CONTRACTORS’ ACTIVITIES

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 6 – Site health & safety Version: September 2007.
Advertisements

Tower Crane Safety Regulations
Fire Emergency Plan Lesson on Fire Emergency Plan.
Emergency Evacuation Zayed University, Dubai Campus.
Interim Life Safety Measures Eleven Administration Actions of Interim Life Safety Measures ÷Ensure free and unobstructed exits. Personnel receive additional.
Health and Safety - an update Ian Gillett Safety Director.
Building Marshal General Duties Evacuation Assistance Accountability Scene Integrity NC STATE UNIVERSITY Environmental Health and Public Safety Fire Protection.
How to create... A Fire Evacuation Plan.
INDUCTION. WELCOME 1 st Call prides itself on the our quality of candidates and wants to ensure that all our people are safe in any environment that.
Heath and Safety Contractor Induction. AUTHORISATION TO WORK No work should be carried out unless you have been given authorisation from your host Contact.
Temporary Works.
UK’s CDM Regulations 2007 and its Applications in Singapore
OCCUPATIONAL HEALTH & SAFETY Faculty of Education, Humanities & Law Emergency Information Staff Student Visitor.
Confined Space Safety Training Presentations
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
2014 Construction Conference N.C. Region Stormwater Erosion Control Engineer KEVIN GARRIGAN, P.E. (715) (715) (CELL)
HEALTH AND SAFETY IN THE HOME POLICY JULY HEALTH AND SAFETY AT HOME POLICY Why do we have this Policy? In order to make sure our properties are.
Staying Safe at Work Teaching Workers with Disabilities about Health and Safety on the Job.
Heath and Safety Contractor Induction. AUTHORISATION TO WORK I On arriving at site, please contact your host via Reception Your host will provide a full.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Fire Safety – Basic Concepts For Office, Facility, and Laboratory Employees Tulane University May 2012 Tulane University - Office of Environmental Health.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Ryan Arnold, P.E. (715) 421-???? (715) 459-???? (cell)
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Permit Process & Application Guide
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
CDM Construction Design and Management
New Employee Orientation
Electrial Safety LS2 days November 2016 AP
ROLE OF THE TSO WHEN THERE ARE WORKS IN THEIR AREA…
Emergency Information
Starter Activity What kind of tasks or situations is an employer legally required to perform a risk assessment for? Use of any work equipment. Management.
Apprenticeships All content correct at time of presentation creation – 25th April 2017, please check all reference materials quoted for updates.
Handout 1: Health and safety at work
CDM Client Briefing Tim Knowles
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Risk Assessment and Control
Safety Documentation EHN1
Occupational Radiation Protection during High Exposure Operations
PDO Safety Advice What happened?
Always use 3 points of contact when using ladders
Construction (Design and Management) Regulations (CDM) 2015
HSE update December 2017 Liz Hunter
Temporary Works Co-ordination
Emergency Evacuations: Multi-Level Apartments
Workforce Engagement in Safety
How to Choose a Safe Summer Camp for Your Child
Technical Brief: Part 3 Work Package Plan (WPP)
29 CFR NFPA Life Safety Code
Teaching Workers with Disabilities about Health and Safety on the Job
INFORMATION ABOUT ASBESTOS
Cleaner Colleague Induction Tour: Trainer Guide
Ray Filip BEng (Hons), MSc, DIC, CEng, FICE Temporary Works Consultant 31 years temporary works experience: Concor Construction (Africa) John Laing.
OCCUPATIONAL HEALTH & SAFETY Emergency Information
Safety & Health Programs
Safety & Health Programs
Minimize Hazards & Changes in the Workplace
Team Leader name: Date:
Tenant Safety Team Guidelines
Safety & Health Programs
Prices in Civil Engineering
Effective Construction Safety Management
Part 2 County of Ventura Emergency Action Plan
Denver Fire Depart. License Fire Alarm Practice Test # 12
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

CONTRACTORS’ ACTIVITIES CASE STUDY Try to answer the following questions for the work situation below. What do I need to pay attention to? Before and after the activity. What information must I pass on and to whom? Before and after the activity. How should I approach new situations arising during the activity? Whom should I contact if the need arises? How should I follow up after the activity?

10 – CONTRACTORS’ ACTIVITIES CASE STUDY Replacement/renovation of lifts (e.g. Building 892) The work takes place in several stages: 1. Dismantling the existing lift This involves dismantling the cabin, all power supplies (hydraulic and electric), the guide rails, the machinery and the doors. The activity has been entrusted to a specialised firm.  Forecast: 2 lift engineers working for 2 weeks. 2. Civil-engineering work The bottom of the shaft needs to be excavated so that the lift can descend one additional floor. As the lift doors will be a different size, it is also planned to reconstruct the sills on each floor (including the floor covering) during this stage of the work.  Forecast: 3 construction workers working for 3 weeks. 3. Assembling the new lift This consists of assembling the new parts in the same way as the parts that were dismantled. Forecast: 2 lift engineers working for 3 weeks.

10 – CONTRACTORS’ ACTIVITIES CASE STUDY POSSIBLE ANSWERS Before the work  I must be informed (IMPACT, etc.), I must know what the situation is in the sector where the activity will take place. On receiving the IMPACT, I must make my comments (e.g. ask for a joint inspection) and give my approval. I must attend a joint inspection in order to inform the work supervisor, and the safety coordinator if applicable, of hazards/specific issues in my area. I must take account of the work parameters and take measures/instruct others to take measures to maintain the level of safety in the building. I must communicate with the occupants of the buildings (organisation, disturbances, etc.). During the work I must monitor the evolution of the situation in the sector where the activity is taking place and notify the work supervisor, in the first instance, of any problem, then the safety coordinator and the HSE Unit if applicable. After the work I must survey the area after the work, checking in particular that: worksite waste has been removed, thoroughfares and emergency exits are not obstructed, differences in ground level have been made safe (false floors, trapdoors, various openings, etc.) temporary signs have been removed, permanent signs and first-aid materials are back in their original places, disabled alarm systems have been reactivated (in accordance with IS 37), etc. And I must be ready to begin the safety acceptance inspection (in accordance with IS 4). Throughout the activity, my main contact is the work supervisor.