Access to the English Coast

Slides:



Advertisements
Similar presentations
The Marine and Coastal Access Bill A New Framework for the Seas JOHN CLORLEY – MARINE CONSERVATION ZONE PROJECT DIRECTOR.
Advertisements

The Wash and Fens Green Infrastructure Plan Paul Espin.
Ministerial visit 16 th January 2015 Overview of Natural Devon.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Presentation to the Executive of the Carlisle Partnership 13 July 2009.
Tourism and the Economy Contribution. In 2009, the ‘visitor economy’ contributed £52 billion directly to the UK economy, or 4.0 per cent of GDP, and supported.
SHORELINE MANAGEMENT PLAN REVIEW (SMP2) South Devon and Dorset Coastal Authorities Group SDADCAG.
Guidance for AONB Partnership Members Welsh Member Training January 26/
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Marine Planning: The role of the MMO and Partnerships Steve Brooker Head of Marine Planning.
Access to the English Coast: The Solway estuary Gerry Rusbridge Senior Advisor – Cumbria Coastal Access Delivery Team.
Phase 1 Consultation Results 23 rd September 2014.
1 Session 5 CROW ACT 2000 – Access Countryside and Rights of Way Act (CROWA) Kate Ashbrook and Nicola Hodgson.
Strategic Planning for Coastal Flooding and Erosion Nick Hardiman Senior Coastal Adviser Environment Agency Strategic Overview.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Neighbourhood Planning. Frequently Asked Questions What is Neighbourhood Planning? What can a Neighbourhood Plan do – and what can it not do? What are.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
OFFICIAL – SENSITIVE English Language Requirement for Public Sector Workers Draft Code of Practice Consultation.
184 MILES Rises in the Western Cotswolds. An ever changing, diverse countryside. Passing villages in Gloucestershire and Wiltshire. Through historic cities.
Reservoirs – Emergency Planning Workshop Image courtesy of HR Wallingford.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
A Case study of a coastal landform (A headland): Flamborough Head.
Wealden Parish Conference Wealden Parish Conference Supporting business in Wealden Cllr Roy Galley 11 th September.
The England Coast Path New Forest Consultative Panel John Truswell, John Taylor Natural England
Support for English, maths and ESOL Module 1 Managing the transition to functional skills.
New Forest National Park Local Plan Review NFALC Briefing - 21 April 2016 Steve Avery – Executive Director, Strategy & Planning.
Assessing the seasonal impact of tourism on emergency hospital admissions in the South West Paul Brown 2, Julia Verne 2, Roy Maxwell 1,2, Caroline Trotter.
Louise Stewart Partnerships and Performance Director March 2012 Contribution of the visitor to economic growth.
CIL Evidence. The Evidence Primary Evidence 1.Justification of infrastructure requirements 2.Justification of an infrastructure funding gap 3.Technical.
Joint Oireachtas Committee,
Strategic Board Meeting
Community Services Programme Re-Contracting
Council on the Ageing (COTA) NSW
The Work Programme Tuesday 7th September 2010
Employer retirement pension schemes
Developing & Managing Multiple Projects
Milton Road LLF Design Engagement Paul van de Bulk 12 September 2017.
Paths around the water 10:00 Geoff Atkins, November 2007.
Sarah Leng Quality and Patient Safety Collaborative, KSS AHSN
Strategic Transport Forum Friday 15th September 2017
Environment for Growth
Western Orbital Local Liaison Forum 11TH September 2017.
Learning from Our Students’ Summer Experience Survey
Andy Jeffery Coastal Process Scientist Canterbury City Council
Neighbourhood Planning
Growing and sustaining a unique economic asset
08 March 2016 Briefing to the Portfolio Committee of Tourism on review of the draft APP.
Class Careers is a social enterprise company that seeks to enable equal access to careers information for all schools across the country regardless of.
GDPR support January GDPR support January 2018.
Multi-Use Trail Proposal
KEYNOTE STAGE SPONSOR.
Severn Tidal Power Feasibility Study
IAEA General Conference Regulatory Cooperation Forum Regulatory Approach Prescriptive vs Performance Based David Senior Executive Director -
Council on the Ageing (COTA) NSW
Winkleigh Neighbourhood Plan What is the Neighbourhood Plan?
Sarah Leng Quality and Patient Safety Collaborative, KSS AHSN
Marine Planning in England
Mergers, dispensing and appeal decisions – things to be aware of
New research into visits to the New Forest
England Coast Path: Access to the Solway Coast
Sarah Leng Quality and Patient Safety Collaborative, KSS AHSN
HE Designated Funds Cycling Safety and integration (CSI)
England Coast Path How we got here Plans to complete Benefits emerging
Two year secondment Compliment Prosperity for All by undertaking a programme of work that builds on Phase 3 of the Strategy for Older People and which.
© Fresh Thoughts Consulting
Histon Road LLF Resolutions and Programme
Admission to Secondary School in Kent September 2020
Presentation transcript:

Access to the English Coast Faversham Footpath Group In regard to the PROW alignment being considered by KCC, we have yet to see their detailed designs showing this route through the parking area. Graham Rusling is getting these prepared. As I mentioned at the last meeting, in our formal proposals we will identify our preferred route – likely the proposed PROW, but will also highlight the other options that Natural England considered – one of these being a route through the entrance gates.  The England Coast Path Kevin Haugh, Natural England southeastcoastalaccess@naturalengland.org.uk

Former Deputy Prime Minister Nick Clegg 3rd September 2014 “I’m pleased to announce today that the government will be putting the funding in place to ensure the path is completed by 2020.” Former Deputy Prime Minister Nick Clegg 3rd September 2014 Announced by Nick Clegg September 2014 Tight deadline to get all the paths in place

What is the England Coast Path? The Marine and Coastal Access Act 2009, (Part 9) establishes the coastal access duty - to create a long- distance walking route around the English coast, (the England Coast Path) and to identify land beside it, the coastal margin, accessible to the public on foot. We follow statutory guidance – the Coastal Access Scheme which ensures that a balance is struck between the interests of those who own the land and the public, in having new access rights across it. It also enables us to respond to coastal change through proposing ‘roll back’ which will allow the path to be moved back as the coast changes 2009 Act “Aims to improve public access to and enjoyment of the English coastline by creating clear and consistent public rights along the English coast for enjoyment on foot” Long distance walking route- will be the longest continual route of its kind: 2700 mile long National Trail Coastal margin – areas of open access Coastal access scheme- handbook available on our website Roll back- for example where there is likely to be coastal erosion Natural environment- through consideration of the impact of the path under the habitat regulations assessment 2010

Estuaries and the England Coast Path We have a power rather than a duty to extend the ECP along an estuary The trail could end at the seaward limit of an estuary. This may be inconvenient for access We will normally extend the trail to the first pedestrian crossing point – particularly when linking large towns, transport links, rights of way access points and local tourist businesses We must seek to balance the cost of bringing Coastal Access along an estuary against the public enjoyment of improved access

What are the benefits of the England Coast Path? Secure, continuous, clearly way-marked, well managed route National Trail brand and funding Boost to the local economy Reconnecting people with their local coast Reduced liability on coastal access land A straightforward way to deal with coastal change (roll back) In 2012, the South West Coast Path generated a user spend of £436 million and associated employment related to this spend of 9,771 full time equivalent jobs being sustained. (Unlocking our Coastal Heritage along the South West Coast Path National Trail: Report on the 2010 - 2014 £2.1m Unlocking our Coastal Heritage Project http://www.southwestcoastpath.com/media/uploads/devoncc-14005_swcp_final_report_single_pages.pdf) The Welsh Coast path officially opened in May 2012 and had an estimated 2.82 million visits between October 2012 and September 2013; 2.45 million of these were by adults (defined as those aged 16 years or over). Gross expenditure by adult visitors on these trips was estimated at £32.3 million. (The Wales Coast Path Visitor Survey 2011-13: The Economic Impact of Wales Coast Path Visitor Spending on Wales 2013 14 October 2013 http://www.walescoastpath.gov.uk/media/1160/wcp-visitor-survey-2011-13.pdf), though it should be noted that it is not a national trail and does not have a ‘roll back’ provision.

Economic benefits South West Coast Path generated a user spend of £436 million (2012) The Welsh Coast path had an estimated 2.82 million visits between October 2012 and September 2013; Gross expenditure by adult visitors on these trips was estimated at £32.3 million In 2012, the South West Coast Path generated a user spend of £436 million and associated employment related to this spend of 9,771 full time equivalent jobs being sustained. (Unlocking our Coastal Heritage along the South West Coast Path National Trail: Report on the 2010 - 2014 £2.1m Unlocking our Coastal Heritage Project http://www.southwestcoastpath.com/media/uploads/devoncc-14005_swcp_final_report_single_pages.pdf) The Welsh Coast path officially opened in May 2012 and had an estimated 2.82 million visits between October 2012 and September 2013; 2.45 million of these were by adults (defined as those aged 16 years or over). Gross expenditure by adult visitors on these trips was estimated at £32.3 million. (The Wales Coast Path Visitor Survey 2011-13: The Economic Impact of Wales Coast Path Visitor Spending on Wales 2013 14 October 2013 http://www.walescoastpath.gov.uk/media/1160/wcp-visitor-survey-2011-13.pdf), though it should be noted that it is not a national trail and does not have a ‘roll back’ provision. Reference: http://www.southwestcoastpath.com/media/uploads/devoncc-14005_swcp_final_report_single_pages.pdf http://www.walescoastpath.gov.uk/media/1160/wcp-visitor-survey-2011-13.pdf

Access and Sensitive Features Appraisal We look at the impacts on sensitive wildlife sites and undertake a Habitat Regulations Assessment (HRA) We propose avoidance and mitigation measures, if proposals are likely to affect important sites. We will work with the our own planners and wildlife experts, as well as with outside organisations to ensure minimum impacts. Key points: SPA/SAC/SSSI/ RAMSAR/MCZ When considering NE will be treated as any other applicant in terms of the assessment Working closely with Paul Hyde to make sure that we take into account all the impacts One person looking into the combined impact of all of the routes Change from Swale SPA to Medway Estuary & Marshes SPA – impact on both from both stretches of ECP to be considered

Balancing public & private interests Public interest Proximity of the trail to the sea Views of the sea from the trail Safety and convenience Continuity of the trail Operational needs Income Privacy Changes of use In relation to the trail, Natural England is required by section 297(2) of the 2009 Act to have specific regard to: ■ the safety and convenience of those using the route; ■ the desirability of it adhering to the periphery of the coast and providing views of the sea; and ■ the desirability of ensuring that, so far as is reasonably practicable, interruptions to it are kept to a minimum. 4.1.2 Since in many places there will be a choice as to the route, with each option fulfilling each of these considerations to varying degrees, it is for Natural England in its proposals to the Secretary of State to propose the balance to be struck between them on each stretch of coast. 4.1.3 The extent to which spreading room should be available to the public is relevant in striking this balance, because it is affected by our proposals about the position of the route, and may be affected by our proposals about: ■ places where the landward boundary of the coastal margin should coincide with a physical feature (see section 4.8); and ■ any local exclusions or restrictions we think are necessary.

The Coastal Margin

Development of the Coast Path Stage 2 of WSI started September 2015 – Stage 2/3 summer 2016 Stage 3 Report Autumn 2016 Stage 1 Iwade to Grain (Hoo) starts Christmas Stage 2 may take a year, from spring 2016, Stage 3 report – spring 2017

National Delivery 67 stretches nationally ~2700 miles/ 4345Km All stretches started by 2017 2020 target for completion 164Km open for use already further 344Km of route approved 4800 Km of coast 164Km open for use Work started on 998Km (~1000km) Formal proposals for 315Km

Delivery in Kent and East Sussex

Whitstable to Iwade Stage 1 Iwade to Grain (Hoo) starts Christmas Stage 2 may take a year, from spring 2016, Stage 3 report – spring 2017 Open by Autumn 2018 1: Christmas 2015 2: Spring 2016 3: Spring 2017 5: Autumn 2018

Faversham and Oare Creeks Stage 1 Iwade to Grain (Hoo) starts Christmas Stage 2 may take a year, from spring 2016, Stage 3 report – spring 2017 Open by Autumn 2018 1: Christmas 2015 2: Spring 2016 3: Spring 2017 5: Autumn 2018

Any Questions? E-mail: southeastcoastalaccess@naturalengland.org.uk Telephone: 07900 608182 Any Questions?

Faversham Creek Stage 1 Iwade to Grain (Hoo) starts Christmas Stage 2 may take a year, from spring 2016, Stage 3 report – spring 2017 Open by Autumn 2018 1: Christmas 2015 2: Spring 2016 3: Spring 2017 5: Autumn 2018