Prof.Dr. Reynaldo Zoro. Dr. Syarif Hidayat, Tulus Leo

Slides:



Advertisements
Similar presentations
OVERHEAD LINE INSULATORS
Advertisements

Earthing of MV and LV Distribution Systems: A multi-faceted problem.
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.
 E4 Electrical Installation #1 Power Distribution.
Protection against Lightning Overvoltages Overvoltages due to lightning strokes can be avoided or minimized in practice by (d) shielding the overhead lines.
Lightning and Power Transmission Lines EE --- Term Paper By ---
MULTI-CHAMBER ARRESTERS AND INSULATOR-ARRESTERS
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
The Physics of Lightning
Calculating Separation Distance and Surge Current
ELG4125 Transmission and Distribution Systems
IEEE Wind Farm Collector System Grounding for Personal Safety Summary of Topics.
All rights reserved Surge Arrester.
Daily Questions Week of Feb. 24 to Feb. 28 February 24 If you want to demonstrate that like charges repel, it would be best to ______. A. Place two positively.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
1 Air Conditioning Breaker Panels and Disconnects.
George Podporkin Ru Session 2 – Block 1 – Paper 19 Barcelona May LIGHTNING PROTECTION OF MEDIUM VOLTAGE OVERHEAD LINES WITH COVERED CONDUCTORS.
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
POWER HOUSE.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Submitted to: Submitted by:
Department of Electrical Engineering
220 KV GRID SUB STATION MORAK,KOTA SUBMITTED TO:- SUBMITTED BY:- SHRI VIKAS BHALLA LAKHAN SINGH ASSISTENT PROFESSOR ROLL NO.-12ECTEE029 ELECRTICAL DEPARTMENT.
132KV GSS PIPAR CITY JODHPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Submitted To:- Submitted By:- Mr.
Presented by: Nguyen Phan Thanh Southern Taiwan University of Science and Technology.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
SMJE 2103 Overvoltage, Electrical Insulation and Protection Devices.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
LIGHTENING PROTECTION USING LFA-M
EE 2353 HIGH VOLTAGE ENGINEERING Faculty Name :A.JAIBUNISHA Faculty Code : EE 58 Designation : LECTURER Department : EEE.
ELECTRICAL INSTRUMENTS ( service and utilization )
Alexandre Piantini University of São Paulo Lightning Transients in Medium- Voltage Power Distribution Lines V Russian Conference on.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
AUTOMATIC CIRCUIT RECLOSER
Electrical Power II Unit 4-Overvoltages Unit 5-HVDC Unit 6-FACTS.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Extended Mast Terminal for Lightning Protection System Improvement on transmission Lines in Indonesia Prof.Dr. Reynaldo Zoro Lightning Research Center.
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
High Voltage Engineering
A SEMINAR ON LIGHTNING ARRESTER
High Voltage Engineering
High Voltage Engineering
WELCOME TO ALL.
ELEC-E8409 HIGH VOLTAGE ENGINEERING
ELECTRIC SHOCK AND EARTHING
EARTHING.
Circuit Breakers & Reclosers
OVER VOLTAGE The voltage waves having magnitude more than its normal value. In other words, sudden rise to an excessive or abnormal value It remains for.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Design of Electric Power Systems and Utilities
Overview Key diagram of 220 KV Sub station, Ablowal Cables
BY Presenter Name: G.V,Reddy DESIGNATION: Sr. General Manager
ELECTRICAL POWER-II Electrical engineering sixth semester
Teacher Imarlys Cajigas 5th grade Science
University of Ljubljana, Faculty of Electrical Engineering - Slovenia
EET 323 – Electrical System Design Lecture 9: Grounding
LIGHTNING AND INSULATIONS COORDINATION
Protection against over voltages
PREVENTIVE WARM-UP OF PHASE AND GROUND WIRES OF OVERHEAD POWER LINES BY LOADED DEVICES IN THE PERIOD OF GLAZE DANGER Y.R. HUNGER (ELSI GROUP), Ju.V. DEMIN,
NOTICE The authors who don’t receive oral notifications before March 20th are required to present the paper using poster. The size of display board is.
NOTICE The size of display board is 1m (width)×2.40m(height). A size 0.95m (width)×1.40m(height) of your poster is recommend. In the poster, please edit.
Quench calculations of the CBM magnet
HIGH VOLTAGE ENGINEERING Presented By P.Sindhu Asst.Prof EEE Dept
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

Lightning Protection for Medium Voltage Overhead Distribution Lines in High Lightning Density Area Prof.Dr. Reynaldo Zoro. Dr. Syarif Hidayat, Tulus Leo Lightning Research Center School of Electrical Engineering and Informatics Institute Technologi Bandung (ITB), Indonesia zoro@hv.ee.itb.ac.id ; tulus.leo@gmail.com

Content Lightning in Tropics Lightning Protection for MV Lines Introduction Lightning in Tropics Lightning Protection for MV Lines Reseach Area Research Results Conclusion

Introduction The goal of this research is to minimize the disturbance on MV line in the area with high lightning density in Serpong area Over the years several tripping and conductor damages occur due to lightning strikes. Several solutions have been evaluated over the years which can improve line performance against lightning strikes such as installation of overhead ground wire and the relocation of lightning arrester.

Indonesia; Maritime Continent St. Petersburg, Rusia Equator Line

Java Island & Bali West Java Bali Island

GFD for Java Island Recorded from JADPEN

Reseach Area ; Serpong Lightning Measurement Station Mnt. Tangkuban Perahu +2023 m SERPONG

GFD for West Java Jakarta serpong Lightning Measurement Station Mnt Tangkuban Perahu GFD for West Java West Java Lightning Flash Density (Ng)

SERPONG AREA

GFD for Serpong Area on 20 x 20 km2 window Ng is around = 15-40 strike/km2/yr

Monthly Variant of Lightning Activity in Serpong Area

Protection of MV Overhead line Protection of MVOH lines Shielding Wire Metal Oxide Arrester Multi-Chamber System

Protection of 20 kV Lines in Indonesia by using; MOA arrester and Overhead Ground Wire 1 OHGW reduce induction up to 33%. 2 OHGW reduce the induction up to 66% (Peek).

Multi Chamber System (MCS) The base of multi chamber arresters (MCA), shown in next picture. It comprises a large number of electrodes mounted in a length of silicon rubber. Holes drilled between the electrodes and going through the length act as miniature gas discharge chambers.

Fig. 1. Multichamber system (MCS): (a) Diagram showing the discharge onset instant. (b) Diagram showing the discharge end instant. 1) silicon rubber length, 2) electrodes, 3) arc quenching chamber, and 4) discharge channel.

Multi Chamber System (MCS) When a lightning overvoltage impulse is applied to the arrester, it breaks down gaps between electrodes. Discharges between electrodes occur inside chambers of a very small volume; the resulting high pressure drives spark discharge channels between electrodes to the surface of the insulating body and, hence, outside into the air around the arrester.

Fig 2. Spark discharge occurs into the air around the Multi chamber arresters installation 20-kV lines.

Serpong lines characteristics A 20 kV feeder, called “Ruko” in Serpong region has been chosen to be equipped with the multi-chamber arresters. The choice is determined due to highest lightning outage of the feeder. Outages have been recorded through this logger at substation and reclosers as shown on table 1. It can be noted that in total of 40 to 60 outages took place every year on these lines. Average outages recorded per 100km per year at feeder KDS4 and feeder SR20 is 120 outages.

Table 1. Trips records on switchgear from substation and reclosers of feeders. Table 2. Data of the research location which are equipped by arrester on SR20 and KDS4 feeders.

Fig 3. 20kV lines of feeder SR20 and feeder KDS4 Fig 3. 20kV lines of feeder SR20 and feeder KDS4.Orange Color is the vicinity area, and in blue color is the whole research area.

Installation of Arresters On 20 October and 19 November 2013, a total of 44 arresters have been installed in the vicinity area. Installed arrester was shown in Fig 4, one arrester per pole is installed on alternate phases. This arrester has been installed on poles that were not equipped with gapped or gapless metal oxide arresters (MOA). Arrester was simply mounted on the cross arm using standard metal fitting.

Fig 4. Multi-Chamber Arresters installed on alternate phases, one piece per pole

Research Result Before Installation of MCA After Installation of MCA

Before Installation of MCA Nowadays Lightning data for this research derived from BMKG, (Badan Meteorologi, Klimatologi Dan Geofisika) or Indonesia Weather Service Office. From Feb 2012 to Oct 2013, 601 days, 90 trips were observed on KDS4 and SR20 feeder on more than 55 days. Lightning activity over the related days were collected and analyzed. It can be seen that only from 55 days of lightning, lightning activity in vicinity of the substation can reach 17,07 ground flashes per square kilometer per year.

Table 5. Lightning occurrence at time of recloser’s trips. Table 4. Lightning activity during 54 days from 27 Feb 2012 to 20 Oct 2013 Table 5. Lightning occurrence at time of recloser’s trips.

After Installation of Arresters According to BMKG, (Weather Station Office of Indonesia) data during the period of installation there is ground flash density was around 15 ground flashes per square kilometer per year. On the overall area, only 7 occurrences were observed after installation of Multi-Chambers Arresters. Number of occurrence of lightning and trips per 100km of circuit per year decreased from 29 before installation to 12 after installation of the Arresters, preventing more than 50% of outages.

Table 6. Lightning occurrence at time and day of distribution lines trips

Operability of Multi-chamber arrester on 20kV Networks More than 354 days after installation no increase nor excessive outages number were observed. Table 3 shows a reducing of trips per 100km of lines. Table 3. Trips records before and after installation of Multi-Chambers Arresters

Conclusion During the period of installation of MCA (2013 – 2014) the ground flash density was around 15 ground flashes per square kilometer per year compared to 17.07 GFD before (2012 -2013). Multi-Chambers Arresters operated 11 times and had a positive effect on the protection of the 20 kV overhead line by reducing number of trips.

Research results shows that MCA contributed to improve line performance by 50% against lightning strikes. During this research period and distribution line did not suffer from any nuisance tripping.

Thank You….