Design Philosophy & Application

Slides:



Advertisements
Similar presentations
Breakout Session Surface and Downhole Equipment Specs How can performance be improved by product selection? OR Can I purchase a perfect pumping system?
Advertisements

CO2 CascadeComp_Studi Galileo  1 Semi-Hermetic Compressors for CO 2 Cascade Systems Hermann Renz Bitzer Kuehlmaschinenbau GmbH  Germany.
Rotational motion Today’s Big Two 1) Newton’s law for rotational motion. 2) Rotational and translational kinetic energy.
Evolution Oil Tools Inc. (EOT) was formed in January of 2011 Headquarters in Calgary, Alberta, Canada Manufacturing, Assembly and Testing shops are in.
Moments of Inertia Polar moment of inertia – Used when calculating the torsion – Indication of resistance to torsion – Solid Shaft – J = π R 4 / 2 Area.
Beams and Frames.
MultiRail Horizontal Anchorage Device
PowaSava Energy Saving Systems A truly green system that is proven to reduce electric energy consumption Managing your energy, saving you money We won’t.
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach.
Lesson 36 Torque and Drag Calculations
THEORIES OF FAILURE THEORIES OF FAILURE FOR DUCTILE MATERIALS
Electromagnetic Flowmeter Why use flow meters What is a magnetic flow meter – How do they work – How are the different from other meters Items that will.
PROBLEM-1 State of stress at a point is represented by the element shown. Determine the state of stress at the point on another element orientated 30
Reciprocating Electric Submersible Pump (RESP)
Drilling Engineering – PE311 Rotary System
Adjustable Speed Drives (ASD): Failure Reduction and Production Optimization Notes go here. Frank Ochoa 07/25/2007.
Petroleum Engineering 406
Bridge Modules BKK and BKR
MECHANICS OF MATERIALS 7th Edition
Petroleum Engineering 406 Floating Drilling
By M. Ghareeb (Lufkin Middle East) Luca Ponteggia (Agip, Italy)
TT Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
What is good for small mechanisms is very good for very big ones. Above is the major reciprocating parts of a rally engine. At top right is the force applied.
TEC 4607 Wind and Hydro Power Technologies Fall 2011.
Artificial Lift Systems
Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Project-2 Investigation of Artificial Lift Techniques in Horizontal Gas.
Sucker Rod Lift – Troubleshooting & Problem Solving Breakout
Load and Stress Analysis
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
PROBLEM-1 Using graphical method, draw the shear and bending moment diagrams for the beam shown in the figure. Determine the absolute maximum bending.
Strength of Material-1 Introduction. Dr. Attaullah Shah.
11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure.
CHAPTER OBJECTIVES To show how to transform the stress components that are associated with a particular coordinate system into components associated with.
MECVEL SIGNS THE “SLIDING DOORS” REMAKE: SLIDING DOORS ONLY WITH OUR LINEAR ACTUATORS!
Unit-5. Torsion in Shafts and Buckling of Axially Loaded Columns Lecture Number-3 Mr. M.A.Mohite Mechanical Engineering S.I.T., Lonavala.
ARTIFICIAL LIFT METHODS
1 MFGT 104 Materials and Quality Compression, Shear, Flexural, Impact Testing Professor Joe Greene CSU, CHICO.
 2005 Pearson Education South Asia Pte Ltd TUTORIAL-3 : BENDING 1 Using graphical method, draw the shear and bending moment diagrams for the beam shown.
EXPLORATION CORE DRILLING TOOLS Premium In-The-Hole and Diamond Tools.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
BME 315 – Biomechanics Chapter 4. Mechanical Properties of the Body Professor: Darryl Thelen University of Wisconsin-Madison Fall 2009.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Miscellaneous Hydraulic Machine
Friction.
CRTNT testing equipments introduction
Optimum Pump Performance for Process Applications
11 Energy Methods.
Waldemar Janicki, Adam Adamkowski
Welcome To Getech Equipments International Pvt Ltd.
11 Energy Methods.
VERTICAL AXIS WIND TURBINE
Introduction to JUII⊕Series Machine.
Mechanics of Solids I Energy Method.
POWER TRANSMISSION with BELTS & CHAINS
Automated Capping System
Design Factors Collapse Corrected
ISO ASIS Automation & Fueling Systems A.Ş.
Fans & Heaters technical seminar
STV-4 Series Rotary Lock Traveling Valve Eliminates ALL Gas Lock!
Chapter 5 Power Estimation in Extrusion and Wire-rod Drawing
11 Energy Methods.
Ch. 2: Fundamental of Structure
Alternatives for Locomotion Control
Alejandro F. Ameglio – Head Technical Services Tenaris Rods Division
Deviated Rod Pumped Failure Methods
JANUS OILFIELD TECHNOLOGY s.r.l.
Wellbore Trajectory Example Calculation.
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

Design Philosophy & Application 2018/5/27 Design Philosophy & Application of Sucker Rod Guide Invention Patent: 200610134063.1 Huludao Longyuan Oil Equipment Co., Ltd. Beijing Winland Energy Technology Co.,Ltd

2018/5/27

Oil Recovery by PCP Oil recovery depth increased by 1.5 times Oil recovery efficiency increased by 2.7 times

01 02 03 Related domestic patent retrieval 2018/5/27 Sucker rod guide Patent No.: ZL200420120732.6 PCP sucker rod guide Patent No.: ZL200720011843.7 Sucker rod universal guide Patent No.: ZL200920010261.6 02 03

Oil Recovery Pain Spots 2018/5/27 Oil Recovery Pain Spots Uneven wear of horizontal well CBM well Dog-legged well High polymer oil well Offshore directional well Highly deviated well Broken/fallen sucker rod caused by liquid hammer conditions High motor load Offshore platform horizontal well

7°travel angle, 360°universal Solutions 7°travel angle, 360°universal Preventing suck rod from falling off or uneven wearing, reducing friction resistance Eliminating additional bending moment of sucker rod Prolonging service life of sucker road & tubing Tensile and torsional property superior to sucker rod

2018/5/27

Patented Combination

Proprietary intellectual property right 9 invention patents 20 utility model patents

In order to determine the impact of uneven wear on sucker rod string, transient dynamics finite element software was applied to make mechanical analysis for sucker rod string to find out the force and deformation conditions of sucker rod inside tubing

Mean Contact Force (Well-Ⅰ) Offset 2m

Sucker Rod Deformation in An Ideal Vertical Well Excited by Horizontal Displacement

Contrast of Sucker Rod Deformation before and after Installing Guide No Guide Installed With Guide Installed

2018/5/27 Research Findings Eliminate additional bending moment of sucker rod 01 Mitigate uneven wear of sucker rod and tubing 06 02 Greatly improve oil well pump efficiency 05 03 Eliminate backoff torque of sucker rod Reduce friction resistance, save power consumption of oil pumping unit and PCP 04 Prevent liquid hammer in rod pumped well

Strength Patented Technology Patented Combination Unique Program 2018/5/27 Strength Patented Technology Patented Combination Unique Program Entire rod string system products employ our packaged patented products Unique swage technology is applied to manufacture process. Special material and special heat treatment contribute to unique quality. Based on well conditions, transient dynamics finite element software was applied to design of special running-in program

Allow. Tension-Torque, kN x N.m Little Device, Big Help Structure Diagram of Sucker Rod Guide Adapter connector 1 Guide shaft Barrel Guide shaft Adapter connector 2 Material & Mechanical Properties of Sucker Rod Guide Specification Allowable Tension, kN Allowable Torque, N.m Allow. Tension-Torque, kN x N.m Use For pumping unit use For PCP use

Matching Principle of Sucker Rod and Guide Item Description Specification, mm Min. ID, mm Allowable Tension, kN Allowable Torque, N.m Sucker rod, Class D φ25 402 1830 φ28 510 2500 φ36 418 4081 φ38 480 4621 Class H 488 2163 619 3055 508 4988 582.3 5240 Min. matching specification of guide φ55 684 4325 φ59 φ40 750 5158 φ62 5500 D H Difference value +282 +196 +2495 +2162 +240 +131 +2658 +2103 +332 +242 +1077 +170 +430 +167.7 +879 +260 During application, strength of the guide is higher than that of the rod body. Matched guide specification shall be selected based on well conditions. Take Φ25, 28, 36 and 38 as example.

Basis of Directional Downhole Guide The basis for running in guides are determined based on well depth and structure, especially the overall angle change rate (borehole curvature or dogleg angle). Overall Angle Change Rate Quantity of Cascaded Guides Remarks 3°≤ Overall Angle ≤7° 1 group Recommended 7°≤ Overall Angle 2 groups Cascaded guides

Basis of Directional Downhole Guide 1. Whole well centralizing, centralizing on both ends of guide required Vertical section: 1 centralizer is placed for each rod below the polish rod, and provided with limit coupling; Whipstocking section, deviated section: 2 centralizers are placed for each sucker rod (with 1 in the middle), and provided with limit coupling. Sucker rod Centralizer Guide Guide Centralizer Sucker rod 2. Precautions 1) For running in at site, depth shall be relatively accurate (measurement of sucker rod must be precise), and the max. error shall not exceed 3m; 2) Screw-on shall be in place to avoid rework caused by backoff.

Design Case: Application of Guide to Directional Well Lift (Schematic of Pipe String) Srl. No. Description OD, mm ID, mm Length, mm Well Depth, m Guide Qty. 1 Casing 2 Tubing 73 62 3 Centralizer 4 52 480-680 5 Sucker rod 28 6 Oil well pump, PCP

Horizontal Projection & Vertical Profile (Vertical Section Displacement) Well trajectory local enlargement Kickoff point 1: well depth, 305.69m Kickoff point 2: well depth, 334.52m Vertical Depth, m Kickoff point 3: well depth, 363.41m Kickoff point 4: well depth, 392.39m Pump setting depth: 708.6m Displacement, m

FL-EP16-S2 Continuous Well Inclination Data Overall Angle Change Rate, Depth, m Vertical Depth, m Deviation Angle, 。 True Azimuth, 。 Total H Displacement, m Total Orientation, Overall Angle Change Rate, 。/25m 200.00 0.24 225.68 0.12 251.58 0.00 225.00 224.95 6.44 238.22 1.36 235.64 6.24 250.00 249.66 10.73 238.99 5.15 238.91 4.30 275.00 274.04 14.85 232.16 10.66 237.41 4.38 300.00 298.03 17.91 232.58 17.64 235.09 3.06 325.00 321.64 21.13 233.57 25.86 234.33 3.24 350.00 344.56 26.10 234.48 35.82 234.13 4.98 375.00 366.81 27.52 235.02 47.21 234.39 1.44 400.00 388.49 31.84 59.64 234.54 4.33 425.00 409.26 35.84 236.42 73.54 234.87 4.03 450.00 429.04 40.45 235.57 88.80 235.05 4.64 475.00 447.12 46.35 233.11 106.05 234.94 6.14 500.00 464.25 46.19 231.40 124.24 1.24 525.00 481.92 44.92 229.97 141.89 234.04 1.63 550.00 499.68 44.84 230.55 159.45 233.62 0.42 575.00 517.40 45.05 231.01 177.06 233.39 0.38 600.00 535.46 41.64 231.24 194.33 233.17 3.42 625.00 554.57 38.65 231.56 210.45 233.02 2.99 650.00 574.56 35.24 232.38 225.45 232.95 3.44 675.00 595.26 32.16 232.21 239.46 232.91 3.09 Example of survey records

National Level (PetroChina Jianghan) Test Report 2018/5/27 National Level (PetroChina Jianghan) Test Report

Field Application Cases

Major Clients And their subsidiary enterprises

Supporting Oversea Oil Companies

Business Distribution 2018/5/27 Business Distribution Daqing Oilfield Shengli Oilfield Liaohe Oilfield Xinjiang Oilfield Changqing Oilfield Zhongyuan Oilfield

Oilfield Benefit Look at one oil production base 2018/5/27 Oilfield Benefit Look at one oil production base Saving operation cost Increasing production Prolong pump inspection interval to more than 300 days Annual production increase per well 68 tons Save individual well cost CNY 28,400 Annual benefit per well CNY 182,400 With the product applied to 300 wells in an oilfield for one year, CNY 8.5434 can be saved With the product applied to 300 wells in an oilfield for one year, CNY 63.2859 can be obtained from increased production

Asia Pacific Agent For 2018/5/27 Huludao Longyuan Oil Equipment Co., Ltd. Beijing Winland Energy Technology Co.,Ltd New Zealand : David Sale +64 (0) 211 546 855  david@goldingltd.com Australia : Richard Grattan+61 (0)467 788 145  Richard@goldingltd.com