UFLS Workshop Discussion #3

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Underfrequency Load Shedding Report
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
ERCOT Update on UFLS Annual Survey with TSP/DSP September 2014.
ERCOT Under Frequency Load Shed Testing
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
April 23 rd OWG UFLS Survey & Power Factor Review.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Status Report for Critical Infrastructure Protection Advisory Group
WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
10/13/10 RMS RMS Market Reports – Recommendations Karen Farley Manager, Retail Customer Choice.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
ERS Update – DSWG Presentation September 21, 2012.
Operations Report Kent Saathoff System Operations ERCOT.
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Distributed Generation Registration June 30, 2008.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
REVISION TO DEFINITION OF TRANSMISSION OPERATOR NOGRR 149 ( APPEAL ) Small Public Power Group of Texas (SPPG) Presentation to ERCOT Reliability and Operations.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
PRC and SPSs in ERCOT RAS Workshop May 9, 2016.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
ERCOT Update on UFLS Annual Survey with TSP/DSP Gene Lowrie Reliability & Compliance Eng Sr. July 2016.
UFLS Survey Explanation
TAC Report to the ERCOT Board
Exceptional Fuel Costs in LMP
Nodal COMS Additional Items Update
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Southern Cross Directives Planning Items
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Phase Angle Limitations
Congestion Management and Ramp Rate for Delivering Ancillary Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Reflecting Losses in DR within ERCOT August 22, 2012
Generation Adequacy Task Force Update to WMS
Commercial Operations Sub-Committee Update to TAC
Compliance Report to ERCOT TAC February 2007
PRC Implementation Plan and Summary of Devices
ESB Networks AIP Programme
Project WECC-0100 Update Load Modeling Task Force
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Compliance Open Webinar
Compliance Open Webinar
Project WECC-0100 Update Load Modeling Task Force
Presentation transcript:

UFLS Workshop Discussion #3 Matt Mereness Director of Compliance June 28, 2017

UFLS Discussion outline Antitrust Admonition Recap of Workshops #1 & 2 Background on issues being considered regarding the UFLS Compliance Survey and the Operations/Planning expectations Workshop #3 Goals ERCOT to discuss follow-up items Market Participants to consider draft NOGRR Appendix NERC requirement excerpt UFLS examples Potential Load Resource data to provide

Recap- Background on UFLS Survey Requirement ERCOT Compliance coordinates and conducts an annual survey with the TSPs and DSPs to ensure that the required automatic under-frequency load shed circuits are configured to provide the appropriate load relief in an under-frequency event as required by table below from Operating Guides 2.6.1(1) Requirements for Under-Frequency Load Shedding: 2016 results were 7.2% / 12.2% / 12.6% for total of 31.23%

Recap- Current Issues with UFLS (why being discussed) ERCOT Compliance was asked at OWG in 2016 about clarifying the assumptions for measurement of UFLS in the survey, as well as emerging operational concerns. For reference: NERC Requirements reflect Planning Coordinator shall have a “UFLS program design” See Appendix for NERC details Operating Guide 2.6.1 is the design of ERCOT Automatic Load Shedding In effect since zonal Operating Guides in 2010 Issues: For the survey just reviewed, current OpGuide language reflects the approach of “At least 25% of the ERCOT System Load that is not equipped with high-set under-frequency relays shall be equipped at all times with provisions for automatic under-frequency load shedding.” Survey data collected does not identify or align circuits with Load Resources for exclusion There has also been some “double-counting” discussions over whether Load Resources that deploy at 59.7 Hz can be counted towards the UFLS response at 59.3Hz

Recap- First two workshops Key discussions to date Recognize there are at least two scenarios of UFLS being activated Sudden event: normal day but then significant loss of generation (starting point of 60Hz and no LR deployed) Slow-burn event: system is in emergency operations (EEA2), LR deployed, and then loss of generation In both cases, need for 25% of armed UFLS to arrest frequency ERCOT view that as frequency drops from 60 to 59.7 to 59.3, that the measurement of 25% response is tied to what the Load was when crossing 59.3 and initiating UFLS levels. Agreement that annual Compliance survey measurement should align with expected Operations compliance (post event reports and analysis) ERCOT was asked about creating initial draft reflecting expectations Draft NOGRR created and reviewed briefly at April meting ERCOT asked about providing inventory of LRs in DSP footprint ERCOT noted this is in network model but can also be provided ERCOT asked about providing historical trends/deployments ERCOT offered to provide annually if market can agree how to summarize (min, max, avg, annual, hourly, etc)

Goals for this workshop Today is review 3 action items from April meeting Input from ERCOT Is DSP the appropriate role/definition for compliance in the NOGRR? Consider whether TO is proper entity as the DSP agent (see ERCOT’s updated draft NOGRR) TO designation reflects current survey responses Is it feasible (with a system change) for TSPs to receive real-time telemetry status of Load Resources from ERCOT? Yes, in a similar manner to how all generation is observable by TSPs in telemetry Project needed for configuration work to make available ERCOT still also open to providing an annual analysis of Load Resources Based on percentage of time individual Load Resources are armed, is there a probability approach that would best model expected Load Resources response to see if there is a P90-type fit? ERCOT would like to discuss in more detail how this might work Input from Market Participants STEC comments on a P90 type probabilistic solution Potential concern over using DSP or TO as defined participant

APPENDIX: NERC requirement excerpt UFLS examples Potential Load Resource data to provide

Appendix- NERC Requirement NERC standard PRC-006-2 — Automatic Underfrequency Load Shedding: Requirement 9. Each UFLS entity shall provide automatic tripping of Load in accordance with the UFLS program design and schedule for implementation, including any Corrective Action Plan, as determined by its Planning Coordinator(s) in each Planning Coordinator area in which it owns assets. [VRF: High][Time Horizon: Long-term Planning] Measurement 9. Each UFLS Entity shall have dated evidence such as spreadsheets summarizing feeder load armed with UFLS relays, spreadsheets with UFLS relay settings, or other dated documentation that it provided automatic tripping of load in accordance with the UFLS program design and schedule for implementation, including any Corrective Action Plan, per Requirement R9.

Example TDSP #1 #2 #3 #4 #5 Load 20MW Load 20MW Load 20MW Load 20MW X Load 20MW X LR = 1MW LR = 10MW Current Annual Survey language could imply this methodology: Actual System Load = 100 MW Survey System Load = 100 – 40 (Feeders with any LR) = 60 MW TDSP Breaker #1 armed at 59.3 = 20MW shed (20/60 = 33%) TDSP Breaker #2 armed at 58.9 = 20MW shed (20/60 = 33%) TDSP Breaker #3 armed at 58.5 = 20MW shed (20/60 = 33%)

Example TDSP #1 #2 #3 #4 #5 Load 19MW ---------------- Load 10MW ----------------- Load 20MW Load 20MW Load 20MW Load 20MW Load 20MW LR = 1MW X X LR = 10MW ERCOT assumption in Planning and Operations: System Load at 60Hz = 100 MW System Load in EEA3 or 59.7 = 100 – 11MW LR = 89 MW TDSP Breaker #1 armed at 59.3 = 20MW shed (20/89 = 22%) TDSP Breaker #2 armed at 58.9 = 20MW shed (20/89 = 22%) TDSP Breaker #3 armed at 58.5 = 20MW shed (20/89 = 22%)

Potential Load Resource data to be provided TDSP shown on Registration Form TDSP Duns From the Load Resource Asset Registration Form Dispatch Asset Code ESIID (Load Resources for NOIEs will have a non-settlement ESIID) Station the Load Resource is mapped to in the Network Operations Model PTI Number Transmission Transformer Load Name Maximum Registered Interruptible Load Historical Data (more analysis needed) Average hourly RRS Responsibility for LR during a predefined date range Maximum RRS Responsibility during the same time period