Public Works Department

Slides:



Advertisements
Similar presentations
City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary.
Advertisements

1 Beachcomber Bay Sewer Lift Station Homeowners believe a better solution is available for both the City and the Homeowners.
Highway & Rural Driving
Chrictmas decoration. How to make tree decorations made of wool.
Winter Storm ” Snowfall 20 Days of Freezing Rain.
Foundations of Real Estate Management BOMA International Module 5: Putting It All Together Landscaping and Snow Removal ® ®
Driving Maneuvers and how to do them by J. M. Christensen and how to do them by J. M. Christensen.
PUBLIC WORKS DEPARTMENT
Master Builders of Iowa Construction Industry Convention 2012.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Mississippi DOT Roadsides, Drainage & Vegetation Management Standards.
Crime Prevention Through Environmental Design
November 14, 2014 District Construction Season.
Road Ranger Orientation. What is your Job or Scope of Services Move vehicles from travel lanes (disabled or involved in accidents). Unless injuries are.
Property Surveys  Legal Description  Definite boundaries  Must be clear – only one point  Must not change with time  Courts assume:  First in time.
Roads. way the Milky Way galaxy a thoroughfare for travel or transportation from place to place.
NEW YORK CITY.
Wildfires. Facts About Wildfires Wildfires are usually triggered by lightning or accidents Wildfires spread quickly igniting brush, trees, and homes.
Updated 2011 & New 2012 Landscape Projects Grand Haven.
Girl sitting on a fire engine
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
1. PUBLIC WORKS 2 Traffic in Synch  Synchronization of traffic signals began December 2007  2,300 signals synchronized as of June 2010  On track to.
Downtown Yonge BIA IDA Downtown Achievement Awards 2013 Submission Category: Events + Programming CELEBRATE YONGE, Aug 17 – Sep 16, 2012.
DEPARTMENT OF ROADS AND TRANSPORT LIMPOPO PROVINCE INFRASTRUCTURE.
SANTA MONICA BIG BLUE BUS Santa Monica City Council Study Session – August 8, /30/05 Big Blue Bus Design -New Access Center Building -New Administration.
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS.
Kentwood Fire and Transportation. Windshield Survey  Avenue G and Third Street are the main roads going through the town. They are also the only roads.
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
Visioning Session Schedule Community Opportunities Community Opportunities o Starting with a blank page… Time and Task Time and Task 6:30 Introduction.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
F ACILITIES S ERVICES D EPARTMENT M EETING D ECEMBER 2015.
The City of Bethany Oklahoma
City Manager, City of Eunice
Surviving through Downtown Construction
Stan Sherer Parks and Recreation Director
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Agenda Updates to Driveway and Sidewalk specifications and permits
Lakes Region Planning Commission TAC Meeting
Huntsville City Schools
Rules and Regulations Noise and other Disturbance Decorations & Signs
Crime Prevention Through Environmental Design
OLD TOWN COMMUNITY WORKSHOP
Project Team Cornell University: Campus Planning Department
HOUSING & INTERIOR DESIGN
Richmond Greenway Phase I
Ellsworth Library Trail
Condominiums Community
UL Stadium - Student Parking walk on S. Floyd St
Also strongly recommended:
Also strongly recommended:
Public works 2019 budget review.
Contractor Safety Forum OSH Presentation
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
J.R. Smith Elementary School
Fred Carlton Field Turf Renovation
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT
4th Street / Prater Way Bus RAPID Transit Project Stakeholder Meeting
London “ Looking down on London
Agenda Introductions: Roadway Focus Group - Jennifer
Operations Update – November 14th, 2018.
District Operations Updates
Hornaday Weekend Conservation Project
Annual General Meeting
Sage Brush Wildlife Fire
Ace Home Improvement Depot
Also strongly recommended:
21st Century School Buildings Plan
Presentation transcript:

Public Works Department 2013

Public Works Team Ken Chalker, Director Lannie Towe, Public Works Coordinator Sheila Renfroe, Administrative Specialist Michael Sams, Crew Leader Michael Montgomery, Crew Leader Justin Crowe, Crew Leader Brad Campbell, Crew Leader George Stewart, CDL Driver, Mechanic Jeff Hammond, CDL Driver, Mechanic James Moore, CDL Driver Paul Maddox, CDL Driver Daniel Shields, Laborer Howard Anderson, Laborer Steven King, Laborer Henry Gallups, Laborer Dwayne Gilleland, Laborer

Public Works Team

City of Winder Billboard Sign Before After

City of Winder Billboard Sign Before After

Community Center Public Works Department first leveled the front of the Community Center before laying sod.

Community Center

Community Center- Working together as a team!

Jug Tavern Park Before After

Jug Tavern Park Before After

Jug Tavern Park Before After

83 East Candler Street Before seeding After seeding

83 East Candler Street Before and after grass has grown

83 East Candler Street Hydroseeding

83 East Candler Street The new grass

Exchange Boulevard - Before This area was full of bushes, trees and shrubs.

Exchange Boulevard- After Two days later, most of it was cleared out.

Lakeshore Drive *Notice how narrow the road becomes from all the overgrowth.

Lakeshore Drive *After the overgrowth was cleared, this street sign became visible again.

Lakeshore Drive- Brush Truck

Lakeshore Drive Before

Lakeshore Drive After

Lakeshore Drive Cody Skelton and Brad Campbell cutting down tree limbs and trimming.

Winder Brush Truck James Moore cleaning up debris.

Winder Brush Truck

Theater Alley Before After Michael Sams packing the rock. Dwayne Gilleland and Michael Sams packing the rock.

Installed river rock to the edging of the walkway. Theater Alley

Landscaping added to the walkway. Theater Alley Landscaping added to the walkway.

Theater Alley Dwayne Gilleland and Brad Campbell Working on the sidewalk.

Public Works Leaf Truck Capital Avenue

Public Works Leaf Truck Henry Gallups vacuuming leaves off Capital Avenue.

Cultural Arts Building- Front Before After

Community Center Decorating for Christmas

Winder City Hall The Public Works Department helped decorate the new City Hall for Christmas! They added banners, garland and wreathes to the exterior of the building.

Winder Fire Department

Winder Fire Department Daniel Shields and Mike Montgomery cleaning up an old fence that had to be torn down.

Cedar Bluff curb repair work

Cedar Bluff curb repair work. Patched holes and repaired curb. Road paving will take place soon to finish the project.