Diagnostics for XPR CNAO BD Group Pavia, 17 marzo 2015 1.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Proposal and Progress Reports By: Anouar Benichou, El Atiki Guennouni Loubna, Hind Hanan.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
N° 23 page 70page N° 24 page 70page N° 25 page 70page N° 26 page 70page N° 45 page 71page.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Project Management Development & developers
Vended Authority Control --Procedures and issues.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Capgemini India. 2 Project Execution Process  Onsite team will gather the requirements from client and put them in Business Requirements specification.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
TPB evaporation Maura Spanu, Università di Pavia, INFN Pavia WA-104 weekly meeting 24/02/2016.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
ALICE Upgrade Construction management system Adriana Telesca ALICE MFT Plenary meeting 9 July 2015.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
ELENA installation progress F. Butin / ELENA collaboration.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
MGT 216 Week 5 Learning Team Ethical Organization Profile To purchase this material click on below link 216/MGT-216-Week-5-Learning-Team-Ethical-
MGT 350 Week 4 DQ 2 What are the steps for effective management of a decision implementation plan? How should managers monitor the progress of decision.
Distance can never be a hurdle when you truly try for something! Send Mother’s Day Gifts to make her feel delighted and valued. These Marvelous gifts as shown in slide will surly bring tears in her eyes, making her feel happy. For more Details:
UOP WEB 237 Complete Class Check this A+ tutorial guideline at For more classes visit.
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
New Employee Orientation
Action Items List at PM#7
Chris Booth Sheffield 29th March 2006
CE 332 – Construction Engineering and Management
FAQ for main changes and color measurements feature
Status of straw production straw module assembling
Diagnostics for XPR CNAO BD Group Pavia, 15 July
CORPORATE DEVICE MANAGEMENT
Overview of the Frascati Production Facilities
F. Ronchetti, INFN-LNF, September
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Gantt Charts.
Overview of the FEPAC Accreditation Process
PM 598 RANK Education Your Life / pm598rank.com
PM 598 RANK Education for Service-- pm598rank.com.
Planning Quality control - Manufacturing logbook Photos Conclusions
TSI – Texas Success Initiative
Elettra Sincrotrone Trieste
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
Presentation transcript:

Diagnostics for XPR CNAO BD Group Pavia, 17 marzo 2015 1

Diagnostics To-do-list for XPR 2 profile monitors on the beam line (SFP); 1 profile monitor (SFP) without tank and without IN/OUT for the isocenter; 1 qualification monitor (QPP). Pag. 2 9/set/2014 Diagnostica per la linea sperimentale

Diagnostica per la linea sperimentale Diagnostics for XPR Realization of prototype (done). Calibration test with radioactive source (done) Automatic calibration software (beta version done) Production of the fibers and metalization (in progress BD group -- AXE and TSD). QPP study and design (in progress) Pag. 3 9/set/2014 Diagnostica per la linea sperimentale

Schedule Table BD is ON TIME No Subject Date (weeks) 1 INFN order sent to AXE for transporting the 24 tools (jigs) from AXE to TSD using their own transport team This transport order refers to one go to TSD and return to AXE the same day and, later on, in a second go to TSD and return to AXE the same day. To=27/02/2015 2 INFN order to TSD for metallizing the 24 jigs or tools is sent.   3 Transport of the 24 tools from AXE to TSD, according to AXE To+1=09/03/2015 4 CNAO order sent to a transport company “X” for transporting the metallized fibers and other items from AXE to CNAO-Pavia To+2 5 Fibers metallization end at TSD To+5 ---- ----- ------ 17 Lanzavecchia and J.Bosser visit of one week to SCM. The fibers layers are assembled on their frames by SCM technicians in the clean room. Fiber ends polishing. Preliminary conclusions To+22 18 Transport of the production from SCM to CNAO by the transport company Y. To+23 19 Calibration at CNAO. Final acceptation or refusal (partial or global) T0+24 and 25 BD is ON TIME