Light Rail Enhancement Project

Slides:



Advertisements
Similar presentations
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Advertisements

D2 Roadway Discussion Sound Transit Board September 22, 2011.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
1 October 12, 2012 December 5, Light Rail Efficiency Projects Board Adopted LRT Improvement Plan May 2010 Speed up system, open new markets, improve.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
I-35W and 46 th Street Station Concept Service Plan and Construction John Dillery & Mac Sweidan Kingfield Neighborhood Association June 2010.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
0 Presentation Outline I. Background II. Data Snapshot a. Development Review Activity for 2014 b. Select Projects Under Construction or Completed in 2014.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
1 Presentation to TAC May 20, 2009 Priority Corridor Network (PCN) Evaluation Project Introduction.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Northern Lights Express Minneapolis/Duluth-Superior Passenger Rail Alliance February 24, Northern Lights Express Minneapolis/Duluth-Superior Passenger.
Reno Area / Rail-Transit Options March 24, 2016 Reno Area Rail-Transit Options by Lawrence Meeker HNTB Corporation Reno Area Rail-Transit Options by Lawrence.
AGENDA PROJECT OVERVIEW PAST AND PRESENT YOUR VALUES FOR TRANSIT NETWORK CONCEPTS.
Multi Agency Exchange May 16, 2017.
Chelan County Transportation Element Update
Integrating Transit and Highway Solutions In High Volume Corridors
Public Conference December
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
A Presentation to: River to Sea TPO Board October 26, 2016.
Finance Committee & City Council October 10, 2016
Comprehensive Route Network Analysis
A Presentation to: River to Sea TPO BPAC November 9, 2016.
River to Sea TPO - CAC/TCC
Project Management Team Meeting #3
Operations and Service Concept
I-280 Corridor Study and I-280/Winchester Blvd Project
Dumbarton Transportation Corridor Study
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
D Line Station Plan Overview
San Mateo Countywide Transportation Plan update
Comprehensive Operational Analysis (COA)
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
D Line Station Plan Overview
Bus Rapid Transit Study
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
D Line Project Overview
I-85 Corridor Light Rail Transit Feasibility Study
M14A/D Select Bus Service
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
North Suburban Planning Council
NCRR is helping build a strong economy that benefits the people of North Carolina. We do this most visibly with steel and wood. Even more important, we.
Draft Fiscal Year Bus Service Plan
Presentation transcript:

Light Rail Enhancement Project Committees January 2015

Presentation Outline 2017 Operating Plan Long T Southern Express Other Potential Operating Changes System Speed Improvements: Study and Design North First Street Speed Improvements Montague Grade Separation Downtown San Jose Speed Improvements Vasona Corridor Improvements Chynoweth Siding Today’s presentation will cover both operating plan for 2017 and capital projects for system speed improvements.

Recommended Operating Plan – 2010 Study Recommended operating plan – main points of this operating plan Expanded Southern Express Service Direct service from the BART connection at Montague to the job Centers along tasman west (Champion, Old Ironsides, Lockheed, Levis Stadium, etc.) Express service to Skip Low ridership stations along Tasman West line All station would now have direct service to downtown San Jose (Almaden Line previously did not) Disconnecting Mountain View Line from Winchester Line should improve service reliability Vasona Line riders would lose direct trip to destinations north of Downtown San Jose, but should get a more reliable between Downtown San Jose and Winchester Status: Currently under evaluation along with other service proposals

Tasman Express (Long T) New Service from Mountain View to Alum Rock Connects with BART Milpitas Station Express between Mountain View and Old Ironsides in peak Requires double tracking Mountain View and pocket track near Great America Current The operations changes include the Tasman Exp. and the Southern Express. Tasman Express, aka the Long T, is a new direct service from MV to AR. The original recommendation is to open this service when BART phase 1 opens in late 2017. Proposed

Southern Express Current Proposed All-Day Express Service: Santa Teresa to Alum Rock Local service from Almaden to Mountain View Winchester Line loops through downtown and turns back Current Proposed The Southern Express, aka Guadalupe Express, includes an express service from ST to AR, local service from Almaden to MV, and the Wincherster line turning back in DT. In October 2010 we implemented the commuter express, which is a modified version. Non-stop Service

Ridership Projections and Cost Estimates Long T Service 2015 2018 (BART Phase I) 2035 (BART Phase II) Average Daily Ridership Increase TBD 4,000 6,700 Additional annual operating hours (% increase from existing) 31,000 hours (21%) Capital Cost Required $60M (Mountain View Double Tracking and Santa Clara Pocket Track) Southern Express 2015 2018 (BART Phase I) 2035 (BART Phase II) Average Daily Ridership Increase TBD 2,500 4,700 Additional annual operating hours (% increase from existing) 29,000 hours (20%) Capital Cost Required $0 ($10M Chynoweth Siding is an optional project)

Other Operating Concepts Service Frequency changes (same service pattern) Current Operations: 15 minute frequencies Potential Changes: 12 minute frequencies 10 minute frequencies Expand Existing Express Service Current Operations: Three Northbound and three southbound trips a day Potential Changes: Add more daily express trips Skip stop operations on North First Street Southern Express Alternatives Current Plan: All day express service between Ohlone-Chynoweth and Convention Center, Direct Almaden Service through Downtown San Jose, Vasona Downtown Turnback Potential Changes: Express service stops at Tamien then continues Express Almaden Trains No Express Service, All trains make all stops Winchester Trains to Younger Winchester Trains to Baypointe Skip stop operations on North First Street “Long T” Alternatives Current Plan: Peak Period – Express from Mountain View to Old Ironsides (stop at Lockheed) all stop east of Old Ironsides to Alum Rock Off-peak – All stop Old Ironsides to Alum Rock Potential Changes: Different stops on express service No express service All day service express service Short turn non-Long T line These are some ideas. Next step is to test them to evaluate the benefits and costs. The goal to optimize a service plan that can deliver the greatest benefits in 2017.

Near Term Focus: Its All About Speed VTA has established "increasing ridership" as one of its top five 2014 priorities Land use density continues to intensify along the light rail corridors VTA is becoming an urban light rail system where demand will increase along with traffic congestion levels along the light rail corridor In the future light rail will play a greater role in meeting the changing needs of Santa Clara Valley The system needs more flexibility to respond to different ridership demands Timing is a critical component when it comes the the potential success of capital improvements Compared to the 2010 Study, the near term focus is more “focused” – speed. Among many improvements we would like to see, speed is probably the most effective factor in attracting ridership.

Light Rail System Constraints Future Transit Connections Existing Transit Connections Merge Points At-grade Intersections Single Track Segments Downtown Transit Mall

System Speed Improvements Draft List of Improvements – Pending VTA Budget Approval Project Station consolidation study 2017 Operating Plan LRT Transit Signal Priority LRT Speed Improvements North First Street Speed Improvements Montague Grade separation Downtown San Jose Speed Improvements Siding at Chynoweth Vasona Corridor Improvements LRT Signage Replacement See additional handout. Planning Work Only Existing Capital Projects New Capital Projects

Intersections on North First Street North First Street Speed Improvements Current maximum speed – 35 mph Maximum Speed after improvements – 45 mph Improvements include fencing and gates at select intersections Required by CPUC General Order 143-B Tasman Station and merge point VTA will conduct an intersection-by-intersection analysis Intersections on North First Street Example of Gated and Fenced Light Rail Intersection Expo Line Los Angeles

Montague Grade Separation 32% of all trains delayed Average Delay of 44 seconds High automobile traffic volumes Delay (Sec/Veh) PM LOS Existing 94.4 F 2040 215.7 N. 1st Montague N. 1st and Montague Montague Grade Separation Example: Great Mall Parkway and Montague

Downtown San Jose – Phase 1 Downtown San Jose Transit Mall Maximum Speed 10mph (slowest system wide, see string chart below) Embedded track, hard to distinguish from sidewalk Multiple intersections and junctions Phase 1 – Near term improvements Phase 2 – Will coincide with BART to Silicon Valley Phase II Downtown San Jose

Downtown San Jose Bollards or curbs can be used to create separation between tracks and sidewalk Also looking at using new technology applications Bollard Examples Edmonton and Minnesota Curb Alternatives Phoenix

Vasona Corridor Vasona Corridor Improvements Vasona Corridor has two single tracked segments which contribute to delays systemwide VTA tracks are adjacent to Freight Rail tracks throughout corridor Platforms only allow for two-car trains (rest of the system can accommodate three-car trains) Vasona Double Track Freight Rail Tracks VTA Tracks

Chynoweth Siding Chynoweth Siding Would construct a siding at the Ohlone/Chynoweth Station (exact configuration TBD) Would allow for greater flexibility with express/local operation in the future VTA and Public owned ROW Chynoweth Siding Existing Track Potential Track Construction