Construction Area Activity Quantity HSD Oil StorageTanks Mechanical works Sand blasting of bottom plates Primer coating of bottom plates Welding of plates.

Slides:



Advertisements
Similar presentations
Total house building CO 2 emissions Design of a house civil/structural systems wall areas room volumes wall materials foundations framework access roads.
Advertisements

JE&GR COMPANY DEFENSE PROGRAM PRESENTATION by Primož Jelševar, project manager.
SEWON VERTEX HEAVY INDUSTRY Oil & Gas Equipment Factory
CODE OF PRACTICE FOR BUILDINGS
CB&I Corporate Overview. CB&I Profile A leading technology and EPFC company Currently ranked number 3 among ENRs Top 25 Contractors, Petroleum 2008 revenue.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
SURATGARH SUPER THERMAL POWER STATION
The art of Engineering
Painting An LNG Tank Important Processes To Follow! Painting An LNG Tank Important Processes to Follow William Donald Director Of Field Operations Tank.
Steam and Hot Water Horizontal and Vertical.  Available in steam or hot water  Casing constructed out of 20 gauge die-formed steel  Standard with adjustable.
ACADs (08-006) Covered Keywords Air compressors, aftercooler, afterfilter, moisture separator airflow. Description Supporting Material
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
OIL & GAS FIELD SUPPLIES DIVISION Oil & Gas Field Supplies Division deals in supply of Gate Valves, Ball Valves, Butterfly Valves, Control Valves, Check.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
kim sang in. INDEX Seah steel corporation Seah Steel products - ERW steel pipe Forming Steel Pipe Manufacturing Process (ERW) Application.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
11. 2 Steam Energy Energy that comes from the push of steam.
…………………………………………………………………………………………………………………………………… Lee Hun Joong Shin Kyoung Seung.
Weddell Power Station unit three
Topic Highlights Building / Construction Materials Rebar Manufacturing Process Environmental Aspects.
TO WHOM IT MAY CONCERN We, N.P.E Co. the provider of technical services and man-power to the most power plant and factories in Iran with over 18 year.
SURATGARH SUPER THERMAL POWER STATION
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire.
Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.
Sietz discussion document for Shigeru Kogyo visit v6.pptx 0 AIR CLEANERS – TRACTOR.
Wind Turbine Power Plant. Sources ●
Presentation Title Presented by Joe Blow Beyond Flow and Pressure By: Tom Cabezut Western Regional Manager.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
James McIntyre VRF Training Manager V5 Key Components.
Padma Mines and Minerals Corporation 2/391 A, Mambakkam Road Medavakkam Chennai -100.
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Thermal Energy Applications PS7d) understand applications of thermal energy transfer.
Gas Turbine.
Machinery Auxiliary Systems
Energy and Fossil Fuels
Government Engineering College
Filter Rehabilitation and Seismic Upgrades – Construction Update
Unit 37: Fluid containment Dr
He Plant, LN2 Systems and Commissioing
PHOTO GALLERY Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 7th edition by Yunus A. Çengel and Michael A. Boles.
CLEAN UP & INSPECTION.
Cryoplant Installation Scope
Status of Cryogenics Facilities Design
B245 Modifications & Cabling Update
High Performance Regulating Valve Manufactured by Maniks
Unit 37: Fluid containment Dr
Zinc Powder for Coating - Protective Primer on Metal Surfaces Zinc Powder For Coating.
WIND TURBINE GENERATORS.
Stainless Steel Water Well Casing.
DEVELOPMENT OF A SOLAR POWER PLANT
ENDEL ENGIE PRESENTATION April 2017
Lecture Objectives: Finish with Electric Energy Generation
LaBour Pump Selma, Alabama “The Can Do Place” 11/19/2018.
SALMAWY UNITED GROUP CONSULTANT
STEEL AS A CONSTRUCTIONAL MATERIAL
Cryogenic air separation plant
Unit 2 Changes in Matter 1.
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
Coating Failure at a Gas Compressor Facility
SDEM ERECTORS NIGERIA LIMITED
STEEL PLATES.
Organics Waste Processing Facility Construction Progress Update July 8, 2011
  5.6 Rapid mix Rapid mixers should provide sufficient agitation to disperse the coagulant in raw water. Rapid mixing units can be classified according.
GALVESTON COUNTY WCID NO BOND PROGRAM
Presentation transcript:

Construction Area Activity Quantity HSD Oil StorageTanks Mechanical works Sand blasting of bottom plates Primer coating of bottom plates Welding of plates In Progress In progress Gas Turbine Fixators Mock Turbine GT-12 Generator side is in progress GT-11 Completed Cooling Water Pipe Mechanical works Rolling Welding In progress Gas Turbine HallSteel Structure ErectionIn-Progress Air Compressor BuildingSteel Structure ErectionCompleted 500 KV Switchyard Gantries Steel Structure AssemblingIn progress Water Treatment Plant Building Steel Structure ErectionIn progress DAILY PROGRESS SUMMARY OF SEPTEMBER 21 th, 2016.

STATUS OF MECHANICAL ACTIVITIES Tank 1Tank 2 Sand Blasting and Painting89 WeldingN/A1 L, 4 S

STATUS OF MECHANICAL ACTIVITIES SEKAEPL Rolling3415 Painting-- Welding22 LS, 3 CS2 LS, 2 CS

STATUS OF MECHANICAL ACTIVITIES Steel Structure GT-Hall4 Columns Air Compressor Building Complete Switch Yard8Trusses Water Treatment Plant3 Columns

STATUS OF MECHANICAL ACTIVITIES GT-12 Fixators Inspection