Project name Steering Committee dd month year

Slides:



Advertisements
Similar presentations
Creating A Business Plan Computers In Business Created by Carey Ivory 2010.
Advertisements

Presentation Instructions
Chapter 2 Analyzing the Business Case.
Content Framework for the Committee Report Using PowerPoint to prepare a formal committee report John A. Cagle.
Analyzing the Business Case
By Saurabh Sardesai October 2014.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
 A written document that specifies how, where, and to whom a business plans to market its product(s) and/or brand(s).  A small business typically creates.
Barry Murash MBBit Nortel 2007
Office of Project Management Metrics Report Presentation
To use this PowerPoint you will need the following documents found in this module: OIP Stage 3 for the BLT The BLT 5-Step Process Visual The BLT 5-Step.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
OHT 25.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The quality assurance organizational framework Top management’s quality.
Being Rated as Outstanding for Governance: A workshop for the Cornwall Governor Network Conference Bob Damerell
Project Title Team Leadname Team MembersMember names Process Ownername Championname Insert your company logo here.
Name of Presentation Click to add subtitle. Your company slogan LOGO Table of Contents 1 Introduction 2 Strategy 3 Challengers Forward 4 Conclusion.
PowerPoint Template Your company slogan LOGO. Table of Contents Introduction 1 Main title 2 Examples 3 Conclusion 4.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Presenter Date Page Project manager The PROGRAM The Company Name 03/21/01 STOPLIGHT METRICS Stoplight Charts provide a means of communicating the status.
LOGO PowerPoint Template. Contents 1. Introduction 2. Strategy 3. Challenges Forward 4. Conclusion.
eMerger Integration Planning
Assessment Findings Validation Title of the Project (date)
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
Advanced Project Management Project Planning Phase Ghazala Amin.
Update on Monitoring IATI Steering Committee Meeting Copenhagen, 15 October.
商大师 Template Your company slogan LOGO Table of Contents 1 Introduction 2 Strategy 3 Challengers Forward 4 Conclusion.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Change Management A process for process change by Cory R. Peters Exelon PowerLabs.
General Guidelines for this Template Add the letter of the stage (DMAIC) you are in on EACH SLIDE. Don’t feel like you have to use the tools at the end.
Traffic Records Assessment Training August Advisory Updates Traffic Records Program Assessment Advisory update: Assessment participants have been.
Quantum Leap Project Management
On Campus Internship Work Plan Creation
Continuous Improvement Project (A Guideline For Sponsors)
Systems Analysis and Design in a Changing World, 4th Edition
Guidelines for NSPRC Presentations
Project Management 3. Project Management Plans
XXX – Diagnostic – 1 (Abstract)
Add Your Company Slogan
IS Project Management How to Close a TPM Project
Case Study: The Accounting Software Installation Project
Description of Revision
Guidelines for NSPRC Presentations
Project Organization Chart Roles & Responsibilities Matrix
YOUR LOGO YOUR COMPANY NAME COMPETITIVE ANALYSIS.
PowerPoint Template.
A Level PE Coursework.
[Project Name] Project Report
PowerPoint Template.
Template Name: ENGAGE™ Business Readiness Checkpoint Report
[Project Name] Project Gating Presentation
[Project Name] Project Report
Project Management Process Groups
Recommendations for using this ‘framework’ template
PowerPoint Template.
Organisational NRW Management
Marketing Management Indicator 1.03
DMAIC STANDARD WORK TEMPLATE
Assessment Needs Analysis
Study on non-compliance of ozone target values and potential air quality improvements in relation to ozone.
DMAIC STANDARD WORK TEMPLATE
Effective Project Management: Traditional, Agile, Extreme
Employee Engagement Defined
LOGO PowerPoint Template Your company slogan.
Add Your Company Slogan
TEMPLATE INSTRUCTION: DELETE AFTER READING
Project Progress Summary - Week 18
TEMPLATE INSTRUCTION: DELETE AFTER READING
PowerPoint Template.
Add Your Company Slogan
Presentation transcript:

Project name Steering Committee dd month year SUPPLIER LOGO Note : This presentation template is a suggestion for helping your company to prepare project steering committees. Since projects supported by SPACE are piloted by your company, it is strongly recommended to use your own company internal Powerpoint framework. Your company could then freely take from this presentation structure (partially or fully) to develop your own one. Your presentation would then be an in-house company document so that your people will then feel more involved when communicating it with them. Project name Steering Committee dd month year Author Month Year

Overall schedule Action 1 status Action 2 status … Action n status SUMMARY Overall schedule Action 1 status Action 2 status … Action n status Conclusion

Overall schedule

Action 1 status 1/2 RESULTS PROGRESS Mood : Trend : Insert chart(s) of the metric(s) defined for the action (with targets) PROGRESS Mood : Insert a visual status of the progress of the action : PDCA wheel, or DMAIC steps, or thermometer like : Trend : (ahead/late) Insert link towards the detailed tasks list of the action and/or the action charter 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Action 1 status 2/2 DONE Indicate what was done since previous steering committee Number of people trained : Number of man-hours used : NEXT STEPS ISSUES / REQUESTS Training, Technical, Resource, Expenses, Alerts/Risks ,… DECISIONS REQUIRED Validations needed from top management to go forward

Conclusion 1/2 Insert company metrics graph (with targets) : OTD, Customer returns rate in ppm ….

Requests / lessons for next : Conclusion 2/2 Strengths : … Weaknesses : Requests / lessons for next :