Hays County Commissioners Court

Slides:



Advertisements
Similar presentations
Mid-Bay Bridge Connector Phase II and III December 2011 Project Update.
Advertisements

South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Central Texas Turnpike Project. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike Project.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Boulder Rock Drive Crossing Rehabilitation Project - Structure F-2  Major Roadway Crossing Culvert Replacement November 17, 2015.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
State Route 342 Bypass and Realignment Solution Joint Effort of the Nevada Department of Transportation, Storey County, and Comstock Mining.
Concho River Improvements February 18, River Improvements Project Consideration of approving matters related to Concho River improvements: Review.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
2nd Street Drainage and Paving Improvements
Southwest Parkway and Chisholm Trail Briefings
Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
The Alabama Transportation Rehabilitation and Improvement Program
County Highway Accountant’s Conference 2015
DICKINSON AVENUE RECONSTRUCTION
Fort Worth City Council
Renovation & Expansion
IA 122 RECONSTRUCTION PRE-BID MEETING
US26: Cornelius Pass Rd -185th Ave
Punch list / Close Out - Project Completion
TxDOT ACEC Joint Educational Program (Dallas/Ft. Worth) Winter 2018
Pinole-Hercules Water Pollution Control Plant Upgrade Project
SW Gage Blvd - Street Repair Project
August 28, 2018.
projects update ATLANTA district
October 11, 2018.
Contract 60X10 Informational Meeting Weber I-55
West Hills Road Projects Update
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
Durham and Orange Transit Plan Funding Needs
September 13, 2018.
February 14, 2019.
Construction Considerations
Harbour Island Force Main Replacement
Commissioners Presentation
May 9, 2019.
Ward Park Restroom Timeline
June 13, 2019.
Presentation transcript:

Hays County Commissioners Court December 17, 2013

Hays County Commissioners Court Pass Through Financing Program Projects Update December 17, 2013

Projects in Design FM 1626 South (FM 2770 to FM 967) Engineer finalizing 90% PS&E for December 19th Plan Review with TxDOT TxDOT anticipated to complete coordination with USFWS in December Title reports have been received on all identified parcels and owner information has been updated Utility Coordination is continuing Letting anticipated 2014 Public Hearing – May 2014 LOA – July 2014

Projects Letting Yarrington Bridge (at IH 35) Let on October 9, 2013 and low bidder OHL USA, Inc. at $12.2M (15.5% under engineer’s estimate) Coordinated with TxDOT regarding contract execution – anticipated in January 2014 Continued utility coordination regarding agreements, costs & schedules – Update Meeting being scheduled for mid-January Continued coordination regarding final parcel needed for construction 2 more Utility Agreements for CPY/Cobb Fendley – PEC & Centurylink 1 Utility Agreement for revision – City of Kyle – added a betterment 2 Utility Agreements for City of San Marcos to support the ILA Payment in the amount of $237,018 due from COSM shortly (approved by Court on 10/15/13)

Completed Projects CR 210 (FM 2001 / IH 35 NB FR Connector) Submitted 8th Reimbursement Request to TxDOT Amount Due = $341,086.00 Reimbursement To-date = $2.82M (16%) Max Reimbursement = $17,747,920

Precinct 1

IH 35 Phase 2A (RM 150 Realignment) Granted Substantial Completion: October 1, 2013 Final Engineer’s Estimate = $4,460,492.85 Original Contract Price = $3,483,074.33 Total Executed Change Orders = $48,253.51 Total Paid To-Date = $3,578,167.27 Anticipated Final Contract = $3,594,302.63 (3% Over Original Contract, 19% Under Estimate) General Clean-up, Additional Seeding, Additional Soil Retention Blankets, Ty I Thermoplastic Pavement Markings, Completed small sign installation, removed temporary signs, Bonus/Penalties associated with Placement & Production of the Asphalt ($14,643.62), total payment = $42K Due to rains, added riprap on the south side of the bridge, including toe wall. Final K will be more than 19% below the final engineers estimate.

FM 110 (McCarty Lane to SH 123) Anticipated Completion Date Mid-January 2014 Ribbon Cutting: January 17, 2014 Original Contract Price = $6,493,407.10 Total Executed Change Orders = $17,682.00 Adjusted Contract Price = $6,511,089.10 Work Completed to Date = $5,189,443.56 (80%)

Mixing Lime into Subgrade on the East of SH 123 FM 110 (McCarty Lane to SH 123) Mixing Lime into Subgrade on the East of SH 123

Placing Rock Riprap at end of Box Culvert FM 110 (McCarty Lane to SH 123) Placing Rock Riprap at end of Box Culvert

Asphalt Prime on Completed Flex Base East of SH 123 FM 110 (McCarty Lane to SH 123) Asphalt Prime on Completed Flex Base East of SH 123

Precinct 2

IH 35 Phase 2B (FM 1626 to Yarrington) Granted Substantial Completion: October 1, 2013 Final Engineer’s Estimate = $8,132,391.01 Original Contract Price = $6,298,068.75 Total Change Orders to Date = $86,989.41 Total Paid To-Date = $6,473,100.82 Anticipated Final Contract = $6,569,643.75 (4%) (4% Over Original Contract, 19% Under Estimate) General clean-up, completed the Ty 2 striping (paint), poured concrete riprap, replaced concrete mow strip on the SBFR, cleaning out construction yard, placed buttons, began placing the Ty 1 thermoplastic striping. Total October = $70K Final K will be more than 19% below the final engineers estimate.

FM 1626 North (FM 967 to Brodie Ln) Anticipated Completion Date Late 2014 Original Contract Price = $17,235,782.15 Total Change Orders to Date = $47,231.44 Adjusted Contract Price = $17,283,013.59 Work Completed to Date = $6,375,113.58 (37%)

FM 1626 North (FM 967 to Brodie Ln) Placing Base Course Asphalt on South End

FM 1626 North (FM 967 to Brodie Ln) Completed Reinforcing Steel for Bridge Deck Pour 1

FM 1626 North (FM 967 to Brodie Ln) Repair Erosion Controls and Flood Damaged Areas

Precinct 3

Precinct 4