CIRCULATION OF TRAM-TRAINS

Slides:



Advertisements
Similar presentations
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
Advertisements

MIXED TRAFFIC OPERATION MIXED TRAFFIC OPERATION
SNCF Infra | juin EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
IRSC DUBLIN OCTOBER 2006 vue n°1 INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL.
UIC The Worldwide Association Representing the Railway Sector Nathalie Amirault Head of Unit Expertise Development, UIC RAILWAY OPERATION IN ECVET A LLP-DoI.
1 NAT accessibilité  New rolling stock in Ile de France  Regional Structuring Bus Network RIR  Extended provision: night services  New services tramway.
Ing. Tomáš Vicherek, Ing. Vlastimil Polach, Ph.D. Research and development Automatic Route Setting According to Train Paths in Anticipated Time Schedule.
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
8 th meeting of the WG for the improvement of border crossing along the Corridor X Streamlining concept for border crossing operations Belgrade 21 January.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Urban Transport Benchmarking Initiative Paris and the Urban Transport Benchmarking Initiative Isabelle Bachmann- RATP- Paris.
Transport presentation October An integrated railway solutions provider Sales 4.9 B Euros Orders received 4.7 B Euros Employees Market Share.
Bus signal priority: effets on quality of service and necessary condition on conceiving a system of this kind Jean-Jacques HENRY - ITSJU Zhengyi LIN –
International Road Transport Facilitation Results from a survey in the League of Arab States based on driver records Riyadh, November 13, 2013.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
Enforcement policy on level crossings in France Philippe FELTZ, 16 March 2011.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Transports in Paris current, Past, and future. Past, current and future transports in Paris 2 Outline Outline : I/ Yesterday : a history of the underground.
1 sanofi-aventis R&D Bagneux Research Center 31 avenue Paul Vaillant Couturier Bagneux France Access And Transportation.
1 Prague, March 12 th 2009 Jean Charles PICHANT – Head of Interoperability Unit The State of processing and approving TSIs.
INTERGO bvI PO Box 19218E 3501 DE UTRECHTT Countdown on a platform Higher punctuality and increased level.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Cross border obstacles in rail transport and interoperability Giordano Rigon European Commission – DG MOVE D2 ERESS Customer Forum Brussels 16 June 2011.
October 2007 IRSC, Goa (India) 1 Lessons from an accident Marion Segretain, French National Safety Authority (EPSF)
Liberalisation of the railway market A challenge to finance railway systems Benoit Chevalier Deputy Director for Rail Safety and Regulation French Ministry.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
EMTA General Meeting , Turin Tamas Dombi, ZTM Warsaw1 Actual Problems of the Public Transport in Warsaw Metropolitan Area.
Bruxelles, 29/30 th January, 2014 Report on TSI OPE revision RISC 69 th.
Compania Naţională de Căi Ferate National Railway Company “CFR” S.A. Bucharest, October 6 th, 2015 Building the new railway economy Challenges & Opportunities.
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
Summary and Wrap-up Discussion 8 July 2015
TWO INITIATIVES ON AUTONOMOUS VEHICLES AT MIRAMON TECHNOLOGY PARK (Citymobil2 & PRT MIRAMÓN) Jesus Murgoitio 1 Maria Izaguirre 2 (1) Tecnalia Research.
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
SIAFI, Paris, Infrastructure Activities Databases and Benchmarking  Franco SCHIAVI: Senior Advisor  Aleksandra PERKUSZEWSKA: Database Administrator.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
1 Address: UIC Safety Database (SDB) System and Results.
Tram TCMC Tram line to la Gravière completed end of 2009 Tram to CERN completed end 2010 Section from la Gravière to CERN may be completed at a later date.
PAI Paris Gare de Lyon PrEsentation Of the PROJECT 20/06/2017
Marek Stavinoha Legal officer DG MOVE A4 European Commission
High Speed Rail Some Development Principles
FRMCS Traffic Analysis Summary
GSM-R / Mobile coexistence National Cooperation/coordination Process
International Rail Safety Conference Vancouver, British Columbia
Public Conference December
ROAD – RAIL – URBAN TRANSPORT
Sustainable Forest Management Initiatives in Central Africa an inventory of forest organizations/ on-going projects (national and internationally) funded.
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
The SEESARI initiative – “From vision to action“
European Rail Infrastructure Managers
NAB/RB Training Workshop In Valenciennes, April 2016
Snejana Markovic-Chénais
Jean Carlos Pejo - Chairman ALAF Brazil October 23, 2014
Communications in Railway Centralized Traffic Control Systems
Mixing mainline and urban systems
Track circuit reliability assessment for preventing railway accidents
Analysis of capacity on double-track railway lines
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
Operation of the State Company AVTODOR French practices in Russia
PAI Paris Gare de Lyon PrEsentation Of the PROJECT 20/06/2017
Tramways in Norway Nordic Rail 6 October 2015 Ove Skovdahl
ATO over ETCS Benoît BIENFAIT 10/2/2016.
East Coast Route Study November 2016 update.
operational Command and control centrE in IDF
Working Group on Rail Transport Statistics:
Presented by European Railway Agency (ERA)
Life Cycle Costing.
Jurij C. Kofner Research assistant, Advanced Systems Analysis Program
Presentation transcript:

CIRCULATION OF TRAM-TRAINS INTERNATIONAL RAILWAY SAFETY CONFERENCE Dublin 23 – 25 october 2006 CIRCULATION OF TRAM-TRAINS ON THE FRENCH NATIONAL RAILWAY NETWORK Jean-Paul BALENSI commencer par un tour de table

Summary Recall on the concept of tram-train Typology of the various cases of application in France or border areas 1st example of application : Bondy-Aulnay 2nd example of application : Mulhouse / Vallée de la Thur Conclusion

Recall on the concept of tram-train Tram-train is a system including infrastructure and rolling stock developing a specific transport service on a railway line According to the performances of the rolling stock, the number of stations can be increased (without increasing the time of transport) to collect more passengers along the line The characteristics of the rolling stock (light train) command to adapt the operations on the line to keep the same safety level as with conventional trains

Pictures of tram-trains in operation

Typology of the various cases of application (1) The tram-train can operate on a dedicated line where no conventional train operates : it is the case of T2 in Paris or between Bondy and Aulnay where the tram uses a former railway line. In this case, the line is operated like a tramway line without signalling except in the tunnels. (extrait du projet de critère “efficacité de la veille système” de l’agrément du GI)

Typology of the various cases of application (2) Operation of the tram-train can be alternated with sequences « train ». It is the scheme of the line 2 in Montpellier where a part of the line is using a railway line supporting a very low freight traffic. In this case, the line will be operated with trams or trains during dedicated time schedulded. Collecter l’information : Messages journaliers CNO CRJ Fiches Événements sécurité PSSR Fiches Franchissement de signal Impromptu EXCALIBUR BREHAT  + résultats de la 1ère partie de l’enquête pour identifier la nature du dysfonctionnement du système Évoquer le rôle des PSSR Lignes d’information parallèles : - PSSR  IOS ligne métier régionale  IEM, GL-TS, FR-S, etc. ligne opérationnelle (A.-C., COCG)  CNO

Typology of the various cases of application (3) The infrastructure used for the tram-train services can be used by different kinds of rolling stock : conventional train (passenger and freight) and tram-trains : it will be the case in Mulhouse « Mesurer un niveau de sécurité, c’est mesurer quoi ? » Enjeu : Comment évaluer un niveau de sécurité ? OSC, attentes EPSF, etc.

Typology of the various cases of application (4) The railway infrastructure used for the tram-train services can be connected to an urban tramway line : it is the case in Sarrebrück and be the case in Mulhouse. exploitation de la Base IOS + chaque Expert métier d ’IOS boucle par l’exploitation des Bases d’Activités ou Domaines correspondantes  Plans d’action, Suivi des plans d’action, Bouclage

T4 Bondy / Aulnay Length 8 km in the suburb of Paris. It is a railway line adapted for operation like a tramway line No signal (except on shunting routes), 25 kV 50 Hz, crossroads instead of level crossings, control on sight The rolling stock operates on a railway line for garage and maintenance in Noisy with railway operation procedures

Tram-train Mulhouse / Vallée de la Thur The length of the line is 37 km divided into 3 sections : a part on the urban network (line 1 and line 2) A single track section dedicated to the tram-train (junction between urban and railway sections) A single track section with mixed traffic tram-trains, passenger trains and freight trains

Tram-train Mulhouse / Vallée de la Thur On the urban section the tram-trains run on sight like the trams On the junction section dedicated to the light vehicules, we find signals in the stations only for the single track section. Tram-trains are equiped with ATP (KVB).

Tram-train Mulhouse / Vallée de la Thur

Tram-train Mulhouse / Vallée de la Thur The mixed section is operated like a railway line with specificities due to the characteristics of the tram-train : all the trains and tram-trains are equiped with ATP (KVB) with strong rules in case of failure the level crossings staying near the stations are equiped with a detection of the tram-train to postpone the sequence of the barriers and reduce the time of closure due to specific characteristics of the infrastructure, the tram-trains are specifically detected at the end of the railway section to stop conventionnal trains in case of error of direction to the tram section.

Conclusion Light rolling stock makes possible to collect new segments of customers on the regional railway lines. Peri-urban areas are the best example Solutions exist to guarantee the safety at the same level as for the conventionnal railway services. They can be different according to the operation mode The question of frontier zone must be particulary studied because of the interfaces between railway and urban where the modes of operation are quite different.

Thanks !