Proactive Residence Hall Work Order Program

Slides:



Advertisements
Similar presentations
Date Title (Select Purpose of your SWOT) Your Name Here.
Advertisements

Mission Our Mission is to provide our campus and community with the best college dining experience, while using high cost local food but minimizing the.
Central Plant 5S Project Back Storage Area Spring 2014.
1 Introduction to Workforce Planning and Development in State of Alaska Executive Branch Departments.
Career Development Graduate School Funding Form Project Berea College Center for Transformative Learning James Atkinson & Channing Francis July 2014.
NTR STRATEGIC PLAN. Strategic Planning is a process by which an organization or a business can plan its activities or work product in such a way as to.
1 Chapter 3 Project Organization, Selection, and Definition.
Aligning Training with Strategy
Mission Our mission is to utilize multimedia to support the college’s marketing and communications initiatives, particularly in enhancing the college’s.
FM 5S Project Housekeeping equipment storage
Introduction to Hospitality, 6e
Leaders Facilitate the Planning Process
FM Work Orders Parts Acquisition Project. Mission of FM FM exists to assure that Campus buildings and grounds enhance learning and meet compliance requirements.
Mission Our Mission is to provide our campus and community with the best college dining experience possible, while using as much local food on our campus.
Presented by Thomas. What is HR Department HR Departments are the entities organizations that organize people, report relationships, and work in a way.
Technology Use Plan Beta Group Collaboration Sarah Miller, Erin Okazaki, Dann Mosteller.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Central Plant 5S Project Tool Storage Area
SWOT Analysis. What is a SWOT A strategic planning method used to evaluate a project or business venture. YOU must first start by defining a desired end.
HRD Strategies “ HRD Strategies are a plan that defines how the human resources would be utilized through the use of an integrated array of training, organizational.
33 3. IS Planning Issues Scope of IS planning Barriers in IS planning Overview of IS planning Inputs to IS planning Process of IS planning Outputs from.
Health Management Dr. Sireen Alkhaldi, DrPH Community Medicine Faculty of Medicine, The University of Jordan First Semester 2015 / 2016.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Key Request Project. Mission To maintain an efficient key record system that documents access to locks on campus Vision Public Safety strives to continually.
Cynthia Cherry Welcome to MT 140 Unit 6 - Control.
+ CIW Lesson 10 PART A. + IT Project and Program Management Successfully managed IT projects increase productivity and increase profits IT projects differ.
Oversight & Assessment Campus Workplace Safety. Mission Our mission is to provide a safe workplace for students or staff. Vision Our vision is to create.
FM Work Orders Parts Acquisition Project.
Mission Our Mission is to provide our campus with the best college transportation experience, including safety, cleanliness of vehicles, and transactional.
NSGC Liaison Orientation Welcome!
Calls for Svc Mission Calls for Svc Vision
Mission Our Mission is to provide a safe and clean working environment to craft and create wood craft products for sale that will expand the circle of.
Mission Our Mission is to provide sufficient throughput to allow the student crafts warehouse to ship broom craft products within 48 hours from the time.
Leaders Facilitate the Planning Process
Mission Partners for Education (PFE), is devoted to fulfilling Berea College’s Great Commitment to providing educational opportunities for all students.
Managing the Planning Process
Darren Blagburn, Institutional Effectiveness x1846
TECHNOLOGICAL EDUCATION Long Range Planning
Heather Millet IS&S Senior Banner Analyst
Convocation Attendance Process
Mission Our Mission is to provide our customers with the highest level of customer service by packing and shipping customer orders with zero defects. Vision.
Travel Miles Expense Form
MARKETING IMPLEMENTATION  Marketing implementation is the process that turns marketing plans into action assignments and ensures that such assignments.
Strategic Planning: A Tool for Fire Department Success
Mission Our Mission is to provide our campus and community with the best college dining experience, while using high cost local food but minimizing the.
Input your Massage Text / Input your Massage Text
CHAPTER 7: The Manager as a Planner and Strategist
SWOT Analysis Use this space for description of Strengths: Point 1
Work experience program
به نام خداوند بخشنده مهربان
Bernadine Douglas Development V.P. for Alumni and College Relations
Amanda Tudor Career Development Director of Career Development
Mission Our mission is to utilize multimedia to support the college’s marketing and communications initiatives, particularly in enhancing the college’s.
کنکور کارشناسی ارشد 93 مدیریت
Roadmap to an Organizational Culture of QI
الفصل السادس التخطيط الاستراتيجي الأنشطة التسويقية
نظام تحسين العمليات المستمر وفرق العمل
Gaining Ground with Universal Design for Learning
כלי אבחון.
التخطيط الاستراتيجي الأنشطة التسويقية
FY 08 Facilities Department Budget Proposal January 25, 2007
Water Services Trust Fund
Mission Our Mission is to provide our campus and community with the best college dining experience, while reducing food waste to insure stable/low board.
Management, Leadership, and Internal Organization
Amanda Tudor Career Development Director of Career Development
Palisade High School…….Who we are
How to conduct Effective Stage-1 Audit
Portfolio, Programme and Project
SWOT ANALYS.
Presentation transcript:

Proactive Residence Hall Work Order Program Facilities Management

Mission Our mission is to provide student housing that is safe, clean, and fully operational on the day students arrive to campus. Vision Our vision is to provide timely service throughout the year by responding to Residence Hall work orders in a proactive as opposed to reactive manner.

Charter Mission – Have the dorms fully prepared for the students upon arrival. Burning platform – Residence halls that are fully prepared and maintained for student occupancy will make a less stressful and easier transition. Process Description – Facilities Management responds to problems the students find in the dorms once they arrive. Problem Statement – An effective way to assess the readiness of residence halls needs to be created in order to make the necessary repairs and preparations prior to the arrival of the students. Sponsor – Wayne Orr Process Owner – Jeff Reed Team Leader – Aaron Beale Facilitator – Erin Powers Team – Aaron Beale, Richard Smith, Erin Powers, Steven Peters, Tim Alexander, Rodney Hensley IT solutions around the corner?

Proactive Residence Hall Work Order Program The goal of this program is to shift the focus of our department to a more proactive approach to readying the Residence Halls for student arrival. We propose that by working proactively we will gain efficiency by reducing travel time and duplicated efforts by different trades, create a higher more consistent standard across Campus, and prevent the “flood” of work orders that has traditionally slowed response time at the beginning of each semester.

SIPOC Suppliers Inputs Process Outputs Customers Students RA’s FA’s Collegium Work order requests submitted by suppliers. Current state requires a reaction to information from suppliers listed. This information tends to “flood the system” all at the same time, and is of inconsistent quality. Clean, well maintained, fully functional residence halls. Students, RA’s FA’s Collegium

SWOT Analysis Internal External Strengths Weaknesses Opportunities Skilled tradespeople capable of making the required repairs and upgrades to living areas. Adequate funding to accomplish the desired goals. Technicians often feel overwhelmed by the quantity of work necessary to achieve a desired standard. Work has traditionally come in great “floods” and is typically handled reactively. Internal Strengths Weaknesses Opportunities Threats External Prevent the likelihood of overwhelming our technicians by beginning to work in a pro-active manner. Reduce travel or “windshield” time by controlling the pace and schedule of repairs by evaluating and conducting repairs during the summer months. Achieve a more consistent standard across Campus by having our technicians be the initial reporters as opposed to the suppliers listed in our SIPOC description Resistance to change. Cultural shift necessary on the part of technicians and management to become problem “seekers” as opposed to “responders”.

Hi-Level Process Map Students arrive on Campus Deficiencies noted, work order request submitted Work order created, Technician dispatched. Work completed. Often requiring multiple trips for parts, etc. Work completed .

Current State Spaghetti Diagram Numbers in white boxes = number of trips technicians make per year

Analysis of Work Orders (Number of work orders per dorm each year)

Analysis of Work Orders (Number of work orders per dorm each year)

Future State Spaghetti Diagram Numbers in white boxes = number of trips technicians make per year

Standard Work

Results from Waste Elimination Old process steps: 10 New process steps: 5 50% reduction Old process NVA steps: 8 New process NVA steps: 3 37.5% reduction

Savings 44% reduction in total dorm work orders Largest reduction: 75% (Danforth) Soft Savings: $14,794 Hard Savings: $13,948