SGFP 22 Coupling On 5/26, identified excessive concentric offset for the 22 SGFP coupling (67 mils in horizontal direction) FMEA was developed which identified.

Slides:



Advertisements
Similar presentations
Superior Turbine Solutions, Inc. Steam Path Capabilities Rotor Repair
Advertisements

Pre-alignment: How 15 Minutes Can Save You $$$$$$
Superior Turbine Solutions, Inc. Steam Path Capabilities Diaphragm Repairs Minor Repairs Major/Minor Repairs Major Repairs Sidewall Repairs Horizontal.
Steering Systems Chapter 44.
GEAR TRAIN, SHAFT, BEARING SERVICE l CHAPTER 4 l LAB MANUAL l PAGE 61.
SERVICING EVAPORATIVE
Service Brake Adjustments Eric Shogren. Tools Must Haves Wrench 4 Jack Stands Nice to Have Adjusting Board.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Cooling Tower Maintenance Training.
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
Function, Construction and Operation
Bendix® ADB 22X™ Air Disc Brakes “Service Series”
How Structures Fail Dr Roger P. West Department of Civil, Structural and Environmental Engineering Trinity College Dublin 1E9 Mangonel Design.
REASSEMBLY and INSTALLATION u Chapter 12 u Classroom Manual u Page 325 CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
Propeller Shaft survey
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Dial Indicator 를 이용한 Shaft Alignment 의 이해와 절차
Pump Installation Vigyan Ashram, Pabal.
General idea of a couple of check rod system and adjustments
WELCOME.
Shaft Alignment Nizwa College of Technology.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
DISASSEMBLE ENGINE Teknik Kendaraan Ringan Semester 3 th Class XI Kompetensi Kejuruan SK-KD 6 TH.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
UNDERHOOD MAINTENANCE Drive Belts. DRIVE BELTS Two types of Belts are used Two types of Belts are used V-belts because they are shaped like a V. V-belts.
Chapter 11 keys, coupling, and seals
Support and alignment of PXL box with MSC, operation steps
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
© 2012 Delmar, Cengage Learning Manual Transmission Diagnosis and Repair Chapter 72.
Mechanics of Materials, 5e Chapter 1 Tension, Compression, and Shear.
Clutches.
Note location of different length bolts
The following slides depict how to recognize and repair a clogged foam screen on 8413 and This is for informational purposes only! This should only.
ENGINE REASSEMBLY Chapter 12 Classroom Manual page 311
TURBO REBUILD TURBO REBUILD. Step 1 Step 1: - Using the small pick or screwdriver, walk the tiny snap ring back into the groove on both the compressor.
Clutches Basic purpose Used to disengage engine from input shaft Flywheel –Bolted to crankshaft –Provides surface for clutch disc to work on Clutch disc.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
AVTC Model Based Design Curriculum Development Project.
AfterSalesTraining Welcome to AfterSalesTraining.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Engineering Services Predictive Maintenance. Página Web Página Web
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
2005 PS3 Summer Institute Buildings in Earthquakes Why do buildings do the things they do?
MT35P18/MT35I18 Maintenance Maintenance Objectives Piedmont Maintenance Service Be able to find information for routine and mandatory maintenance and.
Chapter 11 - Keys, Couplings and Seals
STEP 1: ASSEMBLE ANGLE PLATES
Girder-Magnets Installation
Introduction Signing for Interchanges Naming Convention
ENGINE MODE CODES.
Teknik Kendaraan Ringan
Different Types of Lathe Operations And Alignment Test
SOAR AZIMUTH DRIVE The SOAR azimuth drive systems has 4 motor+gearbox units, two pairs with backlash tuning. (600 kg box) Each subsystem is bolted to.
OBJECTIVES Discuss how to diagnose problems with disc brakes.
OBJECTIVES Discuss the procedure recommended for brake drum removal.
Landing gear systems.
Fans & Heaters technical seminar
STEP 1: ASSEMBLE ANGLE PLATES
Square Tube Shaft Connecting Both Gear Drives.
Fans & Heaters technical seminar
Fire Door Inspections Qualified Training
4th Annual Construction Law Summit
Steam Generator Main Feed Pump Radial Bearing Modification
Camshafts, Lifters, Timing Belts, and Chains
Transformations Day 1 Notes Slideshow.
Pre – Trip Inspection Training
What’s a Tensioner? Required as a result of the introduction of serpentine Poly-V belts in 1979 (4.9L Mustang) Keeps belt tight and in contact with accessory.
Alignment of Main Linac Cryomodule (MLC)
Post Seismic Bridge Inspection
Presentation transcript:

SGFP 22 Coupling On 5/26, identified excessive concentric offset for the 22 SGFP coupling (67 mils in horizontal direction) FMEA was developed which identified 9 potential causes Most likely cause determined to be turbine shifting on pedestal Next most likely failure modes considered were: Pump temperature causing thermal movement Pump shifting on base pedestal Pump case jacking bolts restricting pedestal movement

Picture Following Event on 5/21 Loose Turning Gear Bolts LP bearing pedestal hold down bolt (found loose post event) Deformed dowel pin found 5/27 Dowel pin on opposite side found sheared

Inspection Timeline & Results 5/26 – Difficulty in installing bolting through turbine coupling 5/26 – Alignment checks post coupling found horizontal readings at 67 mil (vertical and axial acceptable) 5/27 – Found deformed dowel pin on east side of LP turbine bearing pedestal and sheared pin on west side 5/27 – Walkdown & Inspection by EIS and site personnel: Seal packing gap (0 mils on west side; 50 mils on east – should be centered) LP bearing pedestal appears to have moved west Other 5/27 walkdown results: Foundation has small crack in previous repaired location (acceptable – could be a pre-existing crack) Inspection beneath found no other issues (no loose parts, keys remain intact, etc)

Turbine & Pump Alignment Looking down, bearing pedestal appears to have moved west from this ridge Inspection results: Bearing pedestal visually appears moved to west Seal packing off-center to west Dowling pin found sheared on west, deformed on east Turbine coupling bolting difficulties Alignment checks off 67 mils in horizontal direction East Slide 1 view Turbine Pump West

Further Actions Additional actions taken: Jacked turbine to align with dowel holes Performing alignment check to determine if further adjustments are required