Future Science Building and Atrium

Slides:



Advertisements
Similar presentations
Space Reallocation Update October, Summary “Almost” on time “Almost” on time Definitely under budget Definitely under budget Thanks to all for their.
Advertisements

Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Ford Hall A New Concept for Liberal Arts Colleges Stylianos Scordilis Occupant Update.
Auxiliary Services CWU Board of Trustees February 4, 2010.
Finance and Administration Advisory Group June 30, 2010.
The Housing Plan Revisited Update on Comprehensive Housing Master Plan and the next phases Board of Trustees Retreat July 30, 2009.
Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Athabasca Hall - The University's First Building Part V: Computing Science Centre and Athabasca Hall Renovations:
Mission-Based Management May 2006 Electronic CV System Users Group.
I.Program Update The following summarizes major activities completed or in progress as of September 30, II.Program Budget Summary (Attachment A)
Julius West Middle School Construction Updates
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Maplewood Middle School Addition Board of Education Meeting May 7, 2012.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
Burson Building Renovation Overview of Project Needs Department of Chemistry Sherman L. Burson, Jr. December 24, 1923 – December 3, 2012 Bernadette Donovan-Merkert,
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
F & A Advisory Group. Background Over 80 labs vacated as part to the ISC move and another 14 labs will be moving to University Hall These labs and ancillary.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
University of Adelaide HSIS2
Design & Integration Services at the University of Florida
Community Forum 2017 Project Overview UNIVERSITY OF UTAH.
February 13, 2017.
PRR Activation Meeting
Accreditation Update Board of Trustees Meeting January 12, 2016
Campus Master Plan.
Academic Affairs Update Monday, October 17, 2016
Finance Program – Phase 2
Inspire Elementary School
Facilities Update November 17, 2017
Clydebank Town Centre Office.
21st Century School Buildings Plan
Facilities Report to the Buffalo State College Senate May 6, 2016
More than “BUTTS IN BEDS”
UNION GROVE ELEMENTARY REFERENDUM
Kincaid Hall Renovation
The School Point of View
KEY STAGE 2 – 3 TRANSITION.
Foothill College Accreditation Self-Study Update
Computer Science in the Early Years
X-ray Pump-Probe Instrument
College of Alameda Integrated Planning and Budgeting Process
Wauwatosa School District
Carleton College Summer 2018 Science and Campus Construction Plan
Potential Milestones A timeline to finish in one year
GERI Moves and the ERDF Project
Mission Hall Ask & Learn
BSOE SPACE/FACILITIES COMMITTEE Agenda – July 23, 2009
Welcome! Hodgson Middle School Parent Information Night
Facilities Modernization Program
Davisville Junior Public School / Spectrum Alternative Senior School
Board of Trustees Update
Support of the Missouri Compacts
Mary Ann Triest & Betsy Roche
Course Evaluation Ad-Hoc Committee Recommendations
New Building for the Department of Chemistry
Using Student Survey Data to Build Campus Collaborations
Carleton College Facilities Management
Strategic Planning Timeline Overview
ESS Project Status Roland Garoby – Technical Director August 2018.
Strategic Planning Update Winter 2007
NSS Instrument Project Tollgate Coordinator
MULTISPORTS CENTRE PRESENTATION
Community Forum March 18, 2019.
Growing in Faith, Building Together
President Search “the most important work that this Board Will Ever Do” Our Next Steps: Search Firm and interim President Report to the Clark College.
Budgeting Conversation
Presentation transcript:

Future Science Building and Atrium MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL Future Science Building and Atrium Carleton College Science Facility Schedule Update and Transition Plan September 29, 2016 Presentation Thank you for being here today. Eric Kruse, the college’s owners representative is here with me from Pegasus group; and Bev, Fred, and Steve Spehn are also here from the Core Committee. Our goal is to update you regarding the current plans for the new integrated Science Facility. Because of our ambitious and exciting plans for the new space, this would be the largest and most complicated project we have ever done at Carleton. We are still awaiting approval from the BOT to continue with the next stage of the project, but assuming that we get their blessing to move forward, here is what you can expect to happen in the next year and more. I also want to emphasize that this is proposed, and the plans are not yet firm. We are presenting this so you can appreciate the complexity of the project and also provide us with more information as the plans become finalized.

Science Facility—Tentative Schedule Carleton College Science Facility—Tentative Schedule 10/2 - 11/30 Demo. Mudd Winter bk. Arena Renov. for Phys. Shop Summer 2017: Music to Weitz; Renovate Olin, Hulings, Arena, Old Music 10/14/16 Trustees 12/1/17-Begin New Addition 2020 Project Complete 10/31 - 4/28 Const. Docs. Winter-spring Trustees 9/15/17 classes start Summer 2019 Occupy New; Begin Olin & Hulings remodel The timeline starts with the BOT meeting in a couple of weeks. After this, Carleton will continue to work with EYP on the construction documents. This work will derive exactly from the design development documents that departments carefully vetted over the summer. Eric Kruse has collected the department feedback and over the summer he communicated that to EYP. If you have questions about your space and the plans, Eric is the person whom you should ask. At the same time, you should know that the plan is set. Locations of walls, equipment, laboratories, dimensions of rooms, etc, are not going to change. Because the CDs are essentially a translation of the DDs, Eric and Steve Spehn will largely oversee that translation. IF they have questions, they may contact you, but faculty and staff will largely not be involved in this stage. We are going to begin the process of determining the interior furnishings and layouts, though. We have hired the Collaborative Design group, whom some of you have worked with in planning the transition, to work with us on that process. The Science Planning Group will be involved in meetings with Collaborative Design in late October through February to make these decisions. We plan to expand the SPG to include a few more members of the community outside of the sciences, in order to ensure that we plan a facility that will be broadly inclusive. Along the way, we plan to renovate Arena Theater to hold the physics shop. This will take place over winter break. Once the CDs have been vetted and priced, the project will again require BOT approval to move forward. This should happen sometime in late winter/early spring. Mudd will then be demolished beginning in October of next year, and construction on the new addition will begin shortly thereafter. This will go on until summer of 2019, when we will have a second transition that involves moving Chem, Geo, and Physics into the new construction and the other occupants of Olin into Arena and Old Music. The details of these later stages of construction are not worked out; I want to focus on the early stages We then plan to continue with renovations to Oline, Hulings, Arena Theater, and Old Music Hall, in order to accommodate Chemistry and Geology. Before these can take place, Music will need to vacate M & D and Old Music. Because the Weitz addition will not be complete until later in the summer, Music’s materials will be stored in Weitz. The faculty in Music also will not have offices on campus this summer. 11/2016 - 2/2017 Interior/Furniture Design

Transition Renovation Scope Basement: 300 Chem. Teaching; Insts.; Research MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL Chem. & Geo. Offices; Comp. lab Student study spc. Future Science Building and Atrium 2017 Transition Renovation Scope 1st floor: 100-200 Chem. Teaching; Stockroom; NMR Lower level: Geo. Upper level: Phys. shop; Haz. Mat.

Future Science Building and Atrium MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL Basement closed Closed until mid- July; Chem/Geo Offices open thereafter Link Closed Future Science Building and Atrium Link Closed PROJECTED Summer 2017 Closures Closed; Faculty and staff must vacate by early July East side of 1st floor closed; West side accessible Music moves to Weitz Weitz closed for Summer Closed except 1st floor Arena

Moving Principles Costs part of Transition Budget—supplies, movers Purge as much as possible Pack throughout the year Departments pack with help from student workers Follow packing protocol—TBA Equipment—specialty movers HazMat—coordinated with Wayne Brown

Future Science Building and Atrium Carleton College Science Departments Transition Plan MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL Future Science Building and Atrium Moving Periods: Winter Break Spring Break Summer Packed Material: Goes to long term storage (recoverable for ‘17-’18 school year) Remains in office/lab/classroom Goes to renovated space

TENTATIVE Move Schedule

Move #1 Science Departments 2017 Move Plan MUSIC HALL (OLD MUSIC) Carleton College Science Departments 2017 Move Plan MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL Physics Shop (12/27-12/30/2016) Internal Hulings Moves Rm 109 (12/2/2016) Rm 117-Herbarium (winter break 2016) Move #1 December ‘16 Move #2 Move #3

Move #2 Science Departments 2017 Move Plan MUSIC HALL (OLD MUSIC) Carleton College Science Departments 2017 Move Plan MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL lower level Music & Drama partial move out (3/20-3/24/2017) Music Dept. partial move out Internal Hulings Move Rms 102/102a/104 to 109 (3/20-3/24/2017) Rm 117-Insect Collection (prior to 4/15/2017) Move #2 Spring 2017 Move #3

CONCERT HALL lower level Carleton College Science Departments 2017 Move Plan Music Dept./M&D move to Weitz & off-site storage (6/14-6/16/2017) Bulk Chemical & Haz Mat Storage (6/12-6/16/2017) Music & Drama move to Weitz & off-site storage (5/30-5/31/2017) Move musical instruments to Concert Hall stage (6/7/2017) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL lower level Internal Hulings Moves Rms 102/104 (6/12/17) Rms 106/112/118 (6/8-6/9/17) MUSIC HALL (OLD MUSIC) Move NMR to Hulings Rm 117 (5/30-6/16/2017) Move #3 June 2017

CONCERT HALL lower level Carleton College Science Departments 2017 Move Plan MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL lower level Geology Classrooms/Labs 7/5-7/14/2017 Chemistry/Geology Faculty/Staff Offices 7/17-7/21/2017 Geology Labs/Storage Move #3 July 2017

CONCERT HALL lower level Carleton College Science Departments 2017 Move Plan MUSIC HALL (OLD MUSIC) HULINGS HALL MUDD HALL OLIN HALL ARENA THEATER CONCERT HALL lower level Chemistry Teaching Labs (9/5-9/8/2017) Move musical instruments from Concert Hall stage to Music Performance Commons (TBD) Chemistry Labs including ICP-MS & LC-MS Equipment (8/28-9/1/2017) Move #3 Aug.-Sep. 2017