Sheldon (Maple to Library) Preferred Design Meeting 12-6-16
Introductions Breese Stam – City Engineering Wes Steer – OCBA Jon Re – City Traffic Safety Layla Aslani – City Community Engagement
Agenda Introductions Project Overview Meeting and Survey Results Preferred Design Discussion
Project Overview
Project Limits Maple to Library North
Construction Sheldon (Weston to Fulton) – reconstruction in 2017 Other sections to be reconstructed in the coming years Upgrade sidewalks and ramps to be compliant with the Americans with Disabilities Act North
Approximate Funding Sheldon (Weston to Fulton) Total Cost ≈ $927,492 Sewer ≈ $268,000 DDA ≈ $268,000 Vital Streets ≈ $199,492 Water ≈ $192,000
Meeting and Online Survey We’ve heard support for: changing the street from a one-way to a two-way between Maple and Fulton. maintaining the street as a one-way between Fulton and Library. installing bike facilities in the right of way. maintaining as much parking as possible with the new design. greening the street with the existing and/or new trees. keeping as much of the existing green space towards Maple as possible. not placing seating by the YWCA.
Preferred Design
Discussion
Contact Information Road construction website: grcity.us/roadconstruction City phone number: 311 or 456-3000