Irish Construction Law Conference 2015

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
ISTISNA’.
Training & Development Contract Management. Contents Introduction to Contract Management Definition Contract Management Issues Activities Overview Contract.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
CONTRACT PAYMENTS & VARIATIONS
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Article XXXVI – Signature, ratification, acceptance, approval or accession 1. – This Protocol shall be open for signature in Berlin on 9 March 2012 by.
HAYLEA CAMPBELL SUSTAINABLE PROCUREMENT IN THE EU.
NEC - Engineering and Construction Contract (ECC)
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
Time for a new standard - AS General Conditions of Contract
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
THUBELISHA HOMES: JOE SLOVO 950 HOUSING PROJECT NELSON MANDELA MUNICIPALITY INDEPENDENT REPORT ON THE CLAIM BY METRO BUILDING & CIVIL CONTRTACTORS cc Presented.
Contract price & payment
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
IFRS 1 FIRST TIME ADOPTION OF IFRS Asish K Bhattacharyya Slide 1.
Tendering in Poland. INTRODUCTION Company Setup Tendering Project Delivery.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
Compensation events and claims Presented by Prof. Khem Dallakoti.
1 Analyisis application Incoterms EXW – Ex Works General notes  The seller delivers the goods at the moment that he places the goods at the disposal.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Specification & Quantities Estimating
July 2013 What you need to know about procuring suppliers Deborah Ramshaw and Lois Shield.
CONSTRUCTION CONTRACTS DOCUEMENTS
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
FORMATION OF COMPANY. Steps for formation of a company  Electronic filing of form  Incorporation of company  Certificate of incorporation  Promoter.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Premium Allocation Approach
Amendments to the Public Works Contracts
Evaluating Small Business Participation
GUIDELINES ON 20% SUB-CONTRACTING Presentation by:
Introduction to FIDIC - Manuals
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
FAR Part 2 - Definitions of Words and Terms
Content of Tender Dossier - Instructions to Tenderers - Tenders
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Financial Clauses and Procedures.
Administration of a FIDIC Contract - Financial Management
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Small Business and Subcontracting.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Particular Conditions of Contract & Appendix to Tender
Pre-contract Planning and Practice
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
GDPR – Practical Implementation Managing contracts, procurement and relationships with suppliers Terry Brewer Chief Executive.
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
Proportion of total R&D expenditure on alliances or joint ventures by stage of R&D in 2005 APRIL 2007 SOURCE: CMR INTERNATIONAL PERFORMANCE METRICS PROGRAM.
Approach to Market Cutover - Draft for Discussion
Right of Way Certification
Presentation transcript:

Irish Construction Law Conference 2015 Kevin Kelly Royal Marine Hotel, Dun Laoghaire, Co. Dublin 03 December, 2015

Introduction Review of Public Works Contracts commenced December 2013 May 2014 on-line questionnaire launched December 2014 GCCC published “Report on the Review of the Performance of the Public Works Contract” April 2015 report on implementation of the interim measures (Construction Procurement Policy Unit of the Office of Government Procurement)

Introduction (cont’d) Interim Measures made: “In recognition of the changed market and to encourage more realistic pricing of public works projects…”

What are the four Interim Measures? 1. Making Bill of Quantities (“BoQ”) primary reference document for tender purposes on Employer designed contracts 2. Direct tendering of specialist works packages where: significant proportion of the overall Project value; or significant impact on the long-term performance of the Project 3. Greater concentration on quality criteria directly linked to the Project to deter unsustainable pricing 4. Informal dispute resolution methods Will discuss three of them today

Interim Measure 1 BoQ primary reference document for tender purposes on Employer designed contracts

Interim Measure 1: BoQ Currently, Employer has option to transfer the risk of quantities to Contractor (PW-CF1, PW-CF3 and PW-CF5) Proposal is to remove this option, making the BoQ the primary reference for pricing purposes in Employer designed contracts Production of a BoQ will be mandatory for PW-CF1, PW-CF3 and PW-CF5

Interim Measure 1: BoQ (cont’d) Contractor will be able to rely on the BoQ to arrive at the tender sum Drawings and specifications remain primary reference documents as to the scope of the Project

Interim Measure 1: BoQ (cont’d) Where a Works Item is described in the drawings or specification but not included in the BoQ: Employer’s Representative (“ER”) may direct the work to be completed and Contractor is entitled to an adjustment in accordance with Clause 10 ER or Employer may direct Contractor not to complete the Works Item in which case there is no adjustment to Contract Sum

Interim Measure 1: BoQ (cont’d) Where a Works Item is described in the BoQ but has not been included in the drawings or specification: Employer or ER may direct Contractor to complete the Works Item in which case no entitlement to an adjustment to the Contract Sum Employer or ER may direct Contractor not to complete the Works Item in which case Contract Sum is adjusted

Some further comments: BoQ All elements of the work are to be described in the BoQ prior to going to tender under an unamended, agreed method of measurement ARM4 for building works; CESSM3 for standard civil engineering works; and TII’s MMRW for road construction

Interim Measure 1: BoQ (cont’d) Clause 3(a)(i) GDLA ‘82 “If the Articles of Agreement provide for the inclusion of the Bill of Quantities as a Contract Document then the Contract Sum shall be deemed to provide for the quality and quantity of work set out in the descriptions and quantities in the Bill….”

Interim Measure 1: BoQ (cont’d) Clause 3(a)(i) GDLA ’82 (cont’d) “…The Bill unless otherwise expressly stated shall be deemed to have been prepared in accordance with the Method of Measurement of Building Works last before issued or approved by the Society of Chartered Surveyors in the Republic of Ireland and the Construction Industry. …”

Interim Measure 1: BoQ (cont’d) Clause 3(a)(i) GDLA ’82 (cont’d) “…Any error in description or quantity in the Bills of Quantities or any omission of items therefrom shall not vitiate this Contract but shall be rectified and the rectification treated as a variation under Clause 13 hereof….”

Some further comments: BoQ (cont’d) Inclusion of provisional sums, provisional quantities, or provisional descriptions within the BoQ in lieu of adequate design not permitted except with permission of GCCC and where temporarily used until the successful completion of direct tendering of a specialist by the Employer for the purposes of nomination or novation All such sums must be converted to lump sums prior to finalising the Main Contract

Interim Measure 2: Nomination Direct tendering of specialist works packages

Interim Measure 2: Nomination Proposed to be permitted where: specialist works make up a significant proportion of the overall Project value; or where they have a significant impact on the long-term performance of the Project Proposes an addition to the existing provision for novation Specialists would be nominated to the Main Contractor as sub-contractors

Interim Measure 2: Nomination (cont’d) Tendered price for the specialist work package will either: be included in the Pricing Document in advance of the Main Contract tender if the specialist works tender is concluded prior to the Main Contract tender; or by way of an adjustment to the Main Contractor’s Tender Sum in advance of setting the Contract Sum by means of substituting the specialist works tender sums in place of the pre-determined Prime Cost Sum(s)

Interim Measure 2: Nomination (cont’d) Currently forms PW-CF1 to PW-CF5: allow for a separate tender process for specialist work packages following tender process, Employer awards a public works contract to a specialist; understanding is that the contract will be novated to the Main Contractor who will take the place of the Employer

Interim Measure 2: Nomination (cont’d) Main criticism is that the public works contract is a Main Contract form and does not suit the nature of sub-contract works, once novated Reverting (but not fully) to the concept of nomination: Employer carries out tendering procedure Main Contractor obliged to enter into a sub-contract with the nominated specialist form of industry agreed sub-contract

Interim Measure 2: Nomination (cont’d) Proposal is to adopt the “Conditions of Sub-Contract (NN)” published by the CIF Acknowledged that, along with the domestic sub-contract form, they are the most used between sub-contractors and main contractors where the Public Works forms of contract are used Tailored for the nature of a traditional sub-contract relationship Reflecting the conditions of the Public Works Contract

Interim Measure 2: Nomination (cont’d) Collateral warranties will be required between specialists and Employer Employer brings the tendering procedure to the point of confirming the successful tenderer but does not enter into a formal contract

Interim Measure 2: Nomination (cont’d) Is this the end of novation? No. Novation still useful where early engagement of specialists is required, particularly with a significant design input A contract in those circumstances must be awarded because payment is required for the performance of the contract If novation is used, the novated contractor will provide a collateral warranty to the Employer

Interim Measure 2: Nomination (cont’d) Provision or PC sums may be used in the Main Contract tender but only up to the point of award of the Main Contract This is for the purposes of establishing an approximate cost for the tendering contractors of the nominated specialists’ packages Full cost of any nominated specialist works established via the conclusion of a tendering process in advance of signing the Main Contract

Interim Measure 2: Nomination (cont’d) Including PC or provisional sums in the BoQ post–award of the Main Contract only allowed in exceptional circumstances Examples include specialist fit-out works in large hospital projects where the rate of technological development not conducive to awarding the specialist contract at the same time as the Main Contract

Interim Measure 2: Nomination (cont’d) Limited grounds for objection by a Main Contractor to the appointment of a nominated specialist: inability to provide any bond inability to provide tax clearance or any other evidence to demonstrate compliance with legal requirements inability to provide the insurances required change in circumstances of a nominated specialist such that they would not meet the standards on which they prequalified

Interim Measure 2: Nomination (cont’d) Default of a nominated sub-contractor will result in no relief for the Main Contractor Main Contractor responsible for replacement of any nominated sub-contractor Contrast with GDLA ‘82

Interim Measure 2: Nomination (cont’d) GDLA ’82 (Clause 16(f)) “… if a nominated sub-contractor before final completion of a sub-contract commits an act of Bankruptcy or being a company enters into liquidation whether compulsory or voluntary (except liquidation for the purpose of reconstruction) or if a Receiver is appointed the Contractor shall not be liable for any increase in the cost of sub-contract work that may arise by reason of the necessity to have the said work completed by another Sub-Contractor.”

Interim Measure 2: Nomination (cont’d) Will the specialists provide a bond to the Main Contractor? Clause 1(i)(1) of the CIF Conditions of Sub-Contract (NN) makes provision for a bond of 25% of the Initial Sub-Contract Sum Under GDLA ’82 there was possibility of direct payment combined with a form of collateral agreement (“Green” form) Under new arrangement, no mechanism for direct payment of nominated or novated specialist sub-contractors

Interim Measure 2: Nomination (cont’d) Reliance on mechanisms in the Construction Contracts, Act 2013 instead However each Payment Certificate to the Main Contractor will be accompanied by a breakdown of the amounts included in that payment for each of the nominated or novated specialists

Interim Measure 3: MEAT Greater concentration on quality criteria directly linked to the Project to deter unsustainable pricing

Interim Measure 3: MEAT (cont’d) Quality Criteria anticipated Contract Sum of €2,000,000 or greater quality and long-term performance of certain Works Items could have a significant effect on the outturn costs of the Project at the end of its life examples: lifts, window systems, roofing systems, building management systems.

Interim Measure 3: MEAT (cont’d) The new measure mandates the inclusion of the quality of integral project elements as an effective MEAT award criteria Tendering Authority select specific Work Items to be considered Tenderers will be required to name each product/material they propose to use in response to the category of Works Item inserted by the Employer provide supporting evidence of the performance (data sheets, certified test results) as part of Works Proposals

Interim Measure 3: MEAT (cont’d) The products/materials proposed which meet the specification pass the criterion with additional marks (up to a stated maximum) awarded to products/materials under pre-determined performance sub-criteria Examples of sub-criteria may include minimum life guarantee minimum parts warranty maximum energy consumption maintenance cycle availability of after sales and technical support

Interim Measure 3: MEAT (cont’d) Contracting Authorities advised not to: draft minimum performance criteria so as to close the specification to a single available product/supplier in the market name a product/supplier as a way of setting minimum performance specification allow the weighting of marks for quality such that price is no longer the majority weighting (except in complex or innovative projects)

Interim Measure 3: MEAT(cont’d) Interim Measure 3 is seen as a longer term goal OGP plan to invite industry stakeholders to sit on a working group to further expand the measure

Conclusion Back to the Future? Not quite…. Thank you Kevin Kelly kevin.kelly@mccannfitzgerald.ie Direct +353-1-607 1205

Irish Construction Law Conference 2015 Kevin Kelly Royal Marine Hotel, Dun Laoghaire, Co. Dublin 03 December, 2015