Broadband Tests John Conway FABRIC F2F-2 Poznan, Sept 25th 2006

Slides:



Advertisements
Similar presentations
E-VLBI down-under Tasso Tzioumis ATNF, CSIRO July 2005 Towards e-VLBI.
Advertisements

Digital FX Correlator Nimish Sane Center for Solar-Terrestrial Research New Jersey Institute of Technology, Newark, NJ EOVSA Technical Design Meeting.
H:\athoc\publ\heidelb\eures_1.ppt 1 Workshop MTM `99 Moving to Mobility Broadband Hybrid Fibre Radio (HFR) Access Networks: Concepts and Evolutions by.
Airmux 400 Version Slide 2 Airmux-400 in Brief Airmux-400 is a point-to-point radio solution for combined Ethernet and TDM traffic.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
Signal Processing for Aperture Arrays. AAVS1 256 antenna elements distributed over –4 stations –64 elements each.
CSIRO. Paul Roberts Digital Receivers SKANZ 2012 Digital Receivers for Radio Astronomy Paul Roberts CSIRO Astronomy and Space Science Engineering Development.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
An Enhanced/Permanent Amateur Radio Station Proposal L. McFadin, W5DID K. Banke N6IZW
Backend electronics for radioastronomy G. Comoretto.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
Nov 29, 2006Dwingeloo, EVN CBD Meeting EVN D igital B ase B and C onverter Status Report Status Report G. Tuccari.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Casper 2010Marc Torres Part 2: Building blocks for the next generation.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
Swedish LOFAR: John Conway Hamburg, Sept 17th, 2008 Onsala Space Observatory, Swedish national facility for radio astronomy, provides access for Swedish.
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
AAVS processing: Uniboard implementation. UNIBOARD Jive led FP7 project UniBoard, high integration density >> processing / m3
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
Presented by: Edgar Mendez System Engineer Specialist Airmux-400 Version 2.1 GA.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
E-MERLIN & Radio issues Simon Garrington Wide-fields (ie ~10x10 arcmin) uJy sensitivity; mas resolution key science driver for e-MERLIN ~1500 sources.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Correlator.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
Obtaining e-MERLIN Data For Use With NRAO Legacy Projects Tom Muxlow May 17 th 2006.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
Future LBO Developments
JIVE UniBoard Correlator External Review
Overview of 4Gbps connectivity for Nordic-MERLIN fringe tests
Andreas Horneffer for the LOFAR-CR Team
Digital Receivers for Radio Astronomy
Mark 5 / VLBA Correlator Topics
Concepts for a Next-Generation VLBA
Signal Processing for Aperture Arrays
EVLA Availability - or - When Can I Use It?
LFD Correlator MWA-LFD Kick-off Meeting San Diego 5-June-2006
EVN Performance and Reliability Jun Yang, JIVE 4 Dec, 2009
The Development of Broadband VLBI Technologies in SHAO
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
JIVE UniBoard Correlator (JUC) Firmware
William Stallings Data and Computer Communications
EVLA Advisory Committee Meeting System Status
Praesideo Cobranet Interface
Terry Cotter LO/IF Group Leader
Aperture Array Station Processing
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
Terry Cotter LO/IF Group Leader
John Conway Bonn, Sept 20th, 2007
SA1: third year overview
Prototype Correlator Testing
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Progress on EXPreS at JBO Ralph Spencer
Correlator Growth Path
EVLA Advisory Panel Mtg. System Overview
DBBC Stutus Report November 2007
Presentation transcript:

Broadband Tests John Conway FABRIC F2F-2 Poznan, Sept 25th 2006 Month 7 PC-EVN demo Goals for broadband eVLBI Specification and design of hardware for Onsala-MERLIN demo. Procuring 10Gbit/s Onsala link. Use of Onsala FABRIC resources manpower/money – in project context

Month 7 Demo EU forced test to demonstrate/re-establish a baseline PC-EVN performance – soaks up contributed manpower for us. Have now got an (almost) working PC-EVN at Onsala. Scheduled for Friday Oct 20th. Need to start testing NOW Part 1 – At 6cm, 256Mbit/s, record to disk at On and Jb. Then transfer to JIVE. Convert to Mk5 input and correlate. Should be easy...done several year ago. Who is ensuring this happens at JIVE ? Part 2 – At 1.3cm, Mh does ’remote recording’ to PC disk at JIVE. Jb records to disk, later transfer, translate at correlator for fringes. I

FABRIC broadband goals-1 What are we trying to do???? A prototype future eVLBI production system? Will it also do disk recording or just real time?? Major decision between PC-based or FPGA routes. Ideally must service a future EVN correlator which does not exist – can we guess its channelization? Meanwhile we do have MERLIN and LOFAR correlators – maybe we should use them (esp MERLIN) as template.

FABRIC broadband goals-2 Research project in distributed correlation, a part of the JRA but presently more useful conceptually to seperate from Broadband part. Channelisation. Present system - many tunable filters and parallel bits streams. Old reasons, tape track limit, geodesy no longer valid? eMERLIN, eVLA one thick BW. Forget past start from scratch? To minimise complexity a few chanelisation modes only for transmitter? No specific ’spectral line modes’? No of bits. eVLBI without dark fibre (unlike eMERLIN and LOFAR) is still transmit channel limited. Do RFI filtering at station end and just transmit 2bit/sample? Must decide above issues SOON/TODAY to define exact specifications of what we will build!!

FABRIC broadband goals-3 No recording, FPGA technology is the way we go???? iBoB ADC does 8bit and can digitise at Nyquist rate either 1pol of 1GHz BW or 2pol of 512MHz BW. Transmitter wil lhave smart RFI rejection and outputs 2bits/sample. ’Notch out’ filtering and outputs a limited number of digitally filtered bandwidths. Say four corresponding to 1024MHz, 512,256,128 MHz? ( 4 to 1 Gbit/s). Lower limit set by spread of OH maser lines (112MHz) , and whether network costs for 1Gbit/s are negligble when operational. At input to correlator further channelisation may be done prior to high spectral resolution correlation of multiple narrow channels.

Interim Goal- EVN stations to eMERLIN Can prototype a new astronomy capability + test out concept prior to new EVN correlator. In general seems reasonable when planning for EVN2010+ – converge on eMERLIN specs BW and freq ranges for L,C,K, (+add other bands) Operational system at L-band. 1 iBoB 512Hz x 2pol giving 4Gbit/s Could expand to have at C and K bands 2 iBoBs, sampling 1GHz of spanned BW at each pol, 2bit sampling, giving 8Gbit/s - get sqrt(2) sensitivity of eMERLIN – can eMERLIN obs 2GHz BW same time as 1GHz external.

UV Coverage Left. UV (km)– Coverage for 6 stations MERLIN + Onsala + Wb1 at dec +40deg Right . UV (lambda) shows result of MFS Multi-frequency thesis for L-band 1300-1800MHz (4Gbit/s data rate). Other possible combinations MERLIN + Onsala only, or include Bonn or Irish telescope.Not a competitor to full EVN or EVN+MERLIN, which even just in Europe has three times the resolution and 16 stations.

Parameters of 4Gbit/s Demo Dual Polarization, 512MHz spanned BW, Nyquist sampled, 2bit giving 4Gbit/s. Correlate versus eMERLIN 8bit sampled data (16Gbit/s)- potentially has same sensitivity as full 16Gbits/s but no RFI protection – less important on long baselines and can ’notch out’ any strong RFI at Onsala?? Would be very useful L-band production system, with 25m connected to MERLIN (SEFD=370Jy) . Initial test. The C and K-band eMERLIN system normally works at 3bit sampling, 2GHz spanned BW and 24Gbit/s, can it be switched to the 16Gbit/s, 8bit sampling mode for test Option 1 – test at K-band, no new fibre of LO system needed. Option 2 – Fibre to 25m, and broadband L and C band LO system. Better for operational system.

Timeline DOW has ’Prototype at Onsala station’ and ’overall broadband demo’ by Month 23 (Feb 2008). Also has eMERLIN interfaces available by Month 30 (Sept 2008) – inconsistent. eMERLIN prototype correlator arrives end of 2007. Very hard to meet Month 23 fringe deadline Have DAR at Onsala by March 2008, software integration and transmitting data from 25m to Jb at 4Gbit/s by that time. By Sept 2008 fringes?? Hire Onsala manpower by June 2007 for 1+ year????

Link Progress Discussions through SUNET on upgrading our 1Gbit/s to 10Gbit/s (they will negotiate with vendors for us, still waiting for a cost but expect to get this and order soon). Two options, link all the way into Chalmers in Gothenburg (55km) or connect to trunk in Kungsbacka. Not absolutely needed until test in Month 23, Febuary 2008. Purchase depends on price falling/depreciation. Meanwhile Mh has 10Gbit/s already. Traffic goes through Stockholm just like Onsala data– hence can test most of the route in Mh-Jb tests, all except internal Swedish part.

OPTOSUNET SUNET historically double BW every year. OPTOSUNET is successor to GIGASUNET. Dark fibres leased for a 40Gbit/s backbone- fully implemented end of 2006 Most universities connected at 10Gbit/s Allow both IP and dedicated point-to-point wavelengths (cost stucture?) For international transmissions go through NORDUNET

NORDUNET Staus as of April 2006, signals go through Stockholm to rest of world, nor sure a direct connection via Copenhagen possible – NORDUNET congress Sept 25th -30th in Göteborg

Use of Onsala Resources Onsala has from EU 1 man-year and 10kEuro for Equipment – how to use that? Option 1 – Recruit electronic engineer help work on iBoB with Mh. Ex Intl Masters student now at Berkely Wireless research group. Option 2 – Use to broadband the 25m, fibre plus new IF system. Software control of iBoB. Testing of network.