WBS 1.03 Readout Systems Scope, Cost and Schedule

Slides:



Advertisements
Similar presentations
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Advertisements

PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Effective Methods for Software and Systems Integration
From Research Prototype to Production
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Update on Electronics for the SSL 8” Ceramic Detector Matt Andrew, Kurtis Nishimura, Gary S. Varner University of Hawai’i 28-MAR-2012 Discussion 1.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
US Belle II Project Overview Jim Fast Pacific Northwest National Laboratory.
Project Overview James Fast Pacific Northwest National Laboratory.
US Belle II Project – Technical Elements David Asner Pacific Northwest National Laboratory.
ITOP Quartz Procurement Status James Fast Pacific Northwest National Laboratory PNNL-SA
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Camera PDR/CD1 Planning 19 September 2008
Project Cost Management
Supportability Design Considerations
Jim Fast Pacific Northwest National Laboratory
Final CALICE OsC meeting: Status and summary of project
WBS 1.03 Readout Systems Specifications, Design and Acceptance
Project Management W. J. Foyt
Milano Activities: an update Mauro Citterio On behalf of INFN Milano
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
EDR HLRF Work Packages Draft Summary
ProtoDUNE SP DAQ assumptions, interfaces & constraints
10/month is the present production rate 2 FTE + sporadic contributions
GlueX Electronics Review Jefferson Lab July 23-24, 2003
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Part II Project Planning © 2012 John Wiley & Sons Inc.
GLAST Large Area Telescope
Engineering Processes
Management Breakout: MREFC Budget Summary Victor L
EMIS 7307 Chapter 6.
SPOKE Cavities frequency preparation plan and RF control procedures
Electron Beam Systems ETC and Methodology
Project Management Issues John N. Galayda, SLAC April 24, 2002
LCLS Undulator System Status and Schedule
Project Management Considerations
PSS verification and validation
NEH - Status Stefan Moeller.
Fermi Lab – 2019 CMB-S4 Workshop
LCLS Undulator System Status and Schedule
Preliminary Project Execution Plan
Test Beamline System Requirements and Charge to PDR Committee
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
NGEC Executive Board Meeting
SNS-PPU upgrades the existing accelerator structure
Question 1: Contingency for “extra” year
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

WBS 1.03 Readout Systems Scope, Cost and Schedule Gary Varner University of Hawaii

Gary Varner, Belle II Directors Review (Pre CD-2/3) Talk Outline WBS Element Scope Performance Requirements Cost Estimate Schedule Risk Summary 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3)

Gary Varner, Belle II Directors Review (Pre CD-2/3) WBS 1.03 Scope (1) Readout electronics for the iTOP (WBS 1.02), and KLM (WBS 1.04) detector Design, prototype and evaluation of ASICs and readout boards within Belle-II DAQ environment Procurement of all components Assembly, integration and test of sub-detector readout modules Delivery to sub-detector assembly sites 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 3

Gary Varner, Belle II Directors Review (Pre CD-2/3) WBS 1.03 Scope (2) Firmware for real-time ASIC operation and data flow control and monitoring FPGA/DSP microcoding for waveform data reduction Documentation and support of ASICs and readout modules Low-level software modeling of trigger (tsim) and event buffer overflow prevention logic 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 4

Performance Requirements Operate within the Belle II Trigger and Data Acquisition specifications Meet the detailed timing and signal processing specifications for the iTOP and KLM sub-detectors Fabricate using commodity components or processes with high yield and reliability assembly houses Verify component and integrated module radiation tolerance for the background environment expected 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 5

CD-2/3 Cost Estimate – WBS 1.03 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 6

Gary Varner, Belle II Directors Review (Pre CD-2/3) Cost Basis of Estimate Reasonable Cost Range Make up of cost estimate 54% of total cost is subcontract of ASIC and circuit board fabrication and assembly Competitive (commodity) quotes received for all components and assemblies Engineering labor associated with prototype testing and final acceptance testing Maturity of the estimate Majority of remaining cost (67%) is commodity components or processes Remaining estimate based on engineering estimate for development of calibration system, testing, and interface on mechanical system and actual cost from prototype articles. 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 7

Schedule – iTOP Readout Key drivers/constraints CD-3 April 2014 to support production readout procurement plan Pre-tested readout assembled with completed modules for extended cosmic-ray verification prior to Belle II detector installation 2011 2012 2013 2014 2015 B CR B CR B CR Beam & Cosmic Tests Preproduction Readout Production Readout CD-3 Module Assembly Install & Commission Periods shown are calendar years 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 8

Schedule – KLM Readout Key drivers/constraints CR w/ CR COPPER CD-3 April 2014 to support Scintillator production readout procurement plan Pre-tested readout assembled with completed modules for extended cosmic-ray verification prior to Belle II detector installation 2011 2012 2013 2014 2015 CR CR w/ COPPER Cosmic Ray Tests Preproduction Readout Production Readout CD-3 Module+ Pre-amp Assembly Install & Commission Periods shown are calendar years 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 9

Identified Project Risks One high risk remains Gary Varner and team in Hawaii are overcommitted and cannot complete all assigned scope on schedule. Mitigation has been to transfer electronics development and testing scope to other institutions (IU, PNNL, WSU, VT, USC) 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 10

Technical Risk Assesment Performance of switched capacitor array waveform sampling has been well established in various experiments (ANITA, MUEGAMMA) ASICs fabricated in high-volume, commodity IC vendor lines and are low risk Module fabrication and QA/QC procedures are industry standard processes and low risk Concurrent ASIC development cycles increase risk of delays due to design multi-tasking Mitigate by having more stringent submission reviews with additional external experts Further reduce stress on design engineering resources by increasing pool of qualified test and evaluation engineering talent 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 11

Gary Varner, Belle II Directors Review (Pre CD-2/3) Conclusion Scope of WBS well understood Evidence – Performance achieved in beam and bench tests Final opto-electro-mechanical configuration Integration with existing Belle II DAQ infrastructure Costs are known and fit within funding profile Evidence – Costs defined by bid/vendor quote/similar work Fits funding profile Ready for CD-2 and (conditional) CD-3 pending success of recently submitted ASICs 16-17 January 2013 Gary Varner, Belle II Directors Review (Pre CD-2/3) 12