UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC

Slides:



Advertisements
Similar presentations
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Advertisements

1 Regulation. 2 Organisational separation 3 Functional Separation.
ICAO PBN Symposium Regulatory and Certification Forum Safety case – procedure ready for publication? Jeff Cochrane, Manager CNS Service Design.
PBN ICAO HQ Activities Overview
Workshop on preparations for ANConf/12 − ASBU methodology
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
Malta Language Proficiency Requirements Implementation
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
Aerodrome Safety Certification As seen by a Private Airport Operator in Peru Lima Airport Partners By: Michael Nicolaas By: Michael Nicolaas Chief Operating.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
ICAO - EUROCONTROL Regional Language Proficiency Seminar.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
ACTIONS TAKEN BY MCAA TO IMPLEMENT ICAO LANGUAGE REQUIREMENTS IN ATS SYSTEM OF MONGOLIA 9TH MEETING OF THE COSCAP-NA STEERING COMMITTEE Seoul, ROK
FLIGHT OPERATIONS SAFETY ASSESSMENT IN TERMINAL CONTROL AREA (ОЦІНКА БЕЗПЕКИ ВИКОНАННЯ ПОЛЬОТІВ У ТЕРМІНАЛЬНИХ ДИСПЕТЧЕРСЬКИХ РАЙОНАХ) Done by: O.V. Shalimova.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
PBN Planning and Implementation status - Ukraine ICAO EUR PBN TF/7 Paris, France, 2-3 July 2012 Pavlo KUD, Terminal Airspace Design Unit, UkSATSE.
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
ICAO Regional Language Proficiency Seminar - Baku Dec.2005.
Implementation of Amendment 1 to the 15 th edition of the PANS-ATM Document UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC UkSATSE Presentation.
ICC © Ifield Computer Consultancy Limited 2013 Ifield Computer Consultancy Limited Presentation to Directorate General of Civil Aviation of Kuwait And.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 1 : Welcome & Workshop Objectives Day 1 1.
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Air Traffic Management Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP RVSM Implementation in Europe.
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
News from Cologne: Recent developments at the European Aviation Safety Agency Patrick Goudou EASA Executive Director Portland, USA, 6 June 2006.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
RVSM Implementation in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Juan Vázquez Sanz EUROCONTROL SRU
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
Erwin Lassooij PBN Programme Manager 30 January 2014
Workshop on preparations for ANConf/12 − ASBU methodology
ASAS Thematic Network ASAS Operational Improvements -Dream or Reality:- The Impact on the Controller Anthony Smoker - IFATCA ASAS-TN First Workshop Rome.
FILING OF VFR FLIGHT PLANS
Workshop on preparations for ANConf/12 − ASBU methodology
Gustavo De León Technical Officer, ATM ICAO-Montreal
Workshop on preparations for ANConf/12 − ASBU methodology
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
PBN Planning and Implementation status - Ukraine
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Malta Language Proficiency Requirements Implementation
Workshop on preparations for ANConf/12 − ASBU methodology
Aerodrome Safety Certification
Safety Management in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
VOLATILITY IN ATM: CASES, CHALLENGES, SOLUTIONS
Workshop on preparations for ANConf/12 − ASBU methodology
Session – 4: Existing ICAO Standards relating to Air Traffic Control
ICAO AFI Plan African ANSP Presented by: ESAF Regional Office
ALLPIRG/4 WP/33 Appendix 1.
Workshop on preparations for ANConf/12 − ASBU methodology
Safety Risk Management (SRM) Process Overview
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO PBN Symposium Regulatory and Certification Forum
AIM Global Strategy Air Navigation Procedures for AIM Seminar
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
SAM Regional Seminar/Workshop
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues
Presentation transcript:

UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC Implementation of Amendment 1 to the 15th edition of the PANS-ATM Document UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

Content ■ UkSATSE current situation analysis ■ UkSATSE plans ■ UkSATSE risks ■ UkSATSE query ■ Summary UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

Current situation analysis Arrangements are being taken in order to comply with published implementation date: Hazard and Safety assessment; Technical specifications adaptation; ATS systems upgrading, testing and certification; Revision and amendment of national regulations; ATCO and FDO stuff training. Current situation analysis UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

Current situation analysis These are automated systems operated by UkSATSE, which receive and process flight plans and associated messages: Automated ATC System in Kiev ACC; Automated ATC System in Simferopol’ ACC; Automated ATC System in L’viv ACC; Automated ATC System in Odesa ACC; Automated ATC System in Dnipropetrovs’k ACC; Automated ATC System in Kharkiv TMA; Automated ATC System in Donets’k TMA; Flight data processing system of Ukrainian airspace management and planning center (UKRAEROCENTER); Automated System Air Navigation Charges; Automated Systems of ARO (over 20 airports). Need Modernization Current situation analysis UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

UkSATSE plans - ATC systems Kiev ATC system Supplier – SELEX SI / Italy Upgrading Plan - DEC 2011 Kharkiv ATC system Supplier – AEROTECHNICA / Ukraine Replacement Plan - MAR 2012 KHARKIV TMA DONETSK TMA Lviv ATC system Supplier – AEROTECHNICA / Ukraine Replacement Plan - JAN 2012 Donetsk ATC system Supplier – AEROTECHNICA / Ukraine Replacement Plan - FEB 2012 Dnipro ATC system Supplier – INDRA / Spain Upgrading Plan - FEB 2013 Odesa ATC system Supplier – AEROTECHNICA / Ukraine Replacement Plan - DEC 2015 Simferopol ATC system Supplier – AEROTECHNICA / Ukraine Upgrading Plan - JAN 2012 UkSATSE plans - ATC systems UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

UkSATSE risks identified There are some major complexities on the way forward: number of the UkSATSE ATS systems (7) from three different system suppliers (SELEX SI, INDRA, Aerotechnica); There is a possibility of being late with modernization of ATS system of Dnipropetrovs’k FIR due to complexity of national legislation (tender/contract procedure); Non-scheduled replacement of ATS system of Odessa FIR; human resources shortage due to implementing other projects (EURO2012 and CCAMS) at the same time. UkSATSE risks identified UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

In order to ensure the accurate internal costs and operational benefits assessment from FPL2012 implementation we would like to ask ICAO, if possible, to provide UkSATSE with “Business Case” or “Cost Benefits Analyses”. UkSATSE query UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

Summary UkSATSE is taking actions to implement Amendment 1; The modernization plan of UkSATSE automated systems has some uncertainty and risk issues; For the time being no operational advantages of new FPL format could be foreseen for UkSATSE during the 2012 – 2015 time range; FPL2012 Business Case and/or CBA became available for study will be much appreciated. Summary UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine

Thank you, Any questions? Andrey KVASHNIN ATC Supervisor of the LVIV ACC atcokvashnin@gmail.com UkSATSE Presentation at ICAO EUR FPL2012 Workshop 29 June – 1 July 2010 Kiev, Ukraine