory Committee
5th Session of the Task Team on WIGOS Metadata
GSICS Quarterly Special Issues and Editors
TechStambha PMP Certification Training
CHARTER – User Intelligence Groups
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
INPE, São José dos Campos (SP), Brazil
Return to First Principles
CNES OCEAN program STATUs
Dr Sue Barrell, Australia
WMO Global Multi-Hazard Alert System
Precipitation Virtual Constellation (P-VC)
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
Recent activities of OCR-VC
Presented to the CEOS WGISS October 22, 2018
Memorandum of Understanding
Workshop outcomes from the CEOS perspective
Definition of Project and Project Cycle
Delta Long-Term Management Strategy
Composition of eXTP mission
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
CEOS Working Group on Climate (WGClimate)
Assessment of WFD River Basin Management Plans State of Play
Precipitation Virtual Constellation
Preliminary Project Execution Plan
Concept paper on the assessment of WFD River Basin Management Plans
ICAO ACP Working Group M Iridium Sub Group Overview
CONSTITUENT BODY REFORM (CBR)
Sentinel Workshop: context
Matter and Technologies
Presented to the CEOS WGISS October 10, 2019
Project Name Here Kick-off Date
NM Department of Transportation (NMDOT) MMS/PMS Phase 2
Presentation transcript:

Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station (ISS) relevant to Global Climate Change studies 16 Proposals were received from 309 science team members ESA Earth Sciences Advisory Committee (ESAC) recommended selection of the GEROS-ISS proposal for further study The GEROS-ISS experiment science objectives and requirements are elaborated with an International Science Advisory Group (SAG) Unique collaboration from three directorates, Human Space Operations (D/HSO), Earth Observation Programmes (D/EOP) and Technical and Quality Management (D/TEC) support the science, development and implementation of GEROS-ISS GEROS-ISS builds up from the solid experience gained in the definition, pre-developments and campaigns for the PARIS (Passive Reflectometry and Interferometry System) concept 3 studies on-going: One on Science requirements consolidation and 2 parallel phase A studies

Status of GEROS-ISS science activities ESA has run 3 SAG meetings (last one in July 2014) Meet-up with 9 top experts including the lead proposer of GEROS-ISS providing scientific advise to the Agency Approved Mission Requirements Document (MRD) detailing the science objectives and requirements ESA has released a science support activity “GNSS-R – Assessment of Requirements and Consolidation of Retrieval Algorithms (GARCA) Current status of the activity: Kicked-off on 1. November 2014, PM1 on 6 February 2015

Outcome of Phase A Identification of background and scientific issues to be addressed by the mission, considering the contribution of past and present activities in the field. It provides the justification for the mission, set within the post-2018/2019 time frame, and includes a review of the current scientific understanding of the issue in question while identifying the potential ‘delta’ that the mission could provide. Specific research objectives of the mission. Consolidation of mission requirements, including required geophysical data products and observational parameters, the need for observations from space and aspects of timeliness and timing of the mission. Definition and study of system elements, including the space and ground segments; and of the operations, calibration and data processing up to Level 1b. Description of the advances in scientific algorithms and processing, validation and assimilation techniques which may be required to meet the data product requirements.

Outcome of Phase A Comparison of expected versus required performance and ability to fulfil the research/observational objectives based upon the documented system concept. Documentation of maturity of the scientific user community in respect to planned use of the anticipated scientific products, the global context in terms of complementary missions as well as the operational or applications potential of the data products. Programmatics. It also addresses scientific and technical maturity, the development status of key technologies, risks, logistics and schedules.

Tentative dates for meetings Description Nominal Project Date PHASE-A GARCA Location ECE TAS-I GFZ KO (Kick-off) T0 5/12/2014 17/11/2014 1/11/2014 Telecon PM 1 T0+1.5 5/2/2015 4/2/2015 Contractor’s premises RR (Requirements Review) T0+3 6/2/2015 MRR (Mission Requirements Review) 25/3/2015 17/3/2015 ESTEC PM 2 T0+5 22/5/2015 29/4/2015 PDR (Preliminary Design Review) T0+6 9/6/2015 PMCR (Preliminary Mission Concept Review) T0+7 3/9/2015 8/7/2015 TAR (Test Acceptance Review) T0+9 24/9/2015 Webex PM 3 22/10/2015 8/9/2015 PM 4 T0+11.5 10/12/2015 10/11/2015 FR (Final Review) T0+12 18/11/2015 MCR (Mission Concept Review) T0+13.5 9/2/2016 26/1/2016 FR (Final Review with Final Presentation) T0+15 24/3/2016 1/3/2016