TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Building and Operating a Station Network for Climatology and Hydrology K. Klapheck, S. Alsen,

Slides:



Advertisements
Similar presentations
You wish to offer your guests access to the internet?
Advertisements

Nordic ID Monitor Self monitoring system. Nordic ID Monitor –self monitoring system BACKGROUND There is new legislation for controlling food quality and.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Maintenance system and technology used in FMI´s observation network Jani Gustafsson Introduction FMI´s observation network.
Making the System Operational
T.R. THE MINISTRY OF ENVIRONMENT AND FORESTRY
Home Automation Products Introduction Home Automation Products تقنية البيوت والمكاتب الذكية –الأجهزة المستخدمة.
ARC reporting ARC Cerny Verze
TURKEY AWOS TRAINING 1.0 / ALANYA 2005 TRAINING COURSE ON AUTOMATED WEATHER OBSERVING SYSTEMS ( AWOS ) MODULE C.2: COMMUNICATION SONER KARATAŞ ELECTRONIC.
Real-time monitoring of Bridge Pier scouring during Flood events Director: Dr. Marlin H. Mickle Co-Director: Dr. Ervin Sejdić Graduate Students: Nicholas.
Real-time Data Collection in Flood Warning Systems
TURKEY AWOS TRAINING 1.0 / ALANYA 2005 TRAINING COURSE ON AUTOMATED WEATHER OBSERVING SYSTEMS ( AWOS ) MODULE D: DATA PROCESSING SYSTEM SONER KARATAŞ ELECTRONIC.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Greetings and best wishes from TURKEY TURKISH STATE METEOROLOGICAL SERVICE.
A new Network Concept for transporting and storing digital video…………
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
The power supply performs a self-test. When all voltages and current levels are acceptable, the supply indicates that the power is stable and sends the.
June 2010 At A Glance The Room Alert Adapter software in conjunction with AVTECH Room Alert™ devices assists in monitoring computer room environments as.
Advances in Condition Monitoring – Linking the Input to the Output Martin Jones Insensys.
Dr Gordon Russell, Napier University Unit Data Dictionary 1 Data Dictionary Unit 5.3.
Météorage Lightning data for flood monitoring Marc Bonnet V.P. International October, 2011 Météorage Lightning data for flood monitoring Marc Bonnet V.P.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Software Project Transition Planning
Operational Quality Control in Helsinki Testbed Mesoscale Atmospheric Network Workshop University of Helsinki, 13 February 2007 Hannu Lahtela & Heikki.
WSN Simulation Template for OMNeT++
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Remote Surveillance Vehicle Design Review By: Bill Burgdorf Tom Fisher Eleni Binopolus-Rumayor.
Monitoring and Measurement
SCADA and Telemetry Presented By:.
Use of AWS at MeteoSwiss: Experiences and Perspectives Thomas Frei, MeteoSwiss, 8044 Zürich, Switzerland.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Measurements at MeteoSwiss and its application for.
Dynamax Inc Houston, TX Turf Control System.
Booting in Windows XP Presented and Designed By: Luke Ladd.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
REGIONAL DECISION SUPPORT SYSTEM T. Bazlova, N. Bocharnikov, V. Olenev, and A. Solonin Institute of Radar Meteorology St. – Petersburg, Russia 2010.
Guide to Linux Installation and Administration, 2e1 Chapter 2 Planning Your System.
Real-time Observation Monitoring and Analysis Network Haihe LIANG, etc. TECO-2008.
WIGOS National Implementations DWD - Good Pratices Jochen Dibbern, Olaf Schulze Deutscher Wetterdienst.
WELCOME TO SEMINAR ON SCADA WELCOME TO SEMINAR ON SCADA Presented by: ANIL KUMAR RAUT Adm No:33IE/2k.
Yokogawa Electric Corporation ISD-MASP-S05010 Copyright © Yokogawa Electric Corporation February 16, 2005 Solution Marketing Group Industrial Automation.
Topics of presentation
11 March 2013 Tim Oakley, GCOS Implementation Manager WIGOS TT Metadata Global Climate Observing System.
© TAFE MECAT 2008 Chapter 6(b) Where & how we take measurements.
UNION COLLEGE WEATHER STATION Brian Kruppenbacker Jeffrey D’Alessandro Advisor: Professor Traver.
Introduction to Software Development. Systems Life Cycle Analysis  Collect and examine data  Analyze current system and data flow Design  Plan your.
Titelfoto auf dem Titelmaster einfügen Deutscher Wetterdienst Introduction of new Instrumentation as a Quality Management Process K. Klapheck, S. Waas,
CHAPTER 2 TYPES OF BUSINESS INFORMATION SYSTEM. INTRODUCTION Information System support business operations by processing data related to business operation.
AtoNs experiences in implementation in Romania Vukovar, December, 2012.
Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 The Po flood management.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Background Real-time environmental monitoring is a field garnering an ever-increasing amount of attention. The ability for sensors to make and publish.
WeBoKaN DWD 1 German Meteorological Service Weather-Observing-Camera-Network WeBoKaN = Wetter-Beobachtungs-Kamera-Netzwerk Theodor Mammen, Uwe Wienert.
HOW A COMPUTER PROCESSES DATA. What is hardware? Hardware is the electric, electronic and mechanical equipment that makes up a computer What is software?
Department Observing Networks and Data TECO May 2005 A Quality Management System for the Process of Collecting Meteorological Data Jochen.
Microsoft ® Official Course Module 6 Managing Software Distribution and Deployment by Using Packages and Programs.
1 Lesson 10 Operating System Customization Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Retele de senzori EEMon Electrical Energy Monitoring System.
CENTER OF ENERGY SAVING AND INNOVATIVE TECHNOLOGIES 89, Taganskaya street, office 8, Ekaterinburg, Russia Tel/fax +7 (343) ,
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Development and challenges in SwissMetNet, the new Swiss.
Encast Global forecasting.
Self-service enrollment for Windows desktops
Wiel Wauben and Dennis Hart
Programmable Logic Controllers (PLCs) An Overview.
NMHS persective; Trends in acquisition, use and management of observations Jochen Dibbern, Deutscher Wetterdienst Workshop Vision for WIGOS in 2040.
Handbook on Meteorological Observations
New Technologies for Storage and Display of Meteorological Data
(6-8 November 2018, Beijing, China)
Presentation transcript:

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Building and Operating a Station Network for Climatology and Hydrology K. Klapheck, S. Alsen, R. Bauer, A. Bungenstock Deutscher Wetterdienst Hamburg Adress: Jenfelder Allee 70a D Hamburg

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten - Introduction - Progress in building up the network - Station description - Facilities of the network - Maintenance of software and hardware - Final remarks

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Need for modernizing the voluntary Observer network for climatology/hydrology : by using new measurement- and information-technology and redesigning the net (locations, numbers, equipment of stations): achieve - automizing the readings of instruments - prompting eye observations into electronic data processing

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Other objectives of the new network - Improve data quality: same level as data from synoptical stations - fast availability of data - central archiving of data - remote monitoring and remote configuring of stations

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Building the network: working routines Activities at the site: - searching for station locations - granting contract with site owner - pre-installation of the measurem. area - provision of ISDN connection - installation of the measurement system - starting up and instruction Providing hardware & software for station & network - fixing user requirements - writing specifications - procurement procedures - acceptance tests of prototypes - tests of series production - system modifications

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Monitor program

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Station scheme Service Programm

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Station area

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Precipitation sensor Ott Pluvio

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Observers terminal: main menue Input met. Information actual values time series sent messages display/change system parameters quit

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Observers activities send messages at fixed time of the day: - precip. height (control measurem.), snow depth, - state of the ground - estimation of wind, cloudiness, visibility send messages of continuous weather with general time indications or exact time intervals: - falling precipitation: y/n, type, intensity, frequency - deposited precipitation: dew, rime, slippery ice/snow - extraordinary weather appearances: electrical / optical phenomena, turbidity, extreme wind,... Display data, messages and system information Simple maintenance of sensors, set sensor status

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Features of the station network center - Calling data sets of time averages / sums of 1 min, 10 min, 1 h, 24 h of met. quantities Calling intervals: 1 h for S and W stations, 24 h for N stations, other intervals: configurable, and immediate calls - Receiving data on: incidents of exceeding thresholds of wind or precip. or certain weather penomena, system errors - Network monitoring from any site of DWD intranet: software update, configuration of station groups, survey of individual stations - Central data base - Backup System - Provisions for IT safety

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Scheme of the network composition Lokale Nutzer Landes- Zentralen

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Quality assurance of data 1. Provisions at the station: - Range check - Variability check - Generation of a quality byte for each value sent to the network center - Alarm generation 2. Provisions at the network center - Off-line quality control and monitoring system (see Spengler, R., Proc. TECO2002, Dibbern, J., Proc. TECO2005)

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten AMDA III / N stations: 24 h sums of precipitation region: NW-Germany date: 20 Nov 06, Screenshot of QUALIMET

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten System modification and maintenance From the view of resources : expected long lifetime of the network (but no more support from system provider) new requirements from users, remove faults modifications: who can do it ? Station hardware: - components on store - test new marketable components and implement existing software Network center: merging with synopt. network center in preparation Station software: Developers ? (if at hand) DWD staff: keeps system knowledge

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Software packages for the station Station computer: LINUX based operating system (proprietary hardware) Application progr. (C), performing : data acquisition, calculations, QA routines, local storage, alarm generation, error messages, communications, configurations. JAVA applet for remote servicing Wireless terminal:proprietary operating system (proprietary hardware) Application progr. (C) for dialogue Service computer:Windows operating system (standard PC)Application progr.( C ++ ), display data and stati, set parameters

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Final remarks Benefits of the new network : Improvement of climatological / hydrological data - less expenditure for observers: less errors - fast availability, time resolution of data - increased quality by on-line algorithms, monitoring programs, new hardware Profits for additional users: availability of actual data - AMDA III / S data: complement the synopical station network - AMDA III / N data: useful for flood modelling/forecasting - AMDA III / W data: warning management

TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Thank you for attention