Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
Concept of the PANDA Detector for pp&pA at GSI Physical motivation for hadron physics with pbars The antiproton facility Detector concept Selected simulation.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
T082 Q1. A uniform horizontal beam of length 6
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Adding New Volumes to G4 geometry Baseline Alexander Sharmazanashvili, GCCEC.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June Arkadiusz Chlopik.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN Doro Lehmann has started to update barrel DIRC in CATIA based.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
14/06/2010 Stefano Spataro Status of LHE Tracking and Particle Identification Status of LHE Tracking and Particle Identification Stefano Spataro III Panda.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
PANDA Magnet Iron Yoke Strength Analysis
Roller/rail - System for PANDA
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Solenoid Yoke Door-Barrel Connection
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Propagation of Reconstructed Tracks
Dubna/JINR Status & Plans
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
PANDA Mechanical Design
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
Facilities, Assembly, Integration
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
STT Status Update Peter Wintz (FZ Jülich) for the STT group
Actual Dimensions in the Forward Spectrometer
EMC BWE PANDA Insertion
First of all we will remind some numbers:
Test beam setup: status report 10/02/2009
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Work packages status in Torino and perspectives
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Presentation transcript:

Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J. Lühning, GSI Auxiliary platform update Routing at the barrel yoke of the TS EDMS status

Auxiliary platform update castors for rack trolleys static support (no contact to floor when moving) Hinges

Auxiliary platform update Loop ends outside of cave Length of the cable chains defined by maintenance position (15 meters away from beam position)

Routing at the barrel yoke Muon GEM (next page) DIRC EMC EMC det. EMC manifold boxes at the upstream side

Routing at the barrel yoke Muon GEM DIRC EMC EMC det. Downstream side

Updates of 3D-models of PANDA components at EDMS since October ’14 (status 2015-03-16) Cluster Jet Target MVD STT FE-EMC BE-EMC Barrel-DIRC Mechanical Integration PANDA Hall