City of Gresham – Hauton B

Slides:



Advertisements
Similar presentations
City of Madras – Madras Elementary/Buff Elementary School: Sidewalk construction, crosswalk improvements, and safety.
Advertisements

City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary.
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
City of Umatilla – McNary Heights Elementary / Clara Brownell Middle School Sidewalk/curb extension/pathway/bus driveway construction; crosswalk/lighting.
Portland Bureau of Transportation Lent Elementary/Mill Park Elementary School.
West 181 Street, Hall of Fame Terrace & University Avenue/ MLK Boulevard 2 children killed by vehicles in five years - tied for most dangerous.
Gibbsboro School Students enter 8:00 Tardy at 8:15 DROP OFF LANE Please leave promptly Use Crosswalk if parking on opposite side of school Lauer Lane.
Bus Loading Zone Kinder Pick up/ Parking 1 st Grade 2 nd Grade 3 rd Grade 4 th Grade 5 th Grade 6 th Grade 5 th & 6 th parents to Margaret Curb Side pick.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
REFERENCE POINTS Relating a part of the vehicle to some part of the roadway. This relationship is a helpful visual reference of your vehicle in it’s operating.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
Triskett Road Rehabilitation Lorain Avenue to West 117 th Street March 18, 2014.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Contact: Beth Morris
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Slide 1. Slide 2 Introduction How did you get to school as a child?
East 169 Street & Third Avenue 24 children hit by vehicles in five years - tied for 4th most dangerous.
Fordham Road & Webster Avenue 26 children hit by vehicles in five years- 3rd most dangerous.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
The Distance Formula Finding The Distance Between Points On maps and other grids, you often need to find the distance between two points not on the same.
6.2 Circumcenter and Incenter
Public Works EVANSTON ILLINOIS September 29, 2014 Dodge Avenue/ETHS /Mason Park Bike Improvements Project Sat Nagar, P.E. Assistant Director of Engineering.
How to Address an Envelope
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
FIRST CREEK Natural Areas Stewardship Training Project.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
Planning and Design in Rockford: Morgan Street Bridge Project 315 North Main Street · Rockford IL
March 8, 2005 Commonly Used Bike Routes  Roughly half are located on arterials.  Topography makes east-west movement more difficult.  No marked bike.
Parallel and Perpendicular Lines
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
City of Cambridge Department of Public Works October 19, 2010 Schedule: Construction Beginning: October 2010 Construction Duration: 18 months Contractor:
Center City Bike Network SBAB briefing objectives Share progress report on Center City Bike Network Describe Sounding Board Discuss next steps 1.
Arizona Forward Update
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Bicycle Lanes for the City of Boston
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
UW Medicine Lake Union Phase 2
Gilbert Road Light Rail Extension
Paving Assessments.
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
PEDESTRIAN + CROSSWALK = STOP!
STREETS & STORMWATER DEPARTMENT
Concept Sketch of a Bicycle Priority Lane a) Multilane Street, along a Parking Lane When along a parking lane, right edge of bicycle priority lane is 10.
1326 S. MICHIGAN APARTMENTS + RETAIL
Neighborhood Assessment
Bike Boulevard 4.6 miles of bike lanes, bike dots, shared lane markings and guide signs on collector and local streets. March-April 2012.
6.2 Circumcenter and Incenter
COACT ODOT Update September 13, 2018.
Engelhorn/danmor apts 410 West 3rd Avenue
CIP Amendment – Property Acquisition
Special Valuation Hobson Building 1213 West Railroad Avenue
Motor Row Streetscapes
SE 12th Street Roadway Improvements February 8, 2005.
25th Avenue Grade Separation
25th Avenue Grade Separation
LANE FOR STUDENT DROP OFF
CIP Amendment – Property Acquisition
West Campus Parking Deck & Roadway Update
? BY HERBER.
M14A/D Select Bus Service
Period 2.
Commercial Nomination 201 West Riverside Avenue
Sprague Avenue Phase II Survey Results and Next Steps
DDOT Western Avenue, NW Project
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
Presentation transcript:

City of Gresham – Hauton B City of Gresham – Hauton B. Lee Middle School: (1) Bike lanes - both sides NE 172nd Ave (NE Glisan St-NE Halsey St) (2) Crosswalk-curb extension installation–Intersection NE Pacific St/NE 172nd Ave (3) Crosswalk removal – Multnomah Street (4) Pathway connection from school to NE Hassalo Street 1 3 4 2

City of Gresham – Hauton B City of Gresham – Hauton B. Lee Middle School: Bike lane construction both sides NE 172nd Avenue Parking removal - west side of street

City of Gresham – Hauton B City of Gresham – Hauton B. Lee Middle School Crosswalk removal for relocation (two new locations – Pacific St and in front of school) H. B. Lee Middle School NE 172nd Avenue Multnomah Street

City of Gresham – Hauton B City of Gresham – Hauton B. Lee Middle School: Paved pathway connection from school property through corner of Columbia View Park to NE Hassalo Street