LHCb VErtex LOcator (VELO) Module Production and Performance

Slides:



Advertisements
Similar presentations
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Introduction Silicon Tracker project: design production Tracking strategy and performance Design and performance of the LHCb Silicon Tracker Kim Vervink.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
Martin van Beuzekom, STD6 14 th September Outline: Introduction to LHCb and VErtex LOcator (VELO) Status of VELO Beamtests Upgrades Summary LHCb.
Medipix sensors included in MP wafers 2 To achieve good spatial resolution through efficient charge collection: Produced by Micron Semiconductor on n-in-p.
Chris Parkes First results from the LHCb Vertex Locator Act 1: LHCb Intro. Act 2: Velo Design Act 3: Initial Performance for LHCb VELO groupVienna Conference.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
LHCb VErtex LOcator & Displaced Vertex Trigger
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
LHCb VErtex LOcator (VELO) Module Production and Performance Anthony Affolder University of Liverpool for the LHCb VELO group RD07 Conference June 27,
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
LHCb Vertex Detector and Beetle Chip
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Performance of the LHCb Vertex Locator Thomas Latham (on behalf of the LHCb VELO group) 11/06/20111TIPP Chicago.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
12 th LECC, Valencia Sep 2006Aldo F. Saavedra 1 The Vertex Detector of LHCb - VeLo Aldo F. Saavedra Glasgow University On behalf of the VeLo group.
Developing Radiation Hard Silicon for the Vertex Locator
Detector building Notes of our discussion
Tracking detectors/2 F.Riggi.
T. Bowcock University of Liverpool
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Hybrid Pixel R&D and Interconnect Technologies
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Simulated vertex precision
Vertex Detector Mechanical R&D Design Questions and Issues
Strawman module design
LHCb Velo: commissioning, performance and High flux tests.
WG4 – Progress report R. Santoro and A. Tauro.
Design and fabrication of Endcap prototype sensors (petalet)
Tracker Outer Barrel Silicon
FNAL Production Experience
The LHC collider in Geneva
Update of US Testing Status
Vertex Detector Overview Prototypes R&D Plans Summary.
Niels Tuning (Outer Tracker Group LHCb)
The LHCb vertex detector
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Setup for testing LHCb Inner Tracker Modules
The LHCb VErtex LOcator
The LHCb Front-end Electronics System Status and Future Development
First results from the LHCb Vertex Locator
Presentation transcript:

LHCb VErtex LOcator (VELO) Module Production and Performance Anthony Affolder University of Liverpool for the LHCb VELO group RD07 Conference June 27, 2007

This talk focuses on the VELO module production & performance LHCb overview B At LHC, bottom production is peaked at high rapidity with both quarks in the same direction LHCb built as forward spectrometer to optimize for the study of bottom quark decays The VErtex LOcator (VELO) is the silicon microstrip vertexer at the collision point B Tracker Muons ECAL HCAL Magnet This talk focuses on the VELO module production & performance 

VELO Design Requirements Vertexing Need to separate (multiple) primary and secondary vertices (<10 mm resolution along the beam axis) Close to LHC beam (8 mm) → Vacuum Extreme radiation levels ~1014 neq/cm2/year@inner radius →n-strip silicon sensors Prevent reverse annealing → CO2 cooling to keep sensor <-5° C Tracking Impact parameter ~40 mm (40 fs time resolution) Low mass ~15% XO Trigger Fast computation of primary vertices and impact parameter R-phi sensor geometry Tight mechanical tolerances (40 mm ┴ beams, 200 mm ║ beams) Beams Injection Clearance O(30 mm) for each half Moving detectors Bespoke, severely constrained module design

VELO Modules All 42 installed modules on base Delivery finished Feb. 2007 Installation at pit late summer 2007 Data taking starts spring 2008 Consists of: Carbon fibre clad TPG hybrid base Laminated flex hybrid 2 sensors (R & phi geometry) Carbon-fibre paddle Precision base Kapton cables Silver-plated ground straps R sensor 300 um Kapton hybrids ~200um Phi sensor 300 um Carbon fiber 2x200 um TPG 500 um Carbon fibre paddle Carbon fibre base Invar feet

Sensors R Phi n strip sensor technology (Micron) n bulk-46 modules (43 installed) p bulk-2 modules (1 installed) Double metal for signal routing Closest active strip 8.2 mm from beam R sensors 4 quadrants Pitch from 40 mm to 101 mm Phi sensor Divided into inner/outer sensor Pitch from 35 mm to 96 mm Stereo angle -20° inner, 10° outer 0.3% faulty strips in production sensors R Phi

After 1 year irradiation Radiation Hardness J. Libby, et. al. NIMA 494 (2002) 113-119 After 1 year irradiation Not type–inverted Vdep Type-inverted R(cm) n strip sensors inherently radiation hard Collecting electrons increases trapping times/mean free path With p-spray, isolated even when partially depleted After 3-4 years, cannot fully deplete inner region of sensor Dose estimates 1.3 * 1014 neq/cm2/year at R = 8 mm 5 * 1012 neq/cm2/year at R = 42 mm Estimated ideal lifetime of inner part on sensors of ~16 fb-1

Hybrid Substrates TPG (Thermal Pyrolitic Graphite) core 4x more thermally conductive than copper Removes 24 W of heat with a designed DT of 20° C between coolant and sensors ~8° C coolant-hybrid, ~8° C within hybrid ~4° C hybrid-to-sensor Clad in woven Carbon fibre for rigidity -10° C sensor -30° C cooling

Hybrids 4 layer flex Kapton hybrid (Stevenage) Laminated under vacuum to prevent trapped air Double-sided to balance stresses due to “bi-metallic” effects Flatness extremely difficult to achieve over 12.1 x 17.5 cm 20% rejection of bare hybrids Beetle readout ASICs and Kapton pitch adapters (CERN) attached by hand Pitch adaptors extremely fine pitch Inner bond pad 40 mm Not flat → difficult to glue 5% loss due to ASIC and pitch adapter gluing 2 Beetle wafers worth of chips had edge cracks due to dicing Had to replace 4 modules worth of chips

Component Testing All components are tested on arrival from vendors Sensors Probe station measurements of IV, CV, strip capacitance Smartscope measurement of size Pitch Adaptors Probe station measurement of strip capacitance Cables Resistances, opens, shorts Hybrids (bare & with surface mounts) Connectivity, shorts, temperature sensors

Wirebonding Extremely difficult wire bonding Double-sided hybrid with cylindrical geometry Complex bonding jig 4 row wire bonding Kapton can shrink/stretch during manufacturing Each FE and sensor bond had to be hand re-positioned Wire bonds per module 2320 Back-end 4096 Front-end and sensor

Wirebonding Results Bad period Problems encountered Pull strengths Hybrid movement during bonding- took 1 year to remove Vibration due to nearby construction (pile-driving) H & K 710 wire bonder severely sensitive to motion Weak wire bonds Purchased seismometer (Apple Power Book) to monitor motion Smallest bonding pads on Kapton pitch adaptor over-etched to 20-25 mm Average 3 man-day per module for all bonding But no module failures due to bonding and only 0.3% extra faulty channels introduced Pull strengths Strip # Bad period

Sensor gluing Sensor attached using custom flip-jig x Align sensors to better than 50 mm in translation, 1 mrad in rotation Dx=0.2±6 mm Dy=2±11 mm Dq=-0.041±0.034 mrad Tricky to glue such large surfaces Flatness, material & glue thickness 6% lost to gluing errors y z

Electrical Testing After each bonding step, the hybrids are electrically tested Pedestal, noise, and laser (with sensors) Opens and shorts easily found But pinholes impossible to see Full laser signal with only 20% increase in noise when inducing a bias current of 5 mA with light Beetle chip could probably be used with DC coupled sensors Found 3 sensors (6% of modules) with problems with p-spray isolation Was not possible to test for during probing with current sensor design Noise

Noise Performance short long without long with overlaid overlaid routing line long with overlaid routing line

Pedestal Hybrids mounted to VELO base on carbon-fibre pedestals ~ 0 CTE Manufactured in-house to avoid air volumes Hybrid glued to pedestal with Smartscope system For trigger, R sensor aligned to 40 mm translation, 1 mrad rotation relative to pedestal base pin

Added constraint system to hold hybrids at proper location along beam Mechanical precision Each module measured on assembly, on cable attachment, and after vacuum testing on CMM R-sensor (in trigger): Dx=-0.4±9 mm, Dy=3±13 mm Dq=-0.072±0.131 mrad Phi-sensor: Dx=-2±8 mm, Dy=5±18 mm Dq=-0.067±0.141 mrad But translation along beam difficult (44% outside of ±200 mm specification) Added constraint system to hold hybrids at proper location along beam

Thermal Test All modules tested in vacuum tank with near final CO2 cooling system and DAQ ~1x10-3 mbar with coolant at -30° C Electrical tests confirmed previous faulty channel lists Thermal performance as expected DT=-22.8° C between coolant and sensor Should be 2-3° C less with cold neighbours 2 modules had anomalous cooling performance and were rejected (4%)

Reception/Burn-in@CERN Every module visually re-inspected on arrival at CERN 3 hrs per module Module Burn-in Electrical tests in vacuum (10-6 mbar) Noise, pedestals, bias currents Thermal stressing 4 cycles between -30° C and 30° C Electronics burn-in >16 hrs at 30° C Repeater boards vessel chiller vacuum

Reception/Burn-in Results HV return line problem Jig pushing bonds at feet Found damage to bias return wire bonds Required emergency epoxy fix on first few modules Great stability of module performance No additional opens/shorts No ASICs failures Only 1 sensor showed significant bias current increase during burn-in Stable for over 3 days DI/I R sensor Phi sensor DI/I Module # Module #

Quality Assurance Hybrid Electrical Test Hybrid Cleaning/Visual Inspection Hybrid Metrology PA/Chip Attachment Visual Inspection Back-end Wirebond Electrical Test Laser Test Sensor Wirebonding Sensor IV Sensor-Sensor Metrology Sensor Attachment Electrical Test Front-end Wirebond Visual Inspection Pedestal Attachment Module Metrology Cable Attachment Module Metrology Vacuum Test Module Metrology Assemble onto VELO half Ship to CERN Electrical Test Visual Inspection Module Burn-in Visual Inspection Pack/Visual Inspection Thermoflow Cooling Electrical Test Vacuum Test VELO Metrology Vacuum Test Test of Final Electronic Chain Install in Pit 6 Visual Inspections, 6 Metrologies, 7 Electrical Test, 4 Vacuum Test

Final Production Numbers 42 installed modules produced over 10 months 63% yield of hybrids 87% yield of sensors 0.6% bad channels per module ~100 man-hours per module

Module Materials Detailed assay of all materials in module made Module mass: 321.3 g With cables: 406.9 g Heavy elements are a concern for activation 8% Nickel 0.7% Barium 0.6% Chromium 0.4% Antimony 0.3% Lead 0.3% Titanium 0.2% Zinc 0.1% Manganese 0.04% Silver 0.01% Boron Activation under study May impact repair strategy

Radiation Thickness Total radiation thickness of system 18.5% X0 Largest single source of material is the RF Foil (7.1% X0) Effort to reduce/remove foil in upgrades Modules 8.1% X0 Sensor 4.7% X0 Hybrid 2.6% X0 Paddles 0.8% X0 X modules crossed on average

CERN Test Beam x y z A production VELO half with 10 module installed was brought to the CERN muon test beam Nov. 2006 Targets were added in order to test tracking and vertexing algorithm Enough cooling and DAQ present to operate 6 full modules at a time

(Very) preliminary results of test beam Module Performance (Very) preliminary results of test beam Robust signal-to-noise Average signal: X R, X phi Noise varies within sensor due to varying capacitance XX-XX R XX-XX phi Signal-to-noise ~XX-XX R, ~XX-XX phi p bulk detector module shows expected performance under-depleted n bulk sensors after inversion will behave similarly Efficiency R f p bulk n bulk Bias Voltage (V)

Conclusions VELO module production completed in February 2007 Some of the most complicated silicon strip detectors ever built Mechanical and electrical performance as expected Commissioning and data-taking on the horizon In near future, we hope to build a complete spare VELO made with p bulk sensors Quick replacement in case of beam accident Hopefully guarantees full functionality until end of LHC run

Bad Channels 23.5 faulty channels (0.57%) on average 1% total bad channels 23.5 faulty channels (0.57%) on average Improving throughout the production

LHCb VELO Collaboration Vrije Universiteit Amsterdam École Polytechnique Fédérale de Lausanne

Metrology Histograms

Bad channel sources

Sensor Flatness After gluing Before gluing Prior to attachment to modules, sensors have a fairly large sagitta 118±9 mm (R sensors) 114±13 mm (Phi sensors) During sensor attachment, sensors constrained to be flat by assembly jig After sensor gluing, the RMS deviations from a flat plane average 14 mm

Wire Bonding Quality Back-end Bonds Production wire bonding performed by K&S 8090 and 2 H&K 710 Low re-bond rates Back-end: 0.6% Front-end: 0.6% Sensor-end: 0.7% Extremely low failure rates Front-end: 0.01% Sensor-end: 0.002% Good pull strengths 8090: 10.0±1.5 g 710A: 9.4±1.5 g 710B: 8.9±1.9 g Front-end Bonds

Damaged during probing at Liverpool Sensor Bias Currents Damaged during probing at Liverpool (Voltage Spikes)

Bias Current Stability Ratio of leakage currents @ 250V Sensor # The bias leakage current increased in a few sensor during the production process (sensor attachment and wire bonding) These sensors were probed during the period of voltage spiking at Liverpool

events

Sensor gluing Sensor attached using custom flip-jig Align sensors to better than 50 mm in translation, 1 mrad in rotation Dx=0.2±6 mm Dy=2±11 mm Dq=-0.041±0.034 mrad Tricky to glue such large surfaces Flatness, material & glue thickness 6% lost to gluing errors

Sensors Phi R n strip sensor technology (Micron) n bulk-46 modules (43 installed) p bulk-2 modules (1 installed) Double metal for signal routing Closest active strip 8.2 mm from beam R sensors 4 quadrants Pitch from 40 mm to 101 mm Phi sensor Divided into inner/outer sensor Pitch from 35 mm to 96 mm Stereo angle -20° inner, 10° outer 0.3% faulty strips in production sensors Phi R

VELO 21 stations Each station measures R and Phi +2 « Pile-Up » stations (R only) Analogue read-out Staggered in Z to allow for overlap

Front-end chip LHCb: 160x25ns deep, read out in 900 ns => SCTA not OK Design a new chip => the Beetle: 0.25 um CMOS ASIC Used in LHCb by VELO, Pile-Up system, Silicon tracker

Production:Cable Clamps Clamps are used to relieve any stress on the modules caused by the cables, they are manufactured by Photofabrication. Cable and clamp assembly in position and ready to be locked to the module base.

A very brief comparaison ATLAS CMS ILC LHCb SCT strips Pixels CCD VELO Area (m2) 60 2 0.3 0.3 Chann. (106) 6 33 800 0.2 Trigger No No N/A Yes! Precision (um) 20 12 4 5 Beam at (cm) 30 4 1.5 0.7 Dose 0.2 3.0 0.01 1.3 (1014 neq yr-1 cm-2) => VELO: small, yes, but … high precision at high fluence!

Impact parameter and momentum resolutions B ~150 um ~10 um

VELO: Secondary Vacuum Foil: 5mm from LHC beam Al 0.3mm thick 21 (originally 25) modules / side

Sensor-foil tolerance is tight slot cross section Note though that movements in z reduce the x clearance e.g. 1 mm z displacements removes about 0.25mm x clearance In general, 1mm clearance