Advanced Aero Vehicle Group

Slides:



Advertisements
Similar presentations
College of Engineering and Computer Science Department of Mechanical and Materials Engineering Wright State University Regular Class Aircraft SAE Aero.
Advertisements

Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Brian Martinez.
SAE Aero Design Guidelines Rev A, 2013 Aero Design Oral Presentation Guidelines How to Deliver a Presentation The Judges will Notice.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Group 3 Heavy Lift Cargo Plane
Critical Design Review of “Mach Shock Reduction” Phase II January 2008 Statesville, NC.
Rockets Read and follow along. On your journals, draw the rockets and label. Draw and label the parts of the rockets and answer the questions listed.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
 Vehicle dimensions, materials, and justifications  Static stability margin  Plan for vehicle safety verification and testing  Baseline motor selection.
LAUNCH IT! 1st Lieutenant Joseph Haggberg Test Engineer, USAF.
Team 6: “Soldier Portable UAV” David Neira TJ Worden Matthew Martin Joshua Mellen Ona Okonkwo Josiah Shearon A IR HERCULES 1.
Critical Design Review- UCF Jeremy Young Anthony Liauppa Erica Terry, Emily Sachs Kristen Brightwell Gillian Smith 1.
1 ME 442 Senior Project Week 3 Dr. Joseph Vignola Pangborn G43, Phone , Tuesdays & Thursdays, 9:35-12:25 AM,
1 ME 442 Senior Project Week 6 Dr. Joseph Vignola Pangborn G43, Phone , Tuesdays & Thursdays, 9:35-12:25 AM,
P15462 – TETHERED WIND ENERGY PLANE Devin Bunce Matthew Kennedy Matthew Maginn Carl Stahoviak Matthew Zebert.
RPAS / UGV / USV / ROV WHERE DO YOU SEE US FITTING INTO YOUR PROFESSIONAL LIVES AND HOW CAN WE WORK TOGETHER TOWARD A SHARED TOMORROW AND MAKE PROFITABLE.
TESLA Rocket Project Lecture #3 10/28/15
Subsystem Level Design Review.  Project Review  System Level Changes ◦ Tail Dragger ◦ Airfoil Change and Discussion  Subsystem Selection ◦ Fuselage.
SAILBOT Meeting Notes 9/14/2014. AGENDA Rig Boat / Make check list Tutorials/ introductions Website / FB page Cybox Trello SolidWorks C++
Page 1 TESLA Rocket Project 11/4/15. Page 2 1)Schedule 2)Launch Performance & other stuff.
Critical Design Review Team Floating Point MIT April 25, 2003.
CASE STUDY ON “AVIATION” BY VISHAL DESHPANDE VINAY AKKI SHABAZ BHAVIKATTI SHAHASAN NOUSHAD Slide 1.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
2016 Kansas BEST Breakout Sessions
Room 111 News Friday December 2, 2016 Important dates:
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
AAVG General Meeting September 9, 2015.
Sae – aero micro capstone
Sae – aero micro capstone
Advanced Aero Vehicle Group
General Meeting October 6th 2014.
Advanced Aero Vehicle Group
General Meeting 4/1/2015 Free Cookies + Soda in back
General Meeting 2/18/2015.
Reflecting on Sprint 1 Reports
Tips for making your project less stressful and less time consuming
Advanced Aero Vehicle Group
Community Project Timeline – What are my deadlines?
General Meeting 2/11/2015.
How high can aircraft fly?
Mrs. Erickson’s 2nd Grade Memos Special Notes SPECIALS Upcoming Events
FINAL REVIEW UAV AIRFRAME B
2018 First Nation Launch - Flight Readiness Review
AAVG Meeting 09/02/2015.
Year 3 1.
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
WELCOME!.
UWGB Student Organization Advisor Basics
Analysis of Rocket Propulsion
AESIR Ballooning 02/28/18.
Panther II Hybrid Rocket Final Semester Overview
Team Members Full Names Class Number and Name Date
Newsletter November 2016 Welcome to our first Newsletter for 2016
Project Lead: Austin Brenner
Go on the website under the tab “A.P. Exam”
Welcome, Beta Club *First Meeting*.
Sae – aero micro capstone
Eagle Space Flight Team
UWGB Student Organization Advisor Basics
2019 First Nation Launch – FRR Virtual Review
Year 1 Newsletter Congratulations! Langley Park Primary Academy
2019 First Nation Launch – Oral Presentation
NORTHERN ILLINOIS HOCKEY LEAGUE
Parent/Player Meeting 5/29/2013
Managerial REVIEW UAV AIRFRAME B
UWGB Student Organization Advisor Basics
8th Grade Dinner-Dance Friday, June 21, 2019.
2019 First Nation Launch – Oral Presentation
Presentation transcript:

Advanced Aero Vehicle Group 10/28/2014

Polos Still collecting money Fill out form on OrgSync for sizing

SAE

2015 Competition Meeting tomorrow at 7:30 at the SDELC to discuss where we’re going

Aerodynamics

Things to Come Look into CFD testing Put plane parameters into RealFlight and test Discuss with the group what they would like to look into and items they want to go over

D&M

This Week We have designed the tail plane Instead of doing foam and carbon, I have designed both a carbon and foam and a balsa version. The balsa version is 65% lighter. (and cheaper!) We started manufacture of the tail plane yesterday Our current model, including everything with our current density data, is weighing in at 5.75 lbs!! I am confident that it will be below 6.5 lbs when its all said and done!

Upcomming Should get wing ribs and other wing materials by middle of next week Will continue to put the final touches on model Estimated completion of prototype plane by end of November… hopefully we can get a test flight in before it gets too cold!

Pictures!

More PICTURES

Prop

Last Week We ran the engine for 45 minutes. The 6oz tank lasts for 14+minutes

This Week We will run the 8oz fuel tank Static thrust margins

Research & Development Last Week: Researched electric motors This Week: Testing propellers Buying more materials for testing Meeting will be moved to Friday again

Electronics

Last Week Got autopilot working

Next Week Start testing drop code Work with pitot tube Meeting on Sunday at 3:00 PM

Rocket Team

Congratulations Subleads AP: Matthew Fogle MD: Jill Davis Electronics: Brandon Sullivan Testing and Integration: John Jarvis

Midwest Power Its finally here!!!!! Leaving Friday at various times Make sure everyone has their ride/cold weather gear Ask about Drag Race Weather update MST Apparel

SpaceX Rocket Congrats on the Elite Team members Had meeting last night The Musketeer?

Competition Rocket Rocksim almost done Competition Safety Skype Call on Next Wed Start looking for materials and pricings Better ideas of payload concepts

Other T-Shirts New PR rockets Park Day Success!!!! Parent Form Future Campouts? Parent Form

Documentation/P.R. Committee Purpose: To have records of what rocket team is. Maintain a website Newsletters PR for rocket team. Picture/Video Collection/Technical Documents Maintain archive of awkward kyle+alex photos

What we have accomplished Started work on newsletter Assembled our team(if interested, raise hands now!) Started work on website (will be porting to wordpress within the next few weeks) Http://www.mstrocket.webs.com If anyone has experience with wordpress and would like to help with building the rocket website, please see us at the end of the meeting

Aerodynamics and Propulsion

Last Week Finalized body tube lengths Worked on Nosecone and fin analysis RockSim vs OpenRocket Research on fins

This Week RockSim and OpenRocket models

Testing & Integration This week: This weekend: Next week: Got things ordered Modified test stand for rockets This weekend: Launch Rockets! Next week: Space week!

Manufacturing & Design Last Week: No meeting This Week: Midwest! Meeting still on Sunday at 6pm (hopefully) Get me your numbers, may do a groupme, just so it’s quicker to get a hold of people Watch for email from me for things to do Material selection Motor Casing research Juan and Daniel particulates tray work

Electronics – Last Week Looked at weights for the payload bays Compiled that into a spreadsheet for Alex

Electronics – This Week Going to contact IREC to see how exactly the 10lbs rule works Try to lay out how the bays are going to be designed

Questions?