SUMMER 2017 SUMMER 2018 >= SUMMER 2019

Slides:



Advertisements
Similar presentations
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
Advertisements

Status of 500-kV DC gun at JAEA N. Nishimori, R. Nagai, R. Hajima Japan Atomic Energy Agency (JAEA) M. Yamamoto, T. Miyajima, Y. Honda KEK H. Iijima, M.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Polarized Electron Source R&D at CEBAF/JLab P. Adderley, J. Brittian, J.Clark, J. Grames, J. Hansknecht, M.Poelker, M. Stutzman, R. Suleiman Students:
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Measurements of Photocathode Operational Lifetime
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
We will not need buncher. This could be Brock’s kicker, when he sends it to us.
Global Design Effort 1 Polarized electron source update Axel Brachmann, John Sheppard, Feng Zhou, Takashi Maruyama, -SLAC- Matt Poelker -Jlab- LCWS/ILC.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
4 th Electron-Ion Collider Workshop, Hampton University, Monday May 19 th, 2008 CEBAF Load-Lock Polarized Electron Photogun Joe Grames & Matt Poelker (Jefferson.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Beam Loss Issues for High-Power, High-Brightness Electron Injectors Bruce Dunham Cornell University December 18, 2012.
Performance of the Cornell High- Brightness, High-Power Electron Injector Bruce Dunham and Adam Bartnik December 17, 2012 B. Dunham Cornell University.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Report Technical Director Storage-Ring-Installation Completed
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
SLSP activated well on April 7th
Bubble Chamber Schedule – 2017
Feng Zhou LCLS-II AP meeting 02/23/2017
Joe Grames Center for Injectors and Sources
CEBAF Injector Update PREX/CREX March 3-4, 2017
Overview of LERF Status, Plans and Goals
Why are we removing our very good gun?
XFEL Vacuum System Commissioning
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
K2CsSb cathode tests at Jlab
CEBAF Injector Overview
Thermal emittance measurement Gun Spectrometer
Tunnel Penetration Tunnel Floor Gun Little Oil Tank ISB Rack
UITF Operational Review
Parity Quality Beam (PQB)
Further Measurements of Photocathode
keV region overview Polarized Source Inverted Gun with 450 kV HVPS
Magnetized Electron Beam for Ion Cooling at JLEIC
Laboratory Directed Research and Development (LDRD) Proposal
Electron Source Configuration
ELIC Injector Working Group High-P, high-I source issues (DC)
Summer ‘09 SAD Same good photocathode PREP and LOAD chambers
Status of 500-kV DC gun at JAEA
Magnetized Electron Source, LDRD
Center for Injectors and Sources
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Studies of Emittance & Lifetime
Riad Suleiman February 2, 2017
A. Freyberg Aug 2016 ECT’16 =>
Test of Booster at UITF Reza Kazimi (12/12/18)
SAD Timeline 5/18 Start SAD 6/8 Linde Cold Box Mods 6/10 Gun2 Check
Polarized Source: Recent Activities
Electron Gun UP (EGUP) Plan
Cooler e-source Magnetized Beam LDRD Progress Report
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
(Beam) Commissioning Plan
UITF Conduct of Operations Review
Overview of RF Gun Specifications and Technical Issues
Cooler e-source Magnetized Beam LDRD Progress Report
Presentation transcript:

SUMMER 2017 SUMMER 2018 >= SUMMER 2019 CEBAF Injector Upgrade : BIG Picture Increase Gun Voltage (200kV) Stiffen beam against space charge repulsion Reduce number ions created by beam Replace 5/5 QCM with 2/7 BOOSTER Minimize RF deflection & X/Y coupling Eliminate capture to simplify setup Increase Wien Performance (200 keV) Locate Wiens before pre-buncher Manage astigmatism/ToF SUMMER 2017 SUMMER 2018 >= SUMMER 2019 Improve 200 keV beam line Improve beam line vacuum Improve magnets/diags Remove Gun3 Simplify gun/controls/laser Opportunity for pump/gauge Upgrade Chopper Restore independent apertures Opportunity for improved setup

Preparing 200kV Gun Test Pick electrode/shed geometry minimize E-field (<5 MV/m) , linearize along insulator Use doped insulator to minimize charging, improve reproducibility with HV off/on Rotate + isolate WP1250’s + ground screen, add thermocouple to feedthrough? NEG-only bake + calibrate activation current Electrode assembly/alignment Final assembly bake, NEG activation, hi-pot, measure vacuum/radiation Sputter TiVaZr NEG tube, prepare w/ FH solenoid Local/EPICS control(Higgins/Johnson) 225kV Spellman + SF6/conditioning resistor INJSEG TOSP for Spellman operation : HVPS, 130/200kV control values/limits Installation/Testing Complete present Gun2 beam tests, safe HV, beam line + Prep vacuum, S&A as-found Vent, remove/store existing HV chamber in case re-install Install HV + NEG tube, bake 250C + activate NEG’s, leak check, check prep/puck alignment, post S&A check TOSP + Spellman => Hi-pot (w/o puck, w/ puck), test for radiation/vacuum/FE Make photocathode, QE scan, hi-pot, test radiation/vacuum/FE/QE Restore beam at 130kV, injector setup to FC1 Increase gun voltage 200kV, test injector setup to FC1 (magnets, rf, diagnostics) Lifetime and PQB beam studies at 200keV vs. 130keV as time permits Operate injector w/ Glassman @ 130keV Remove Gun3 Safe Gun3 HV, Vacuum Vent, remove NEG, Gun table Replace w/ bake vacuum station (constant over upgrade): GP500, IP, extractor, pump-out (pinch off) Eliminate or cold storage of controls (Higgins)

# Week Priority Job INJ BP NL CEBAF Opportunity Laser Table 4-LLRF Bubble PQB Injector Upgrade Brock Cavity 1 27-Mar 4-LLRF Install No Install   2 3-Apr 4-LLRF/Beam x Swing/Owl Beam 3 10-Apr Laser/Beam Tune mode 4 17-Apr PQB/Beam Spot Size 5 24-Apr Brock Beam    Kicker 6 1-May Gun2 Beam Gun2 Studies 7 8-May Gun3 Vac. work Day/Swing/Owl  Laser Table ??? Gun3/NEG 8 15-May PSS (Swing) ? 9 22-May PSS Cert (Day) 10 29-May None 11 5-Jun Spellman Spellman Test 12 12-Jun Spellman Oper. 13 19-Jun Gun2 Vac. work Gun2 Bake 14 26-Jun 15 3-Jul Gun2 @ 200kV Gun2 HiPot 16 10-Jul 200 keV Demo 17 17-Jul 200 keV PQB 18 24-Jul Bubble Install 19 31-Jul Bubble Intstall 20 7-Aug Bubble Run Owl Run 21 14-Aug 22 21-Aug PSS Cert 23 28-Aug INJ setup/ HCO Sure 24 4-Sep Restore CEBAF Why not