Integrated Resource Plan 1

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
March 2009 Emissions Trading in South Africa National Climate Change Summit Emily Tyler.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Click to edit Master title style 0 Eskom’s MYPD2 Tariff Application 03 December 2009 Brian Dames – Chief Officer (Generation Business)
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 14 NOVEMBER 2012 IPAP 2012/10.
CLIMATE CHANGE HEARINGS MamaEarth WADE The Democracy Foundation.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Africa Utility Week 05 Challenges of Undertaking an IPP in South Africa as a PPP James Aiello 17 May 2005.
Green Connection - Southern African FAITH COMMUNITIES ENVIRONMENT INSTITUTE Liziwe McDaid.
DISTRIBUTED GENERATION, RENEWABLE ENERGY AND SUSTAINABILITY. IMPACT ON POWER QUALITY AND NETWORK PLANNING “Inauguration of the 6th Framework Programme”
Sustainable Energy Plan June 22, 2002 Sustainable Development Council John Auguste (Ministry of Works, Communications, and Public Utilities)
RSA 20–year Electricity Generation Policy.
3/26/12 Electricity Supply Interruption Mitigation Strategy. ( ) 11.
1 PRESENTATION TO PPC ON ENERGY 24 MAY 2013 MUNICIPAL TARIFF DETERMINATION PROCESS.
Presentation to Select Committee on Economic Development
An embedded cogenerators response Andrew Carr
6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
1 Status on ISMO, IRP2010 and New Generation Regulations.
IPP Bidders Conferance LICENSING OF IPP PREFERED BIDDERS DoE IPP BIDDERS CONFERENCE – Presented by TAMAI HORE.
NERSA MYPD2 PUBLIC HEARINGS PRESENTATION 20 th January 2010.
ROLE OF NERSA IN DIVERSIFICATION OF ENERGY IN SOUTH AFRICA By Andile Gxasheka Southern Africa Biofuels Association National Stakeholders Forum
Global Energy Problems and Counter Policies and Measures of Korea
FINANCIAL AND FISCAL COMMISSION
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
Professor H. J Annegarn, Ms L Cape
It’s now time for political decisions
CCU Update integrated resource plan May 17, 2016
Allington Waste Management Facility
Economic Regulation of Irish Water
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
Portfolio Committee- Trade and Industry – 11 March 2015
By Joseph Al Assad Advisor Ministry of Energy and Water
SECRET.
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
NERSA presentation at the PPC meeting held on 24 May 2006
City of Cape Town New Urban Agenda
South-East European Space
EIUG Energy Intensive Users Group Comments on the Energy Bill
Collaboration with other government entities
NEDLAC REPORT TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITTEE ON ENERGY
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 2 NOVEMBER 2012 IPAP 2012/10.
Power System Generation Expansion Plan
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Jonas Zingerle, GIZ Tunis, le 03/09/2012
ENERGY & WATER SECTOR EDUCATION AND TRAINING AUTHORITY PC - ENERGY
PORTFOLIO COMMITTEE ON ENERGY, (PCE)   PUBLIC HEARINGS ON ENERGY EFFICIENCY 5 September 2012 Committee Room V475, 4th Floor, Old Assembly Wing Barry.
SOLAR WATER HEATING MASS PROGRAM
Utilizing Renewable Energy Sources in Kosovo till 2020
GCF business model.
Progress on the Renewable Energy IPP Procurement Programme
Portfolio Analysis Mike Hopkins
OUTLINE RE Programme Objectives Integrated Resource Plan
Presentation to the Parliamentary Portfolio Committee
Energy transition in Uruguay
Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Presentation transcript:

Integrated Resource Plan 1 2009 2

Outline of presentation Why did we introduce the IRP? What is the relevance and focus of IRP1 in the context of the Eskom MYPD2 application? What does IRP1 seek to achieve? What about renewable energy going forward? What about the consultation process? What happens with future IRPs? 3

Why did we introduce the IRP? Historically there was a gap in the alignment of the Eskom capital program in relation to government energy policy objectives “Integrated Resource Plan means a resource plan established by the national sphere of government to give effect to national policy” (definition in the Electricity Regulation Act No.4 of 2006) It is a planning process that seeks to identify the future electricity demand and the energy mix that will meet that demand In August 2009 the regulation for new generation capacity was promulgated – instrument in the hands of the Minister to dictate what gets built and what NERSA may license MYPD1 over the previous period (2007-9) concluded in policy vacuum – need to avoid risk of a repeat against backdrop of huge capital investment program

What is the relevance and focus of IRP1? Eskom MYPD2 application requires NERSA determination, primarily making choices about what gets built; IRP1 gives NERSA policy framework for all investments (consequently tariff) required over next 3 years only; IRP1 does not make determination about who builds (Eskom or Independent) but this is the prerogative of the Minister. 5

What does IRP1 seek to achieve? Specific policy objectives over the MYPD2: Introduction of 10 000GWh (about 4%) of renewable energy in the mix; Introduction of 1m solar water heaters as a specific intervention; Introduction of an incentivised energy efficiency and demand side management scheme; In addition, preparation (not investment decision) regarding the next base load power plant. 6

What about renewable energy IPPs in IRP2? Support for RE projects (outside the SWH program): A wind project (Sere -100MW) and a Concentrating Solar Power (50MW) – Eskom will undertake on “build and transfer” basis; REFIT and cogeneration program of 1 100MW; The potential positive impact of clean technologies through job creation needs to be exploited – this is not lost to the department, hence IRP2 process in 2010; 7

What about consultation in IRP1? We acknowledge the consultation could have been more extensive – beyond other government departments, Eskom, NERSA, System Operator Hence only the 3 policy objectives are being pushed in IRP1 relevant to MYPD2; Balance of energy mix over 20-year horizon will follow rigourous consultation process Need to balance considerations: Environmental Financial Supply adequacy Policy 8

What happens with future (IRP2)? A stakeholder based consultation process will commence in Q1 2010; The new generation capacity regulation (Newgen Reg) requires that NERSA must be consulted, in turn NERSA is required by law to consult the public; Newgen Reg also provides institutional arrangements for consultation on, inter alia: Demand forecast; Macro-economic and other assumptions; Modelling of scenarios by Independent System Operator (not Eskom) 9

Cone for future capacity needs MYPD2

Policy-adjusted: IRP1

Explanatory notes The technology choices are illustrative of the manner in which the policy objective can be met and this should not be seen to be firm choices. Pre-Engineering work for the next baseload is accomodated in the IRP. The next baseload power is expected to be commisioned by 2017. Besides the indicated programmes in the previous slide, the IRP makes no commitment on any other project.