Track 2 Working Group 4th Meeting

Slides:



Advertisements
Similar presentations
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
Advertisements

1 Global Real Estate Valuation Policy Update: the European Perspective The principle: the EU Treaty does not provide the European institutions with direct.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Marcy Mealy Procurement Specialist CDBG Program
Bryan Warren 4/28/15 SoCalGas To-Code Pilot Status Update: Development of Concept 1.
BASELINE POLICY FRAMEWORK Dina Mackin, CPUC Workshop on Energy Efficiency Baselines April 28, 2015 California Public Utilities Commission1.
IS Audit Function Knowledge
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
1 Ex Ante Review of the SBD Program Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting.
Methodology for Energy Savings claim for Incentive Programs and Codes & Standards(C&S) accounting Presented by: Armen Saiyan P.E. For the California Technical.
ASSESSMENT IN EDUCATION ASSESSMENT IN EDUCATION. Copyright Keith Morrison, 2004 PERFORMANCE ASSESSMENT... Concerns direct reality rather than disconnected.
2 California Solar Initiative Latest Handbook Changes The slides for today’s presentation can be downloaded/printed at
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
ECONOMIC DEVELOPMENT SERVICES SOUTHERN CALIFORNIA EDISON Leading the Way in Electricity | Business Customer Division 1 For External Use Economic Development.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application Presentation to the Low Income Oversight Board November.
1 CSI Staff Proposal Workshop Energy Division California Public Utilities Commission November 17, 2010.
RBIG WORKSHOP 1 Supply Chain and Asset Management.
Department of Community and Senior Services Jason Stempinski, CIA Compliance Manager COST ALLOCATION PLAN Presented by:
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Principal Investigator ESTCP Selection Meeting
Allocation of Support Department Costs, Common Costs, and Revenues
Wellness Plan Regulations June 2015.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Overview of MSBA Building Process and Project Timeline
Overview of MSBA Building Process and Project Timeline
Self-Generation Incentive Program (SGIP)
SCE “To-Code” Pilot Lessons Learned
PLWG Review 6.9 and the Interconnection process
Post Award Peer Review Briefing Slides
Fair Go Rates System Dr Ron Ben-David Chairperson
EE Third-Party Solicitation Process Workshop Solicitation Alignment
NC AWWA-WEA 97th Annual Conference
Track 2 Working Group 2nd Meeting
Track 2 Working Group 4th Meeting
CHAPTER 6 Audit Evidence
Principal Investigator ESTCP Selection Meeting
Presentation to the Portfolio Committee on Finance
Ex Ante Review Overview
Workshop Presentation
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Cost or pricing data John Cancellara 7 March 2018.
Action Request (Advice) Registry
Fixed Assets (Capital Assets)
Recommended Draft Policy ARIN : Post-IPv4-Free-Pool-Depletion Transfer Policy Staff Introduction.
Fair Go Rates System Dr Ron Ben-David Chairperson
Recommended Draft Policy ARIN : Eliminate HD-Ratio from NRPM
Cambria Armor Dividend Strategy Cambria Armor Growth Strategy
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Regulatory History of Cost Effectiveness
How to conduct Effective Stage-1 Audit
Communication campaign
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
Unemployment Insurance Integrity Performance Measures
Recommended Draft Policy ARIN : Transfers for new entrants
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Performance improvement observations
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
SPOT CHECKS 2016.
Role of the Internal Verifier
Post Award Peer Review Briefing Slides
PRODUCT CRITERIA COMMERCIAL BRIDGE FINANCE
Presentation transcript:

Track 2 Working Group 4th Meeting Energy Division Staff and Contractors Energy Efficiency Industrial/Agricultural Programs and Portfolio Forecasting California Public Utilities Commission May 24, 2017

Network: SE-Visitor Keycode: xekx5199

Task 3: repair-eligible/indefinitely Resolution E-4818 Order “14. We adopt the working group proposal that accelerated replacement is comprised of three sub-categories: early replacement, repair eligible, and repair indefinitely, which shall use equivalent dual baseline savings and cost effectiveness calculations for deemed and calculated downstream programs. 16. We permit the Program Administrators to apply an accelerated replacement baseline treatment to equipment that qualifies as repair eligible or repair indefinitely where the equipment is older than its predetermined effective useful life. 25. … We ask the Track 2 working group to address the following in their deliberations and recommendations, and that recommendations be presented to Commission staff no later than June 30, 2017: Develop qualification standards and documentation requirements to identify repair eligible and repair indefinitely measure types.”

Task 3: repair-eligible/indefinitely Implementation Issues: Do we need separate names or can these both be combined into a single wider defined category in terms of treatment in submissions of proposals for treatment of projects/measures as repair eligible or repair indefinitely? Or are there good reason to keep separate and consider proposals in a separate manner? A class of equipment where the age of the equipment relative to its EUL has reduced (less or little) weight in the consideration of evidence for treatment as accelerated replacement. This is not to imply that the age of the equipment has no weight, but rather that if the age exceeds the EUL that alone cannot automatically disqualify the project for consideration using an AR treatment.

Task 3: repair-eligible/indefinitely Implementation Issues: It is preferred to have an approach that allows “pre-qualification” of equipment types as eligible while allowing simplified site specific criteria CPUC will develop a submission/review/approval process for the PAs to submit equipment types that are proposed for this treatment Submittal would include the equipment types (reference to specific measures, workpapers, etc.), the programs authorized to use the treatment, the evidence supporting the treatment and the criteria that will be used at the site/project/measure level to qualify specific equipment.

Task 3: repair-eligible/indefinitely Primary change from past treatment: Equipment that is older than its effective useful life may qualify for an accelerated replacement baseline treatment where it is determined the equipment is either repair eligible or repair indefinitely. Important considerations at portfolio/program/activity level (supported by current/recent evidence): Standard practice for repair versus replace in the market segment of interest; Functionality and feasibility of repairs. Non-energy considerations that impact the customer decision process (as much or more than energy cost considerations) Typical repair versus replace payback from the customer perspective

Task 3: repair-eligible/indefinitely Project level parameters or information of interest Recent history of repairs/costs and anticipated repairs Reliability may have cost implications past equipment maintenance Replacement cost versus repair cost There may be lead-time and/or down-time considerations that can be different and important in the comparison Impact of repair versus replacement on maintenance costs Energy savings Effective useful life of existing and replacement equipment policy limit of 20 years may have caused reduction for of life for major capital projects – i.e., industrial processes Remaining useful life of existing (with and without repair) equipment

Task 2: repair-eligible/indefinitely Level of rigor depends on incentive level Program submission requirement may always be high while project level criteria may vary greatly by incentive dollar amount Program submissions must fully describe project eligibility criteria with examples, process to be followed to establish eligibility, and documentation archiving requirements Project criteria should always include a consideration of the items on the previous slide. However, lower incentive levels, as with PoE tiers, should have a much lower level – and in some cases very limited – of requirements.

Task 3: POE Evidence for Tier 1-2 Resolution E-4818 Order “8. For all downstream programs, we direct the Program Administrators to maintain site-specific records for program activities and installations resulting in energy savings. These records must include utility account number, installation site address, and evidence required by the applicable preponderance of evidence standard. In some cases, preponderance of evidence standards will consist of evidence of program eligibility. 22. We adopt a tiered approach to the preponderance of evidence, with three tier levels corresponding to the rigor of the assessment: Full Rigor for projects with incentives over $100,000; Tier 1 Medium Rigor for projects with incentives between $25,000 and $100,000, and Tier 2 Lower Rigor for projects with incentives less than $25,000.”

Task 3: POE Evidence for Tier 1-2 Resolution E-4818 Order “23. For purposes of determining the appropriate tiered incentive treatment, CPUC staff have discretion to aggregate applications when they are from the same customer and appear to be the same project. 24. We do not adopt the specific preponderance of evidence requirements for Tier 1 and Tier 2, as outlined in Section 6 of the working group guidance. For this reason, we prohibit the use of a tiered approach to the preponderance of evidence requirements until specific requirements for the tiers are adopted.”

Task 3: POE Evidence for Tier 1-2 Resolution E-4818 Order “25. … We ask the Track 2 working group to address the following in their deliberations and recommendations, and that recommendations be presented to Commission staff no later than June 30, 2017: Develop recommendations for what should constitute Tier 1 and Tier 2 Preponderance of Evidence requirements.”

Task 3: POE Evidence for Tier 1-2 “Despite agreement on using a tiered approach and in defining them with the incentives values in the bullets above, the working group was not able to agree on what would constitute sufficient documentation standards for the lower rigor tiers (i.e. Tier 1 and Tier 2). Parties could not agree as to whether the lowest rigor tier would involve an interview conducted by an independent third party, or program administrator, or implementer. There were also differing perspectives on whether the questionnaire should be program specific or general, whether the language in the questionnaire should indicate there would be consequences for misrepresenting facts, and even whether an interview should be conducted at all. Working group facilitators present their best approximation of a ”middle ground” solution, representing no one perspective nor a negotiated compromise. We do not adopt these policies because there were such large differences in the related opinions of different stakeholder groups on these issues, and we feel the policy requires further development before it can be adopted.”

Task 3: POE Evidence for Tier 1-2 Three Categories of Evidence/Documentation Requirements – Commission Staff Perspectives Note: The level or rigor and detail of elements in each of these categories is expected to vary greatly by the dollar amount of the incentive (or other costs) paid via ratepayer funds Equipment condition and ability to remain in service meeting customer requirements for its RUL Examples types of evidence Photos/Videos Current and past maintenance and repairs history/records and costs Operating data Reliability history and issues Information on current plans or budgeting for expansions, remodels, replacements

Task 3: POE Evidence for Tier 1-2 Three Categories of Evidence/Documentation Requirements – Commission Staff Perspectives Note: The level or rigor and detail of elements in each of these categories is expected to vary greatly by the dollar amount of the incentive (or other costs) paid via ratepayer funds Establish program influence to accelerate Documentation establishing customer choice of a lower efficiency lower cost alternative prior to program intervention; and/or Survey, questionnaire or interview to reveal the customer decision process and how the activities program influenced a change in choice either by information on alternate choices or financial support (or both) Done by (or in lower incentive projects, confirmed by) non-financially interested (independent) party

Task 3: POE Evidence for Tier 1-2 Three Categories of Evidence/Documentation Requirements - – Commission Staff Perspectives Customer “Affidavit” Informs the customer that the treatment they are applying for involves requirements that exceed those of “standard” offerings and requires addition information to confirm eligibility; but that they may eligible for the “standard” offerings independent of their eligibility for this offering Legal language confirming the accuracy of the information they supply that is used to make the determination of eligibility for AR treatment Provides for “consequences” of contrary findings – eligibility for AR treatment on the subject project impacted