STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Experience of the Spanish collaboration with TBL F. Toral on behalf of the Spanish Collaboration with TBL CERN, CTF3 Collaboration Technical Meeting, 6/5/2010.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
CLIC RF structure master schedule and CERN production
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
GSI-Cryoexpertmeeting; 19. & Cryoplant for series test facility Standard plants have a capacity up to A capacity of about 1,5kW is.
1.3GHz Input Coupler for ILC
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Manufacturing process, validation and factory test
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Update on X Band Klystron Modulator Installation.
CIEMAT contribution to PETS David Carrillo CTF3 Collaboration Meeting January 2007.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
TBTS Test Program & Schedule G. Riddone
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
L. M. Pant1 RE Workshop, 19/11/12 Validation of RE4 Cu cooling systems for mass production Validation of RE4 Cu cooling systems for mass production L.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Work on PETS Developed at CIEMAT. L. Sánchez ICWS September Work on PETS Developed at CIEMAT Laura Sánchez on behalf of Accelerator Technology.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Results of short module and qualification strategy
Status of CIEMAT work on PETS
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
LCWS11 WG4 Fully featured accelerating structure engineering design
Bruno POTTIN, Anne-Catherine CHAUVEAU
Status of HESR 18th March Gießen Dieter Prasuhn.
Service channels between Tracker and PP1
LIU Wire Scanner Milestones June 2017
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
TBL, Status, Plans, Experiments
CTF3 kicker activities at CIEMAT
12 GHz High Power RF components requirements for CEA activities
Far Detector Activities Late 2017 – Early 2018
TBL quadrupole mover prototype development
X-ray Pump-Probe Instrument
HIE-LINAC status report
LARP Phase II Secondary Collimator RC1
Lithium lens and window tests
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Two-beam Test-stand Design and Construction Status
Presentation transcript:

STATUS OF CIEMAT CONTRIBUTION TO CTF3 (20.11.2008) Courtesy N. Chritin, CERN F. Toral, J. Calero, D. Carrillo, E. Rodriguez, I. Rodriguez CIEMAT

Outline Tail Clipper. TBL movers. TBL PETS prototype.

Tail Clipper (I) Manufacturing finished on time. Leak test successful. Leak rate: 2.53 x 10-11 mbar.l/s Vacuum level achieved after 12 hours pumping from one end with a turbo pump: 2.9 x 10-6 mbar. Soft bake-out required to reach 10-8 mbar. 3 3

Tail Clipper (II) Electromagnetic tests (I) RF scattering parameters match calculations. Strip-lines tested up to 3100 V (DC) to ground. Nominal pulse will have about 2800 V. No sparks happened. 4 4

Tail Clipper (III) Electromagnetic tests (II) Excellent pulse response. 3400V, 2.5 ns rise time pulses passed through the Tail Clippers without being modified (green and red are references). Pulses of 20, 130 and 200 ns flat top were successfully tested. 5 5

Outline Tail Clipper. TBL movers. TBL PETS prototype.

TBL movers The second prototype is completely finished, including acceptation tests. It will be sent to CERN next week. The third prototype is being validated. It will be delivered in few days. The order for the remaining 13 units has been placed, and it will finish in the first half of January. Three companies have been certified during prototyping. Once the contract is signed, the supports will be fabricated first, to be shipped to CERN as soon as possible and installed during the winter shut-down.

Outline Tail Clipper. TBL movers. TBL PETS prototype.

TBL PETS prototype (I) COPPER RODS: POWER EXTRACTOR: seven rods machined and measured. Some problems with internal stresses not released with heat treatment. Eight (and last) rod will be finished next week. POWER EXTRACTOR: Fabrication drawings have been modified because brazing on dummies was not good. Two sets of copper parts will be finished next week. An intermediate heat treatment has been done to release stresses. One set will be brazed at a Spanish Institute and another one at CERN. RF MEASUREMENT BENCH: Mode launchers are being finished. They will be connected each other to be measured and validated. Delivery of digital rule delayed by the supplier, we are looking for alternatives. Some parts are already fabricated.

TBL PETS prototype (II) COOLING CIRCUITS: Copper pipes are already bent with the custom made tooling. Connectors have been sent for nickel plating before brazing. We need a high number of drilled screws for high vacuum conditions. WAVEGUIDES: Parts are being machined. We will use a brazing alloy 82% gold 18% nickel. VACUUM TANK: Drawings finished and sent to CERN for validation. Fabrication has already started. All commercial parts are procured.

Near future schedule and conclusions TAIL CLIPPER: Already finished and tested. Ready for shipment. TBL MOVERS: Second prototype finished. Third one being tested. Series order is in progress. PETS PROTOTYPE: All drawings finished and sent to CERN for validation. All missing parts under fabrication. This is the most critical item, it must be finished for the end of January.