Presenter name affiliation

Slides:



Advertisements
Similar presentations
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Advertisements

COMP4710 Senior Design Process Documentation and Deliverables.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 Framework Programme 7 Guide for Applicants
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
MODERN Final Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v3.7 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4: Davide.
MODERN 1 st Year Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4:
Teaching and Learning Conversations your name Your job Your Institution Your contact details ( /twitter/website) a photograph of you title of your.
Case study of a successful proposal Rob Davies. Parts of a proposal Part A - Proposal Administrative Overview - forms Part B- Description of objectives.
Progress Reports. Schedule m m.
Detailed description of your H2020 project Description of the action (Annex 1) Estimated budget for the action (Annex 2) Ulrich Genschel European Commission.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Beneficiary data are imported from your proposal.
Progress presentation
© Services GmbH Proposal writing: Part B 2/1/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
UNCLASSIFIED DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government Agencies and their contractors. Other requests for this document shall.
Midterm/Final Presentation Project Name Students: [Name1], [Name2] Supervisor: [SV Name] Context: Project [A/B/Special] Semester: Winter/Spring, Year Date:
WP4 Monitoring Luis Delgado. SGU – MECD Kick-off Meeting. HERE-ES Project Madrid, 2 February 2015 HERE-ES WP Breakdown.
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
ARTEMIS Industry Association Title Presentation - 1 e.g. SCALOPES e.g. SCAlable LOw Power Embedded PlatformS.
WP3 - Evaluation and proposal selection
UNISEC Universal Influenza Vaccines Secured
EC project periodic and continuous reporting
Title Layout Subtitle.
CS260 Data Mining Using Tensor Methods 00 – Paper Title
WP-X XFEL Project Progress Report (2014-3)
Annual Report Instructions
[Project Name] [Presenter Name]
WP1 INERTIA Framework Requirements, Specifications and Architecture
Guidelines and Template for project oral presentation
Title Layout Subtitle.
Guidelines and Template for project oral presentation
Presentation Title Author(s) Name and Department Affiliation
Micro data linking – call for proposal item 12 of the agenda
[Project Name] [Presenter Name]
WP X [Presenters] Engine ITD Annual Review June 5-8, 2018
Table Figure Figure Organization Logo TITLE Authors
[Project Name] [Presenter Name]
Insert subhead here Project Status.
REPORTING and PAYMENT (in practice)
[Authors] [Affiliation]
[Project Name] [Presenter Name]
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Title Layout Subtitle.
[Team Name] Monthly Technical Report [Safe Genes Program]
Title Layout Subtitle.
Title Layout Subtitle.
Full Title of Research Proposal
Table Figure Figure Organization Logo TITLE Authors
Title Layout subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Title Layout Subtitle.
Submission Title with Capitalized Words and No Symbols
Presentation Title Author(s) Name and Department Affiliation
Project Kick-off <Customer Name> <Project Name>
Title Layout Subtitle.
Title Layout Subtitle.
Progress Reports.
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
Title layout Subtitle.
Action title DUMMY SLIDE DUMMY SLIDE DUMMY SLIDE Situation
Key Activities/ Milestones
Presentation transcript:

Presenter name affiliation Workpackage x Presenter name affiliation

Workpackage x - Agenda WP Introduction/Overview (main objectives, tasks, interdependencies…) 1~2 min Description of work done by task, with contribution by partners, key achievements and highlights (incl. technical details and TRL, dissemination and exploitation activities) 20~30 min Plans for the next period (by task) Risk analysis and mitigation actions update 5~8 min Changes to the initial plan occurred or foreseen (if any) Questions and Answers 20 min or more (time permitting) 1 hour slot including discussion, Q&A

WPx Introduction Outline the main WP objectives, and tasks Highlight key aspects of the plan for the period at WP level and links with other WPs, e.g. from the PERT diagram Summarize deliverables and milestones achieved in the period Present an overview of main interactions between beneficiaries occurred in the period

WPx – Task x.y Progress status <Task title> (leader <name of the task leader>) Summarize task activities by partners (use each contributing partner’s names or logos) with key findings and results of the period. Use at least one slide per each active task

Planning for next period WPx – Task x.y Planning for next period <Task title> (leader <name of the task leader>) Outline the plan of the task for the next period (with expected contribution from beneficiaries, and major changes expected) Use at least one slide per each active task

Proposed risk-mitigation measures WPx Risk Analysis (see critical risks register in the GA or in the EC portal) # Description of Risk (copy/paste from the GA/EC portal) L S WPs involved Proposed risk-mitigation measures (add here your update of the risk status and mitigation actions implemented in the period ,or suggest changes in the table, to e.g. modify description likelihood, severity, add new risks, or new mitigation plans, etc.)

Other WPx information (add slides as needed) e.g. meetings, events, list of people, new publications, new patents, etc.